IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v150y2014icp204-214.html
   My bibliography  Save this article

A non-zero integer non-linear programming model for maintenance workforce sizing

Author

Listed:
  • Ighravwe, D.E.
  • Oke, S.A.

Abstract

This paper formulates a non-linear integer programming model to solve a maintenance workforce sizing problem with a productivity improvement goal. This problem is modelled in a bi-objective framework that minimises the number of maintenance personnel while maximising their productivity levels. Inputs into the optimisation model include monthly and routine maintenance periods, volume of production, contingency maintenance time, use factor and priority factor among others. The model has been validated with real-life detergent factory data, demonstrating its potential usefulness. A principal novelty of the model is the inclusion of use factor, which captures how often maintenance technicians are busy on the job with respect to assigned tasks, including unanticipated high maintenance workload. The model has been solved using a branch and bound algorithm. The impact of workforce structure and workers’ salaries on model’s performance has been studied and sensitivity analysis carried out to investigate the changes to the optimal solution as a result of changes in the input data. The results show a reduction in the number of maintenance workforce personnel in comparing values with and without use factor in the model. The model’s ability to obtain global optimal result depends on the value of the minimum routine maintenance time within each maintenance section. Also, the model is shown to be sensitive to priority factor, which captures the appropriate ratio of full- and part-time workers under the same category. The model provides both an easy-to-use practical tool for maintenance managers and supervisors as well as a scientific tool for determining optimal maintenance workforce size for a manufacturing plant.

Suggested Citation

  • Ighravwe, D.E. & Oke, S.A., 2014. "A non-zero integer non-linear programming model for maintenance workforce sizing," International Journal of Production Economics, Elsevier, vol. 150(C), pages 204-214.
  • Handle: RePEc:eee:proeco:v:150:y:2014:i:c:p:204-214
    DOI: 10.1016/j.ijpe.2014.01.004
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527314000061
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2014.01.004?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Al-Zubaidi, Hassan & Christer, A. H., 1997. "Maintenance manpower modelling for a hospital building complex," European Journal of Operational Research, Elsevier, vol. 99(3), pages 603-618, June.
    2. Thompson, Gary M. & Goodale, John C., 2006. "Variable employee productivity in workforce scheduling," European Journal of Operational Research, Elsevier, vol. 170(2), pages 376-390, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. He, Xinming & Rizov, Marian & Zhang, Xufei, 2022. "Workforce size adjustment as a strategic response to exchange rate shocks: A strategy-tripod application to Chinese firms," Journal of Business Research, Elsevier, vol. 138(C), pages 203-213.
    2. D. E. Ighravwe & S. A. Oke & K. A. Adebiyi, 2017. "Preventive maintenance task balancing with spare parts optimisation via big-bang big-crunch algorithm," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 811-822, November.
    3. Hesham K. Alfares, 2022. "Plant shutdown maintenance workforce team assignment and job scheduling," Journal of Scheduling, Springer, vol. 25(3), pages 321-338, June.
    4. Desmond Eseoghene Ighravwe & Sunday Ayoola Oke, 2019. "An integrated approach of SWARA and fuzzy COPRAS for maintenance technicians’ selection factors ranking," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(6), pages 1615-1626, December.
    5. D. E. Ighravwe & S. A. Oke, 2017. "A manufacturing system energy-efficient optimisation model for maintenance-production workforce size determination using integrated fuzzy logic and quality function deployment approach," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(4), pages 683-703, December.
    6. Battaïa, Olga & Delorme, Xavier & Dolgui, Alexandre & Hagemann, Johannes & Horlemann, Anika & Kovalev, Sergey & Malyutin, Sergey, 2015. "Workforce minimization for a mixed-model assembly line in the automotive industry," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 489-500.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Farzad Zaerpour & Marco Bijvank & Huiyin Ouyang & Zhankun Sun, 2022. "Scheduling of Physicians with Time‐Varying Productivity Levels in Emergency Departments," Production and Operations Management, Production and Operations Management Society, vol. 31(2), pages 645-667, February.
    2. Andreas Drexl & Martin Mundschenk, 2008. "Long-term staffing based on qualification profiles," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 68(1), pages 21-47, August.
    3. Mark W. Isken & Osman T. Aydas, 2022. "A tactical multi-week implicit tour scheduling model with applications in healthcare," Health Care Management Science, Springer, vol. 25(4), pages 551-573, December.
    4. Marta Rocha & José Oliveira & Maria Carravilla, 2014. "A constructive heuristic for staff scheduling in the glass industry," Annals of Operations Research, Springer, vol. 217(1), pages 463-478, June.
    5. Ernst, A. T. & Jiang, H. & Krishnamoorthy, M. & Sier, D., 2004. "Staff scheduling and rostering: A review of applications, methods and models," European Journal of Operational Research, Elsevier, vol. 153(1), pages 3-27, February.
    6. Budai-Balke, G. & Dekker, R. & Nicolai, R.P., 2006. "A review of planning models for maintenance and production," Econometric Institute Research Papers EI 2006-44, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    7. Akl, Amany M. & El Sawah, Sondoss & Chakrabortty, Ripon K. & Turan, Hasan Hüseyin, 2022. "A Joint Optimization of Strategic Workforce Planning and Preventive Maintenance Scheduling: A Simulation–Optimization Approach," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
    8. De Bruecker, Philippe & Van den Bergh, Jorne & Beliën, Jeroen & Demeulemeester, Erik, 2015. "Workforce planning incorporating skills: State of the art," European Journal of Operational Research, Elsevier, vol. 243(1), pages 1-16.
    9. Lin, Shih-Wei & Ying, Kuo-Ching, 2014. "Minimizing shifts for personnel task scheduling problems: A three-phase algorithm," European Journal of Operational Research, Elsevier, vol. 237(1), pages 323-334.
    10. Farahani, Poorya & Grunow, Martin & Akkerman, Renzo, 2013. "Design and operations planning of municipal foodservice systems," International Journal of Production Economics, Elsevier, vol. 144(1), pages 383-396.
    11. Cao, Nguyen Vi & Fragniere, Emmanuel, 2014. "A Service Production Planning Model Integrating Human Risk Factors," Chapters from the Proceedings of the Hamburg International Conference of Logistics (HICL), in: Kersten, Wolfgang & Blecker, Thorsten & Ringle, Christian M. (ed.), Next Generation Supply Chains: Trends and Opportunities. Proceedings of the Hamburg International Conference of Logistics (HICL), Vol. 18, volume 18, pages 345-359, Hamburg University of Technology (TUHH), Institute of Business Logistics and General Management.
    12. Van den Bergh, Jorne & Beliën, Jeroen & De Bruecker, Philippe & Demeulemeester, Erik & De Boeck, Liesje, 2013. "Personnel scheduling: A literature review," European Journal of Operational Research, Elsevier, vol. 226(3), pages 367-385.
    13. Fernandes, Rui & Gouveia, Borges & Pinho, Carlos, 2013. "A real options approach to labour shifts planning under different service level targets," European Journal of Operational Research, Elsevier, vol. 231(1), pages 182-189.
    14. Gang Li & Joy M. Field & Hongxun Jiang & Tian He & Youming Pang, 2019. "Decision Models for Workforce and Technology Planning in Services," Papers 1909.12829, arXiv.org.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:150:y:2014:i:c:p:204-214. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.