A non-zero integer non-linear programming model for maintenance workforce sizing
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2014.01.004
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Al-Zubaidi, Hassan & Christer, A. H., 1997. "Maintenance manpower modelling for a hospital building complex," European Journal of Operational Research, Elsevier, vol. 99(3), pages 603-618, June.
- Thompson, Gary M. & Goodale, John C., 2006. "Variable employee productivity in workforce scheduling," European Journal of Operational Research, Elsevier, vol. 170(2), pages 376-390, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- He, Xinming & Rizov, Marian & Zhang, Xufei, 2022.
"Workforce size adjustment as a strategic response to exchange rate shocks: A strategy-tripod application to Chinese firms,"
Journal of Business Research, Elsevier, vol. 138(C), pages 203-213.
- He, Xinming & Rizov, Marian & Zhang, Xufei, 2021. "Workforce size adjustment as a strategic response to exchange rate shocks: A strategy tripod application to Chinese firms," EconStor Open Access Articles and Book Chapters, ZBW - Leibniz Information Centre for Economics, vol. 138, pages 203-213.
- D. E. Ighravwe & S. A. Oke & K. A. Adebiyi, 2017. "Preventive maintenance task balancing with spare parts optimisation via big-bang big-crunch algorithm," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 811-822, November.
- Hesham K. Alfares, 2022. "Plant shutdown maintenance workforce team assignment and job scheduling," Journal of Scheduling, Springer, vol. 25(3), pages 321-338, June.
- Desmond Eseoghene Ighravwe & Sunday Ayoola Oke, 2019. "An integrated approach of SWARA and fuzzy COPRAS for maintenance technicians’ selection factors ranking," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(6), pages 1615-1626, December.
- D. E. Ighravwe & S. A. Oke, 2017. "A manufacturing system energy-efficient optimisation model for maintenance-production workforce size determination using integrated fuzzy logic and quality function deployment approach," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(4), pages 683-703, December.
- Battaïa, Olga & Delorme, Xavier & Dolgui, Alexandre & Hagemann, Johannes & Horlemann, Anika & Kovalev, Sergey & Malyutin, Sergey, 2015. "Workforce minimization for a mixed-model assembly line in the automotive industry," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 489-500.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Farzad Zaerpour & Marco Bijvank & Huiyin Ouyang & Zhankun Sun, 2022. "Scheduling of Physicians with Time‐Varying Productivity Levels in Emergency Departments," Production and Operations Management, Production and Operations Management Society, vol. 31(2), pages 645-667, February.
- Andreas Drexl & Martin Mundschenk, 2008. "Long-term staffing based on qualification profiles," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 68(1), pages 21-47, August.
- Mark W. Isken & Osman T. Aydas, 2022. "A tactical multi-week implicit tour scheduling model with applications in healthcare," Health Care Management Science, Springer, vol. 25(4), pages 551-573, December.
- Marta Rocha & José Oliveira & Maria Carravilla, 2014. "A constructive heuristic for staff scheduling in the glass industry," Annals of Operations Research, Springer, vol. 217(1), pages 463-478, June.
- Ernst, A. T. & Jiang, H. & Krishnamoorthy, M. & Sier, D., 2004. "Staff scheduling and rostering: A review of applications, methods and models," European Journal of Operational Research, Elsevier, vol. 153(1), pages 3-27, February.
- Budai-Balke, G. & Dekker, R. & Nicolai, R.P., 2006. "A review of planning models for maintenance and production," Econometric Institute Research Papers EI 2006-44, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Akl, Amany M. & El Sawah, Sondoss & Chakrabortty, Ripon K. & Turan, Hasan Hüseyin, 2022. "A Joint Optimization of Strategic Workforce Planning and Preventive Maintenance Scheduling: A Simulation–Optimization Approach," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
- De Bruecker, Philippe & Van den Bergh, Jorne & Beliën, Jeroen & Demeulemeester, Erik, 2015. "Workforce planning incorporating skills: State of the art," European Journal of Operational Research, Elsevier, vol. 243(1), pages 1-16.
- Lin, Shih-Wei & Ying, Kuo-Ching, 2014. "Minimizing shifts for personnel task scheduling problems: A three-phase algorithm," European Journal of Operational Research, Elsevier, vol. 237(1), pages 323-334.
- Farahani, Poorya & Grunow, Martin & Akkerman, Renzo, 2013. "Design and operations planning of municipal foodservice systems," International Journal of Production Economics, Elsevier, vol. 144(1), pages 383-396.
- Cao, Nguyen Vi & Fragniere, Emmanuel, 2014. "A Service Production Planning Model Integrating Human Risk Factors," Chapters from the Proceedings of the Hamburg International Conference of Logistics (HICL), in: Kersten, Wolfgang & Blecker, Thorsten & Ringle, Christian M. (ed.), Next Generation Supply Chains: Trends and Opportunities. Proceedings of the Hamburg International Conference of Logistics (HICL), Vol. 18, volume 18, pages 345-359, Hamburg University of Technology (TUHH), Institute of Business Logistics and General Management.
- Van den Bergh, Jorne & Beliën, Jeroen & De Bruecker, Philippe & Demeulemeester, Erik & De Boeck, Liesje, 2013. "Personnel scheduling: A literature review," European Journal of Operational Research, Elsevier, vol. 226(3), pages 367-385.
- Fernandes, Rui & Gouveia, Borges & Pinho, Carlos, 2013. "A real options approach to labour shifts planning under different service level targets," European Journal of Operational Research, Elsevier, vol. 231(1), pages 182-189.
- Gang Li & Joy M. Field & Hongxun Jiang & Tian He & Youming Pang, 2019. "Decision Models for Workforce and Technology Planning in Services," Papers 1909.12829, arXiv.org.
More about this item
Keywords
Maintenance workforce; Productivity; Goal programming; Use factor; Priority factor; Routine maintenance;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:150:y:2014:i:c:p:204-214. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.