Production control problem integrating overhaul and subcontracting strategies for a quality deteriorating manufacturing system
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2015.10.008
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Dehayem Nodem, F.I. & Kenné, J.P. & Gharbi, A., 2011. "Simultaneous control of production, repair/replacement and preventive maintenance of deteriorating manufacturing systems," International Journal of Production Economics, Elsevier, vol. 134(1), pages 271-282, November.
- Moshe Dror & Kenneth R. Smith & Candace Arai Yano, 2009. "Deux Chemicals Inc. Goes Just-in-Time," Interfaces, INFORMS, vol. 39(6), pages 503-515, December.
- Rivera-Gómez, Héctor & Gharbi, Ali & Kenné, Jean Pierre, 2013. "Joint production and major maintenance planning policy of a manufacturing system with deteriorating quality," International Journal of Production Economics, Elsevier, vol. 146(2), pages 575-587.
- Dhouib, K. & Gharbi, A. & Ben Aziza, M.N., 2012. "Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell," International Journal of Production Economics, Elsevier, vol. 137(1), pages 126-136.
- T. Bielecki & P. R. Kumar, 1988. "Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems," Operations Research, INFORMS, vol. 36(4), pages 532-541, August.
- Assid, M. & Gharbi, A. & Dhouib, K., 2015. "Joint production and subcontracting planning of unreliable multi-facility multi-product production systems," Omega, Elsevier, vol. 50(C), pages 54-69.
- Nidhal Rezg & Sofiene Dellagi & Abdelhakim Khatab, 2014. "Joint Optimization of Maintenance and Production Policies," Post-Print hal-01513938, HAL.
- Sana, Shib Sankar, 2010. "An economic production lot size model in an imperfect production system," European Journal of Operational Research, Elsevier, vol. 201(1), pages 158-170, February.
- Love, C. E. & Zhang, Z. G. & Zitron, M. A. & Guo, R., 2000. "A discrete semi-Markov decision model to determine the optimal repair/replacement policy under general repairs," European Journal of Operational Research, Elsevier, vol. 125(2), pages 398-409, September.
- Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
- Barış Tan & Stanley Gershwin, 2004. "Production and Subcontracting Strategies for Manufacturers with Limited Capacity and Volatile Demand," Annals of Operations Research, Springer, vol. 125(1), pages 205-232, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Barış Tan, 2019. "Production Control with Price, Cost, and Demand Uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 1057-1085, December.
- Polotski, V. & Kenne, J.-P. & Gharbi, A., 2019. "Joint production and maintenance optimization in flexible hybrid Manufacturing–Remanufacturing systems under age-dependent deterioration," International Journal of Production Economics, Elsevier, vol. 216(C), pages 239-254.
- Assid, M. & Gharbi, A. & Hajji, A., 2020. "Production control of failure-prone manufacturing-remanufacturing systems using mixed dedicated and shared facilities," International Journal of Production Economics, Elsevier, vol. 224(C).
- Ait-El-Cadi, Abdessamad & Gharbi, Ali & Dhouib, Karem & Artiba, Abdelhakim, 2021. "Integrated production, maintenance and quality control policy for unreliable manufacturing systems under dynamic inspection," International Journal of Production Economics, Elsevier, vol. 236(C).
- Vladimir Polotski & Jean-Pierre Kenne & Ali Gharbi, 2019. "Optimal production and corrective maintenance in a failure-prone manufacturing system under variable demand," Flexible Services and Manufacturing Journal, Springer, vol. 31(4), pages 894-925, December.
- Kenné, Jean-Pierre & Gharbi, Ali, 2018. "Production and replacement policies for a deteriorating manufacturing system under random demand and qualityAuthor-Name: Ouaret, Samir," European Journal of Operational Research, Elsevier, vol. 264(2), pages 623-636.
- Wakiru, James M. & Pintelon, Liliane & Muchiri, Peter N. & Chemweno, Peter K., 2019. "A simulation-based optimization approach evaluating maintenance and spare parts demand interaction effects," International Journal of Production Economics, Elsevier, vol. 208(C), pages 329-342.
- Rivera-Gómez, Héctor & Gharbi, Ali & Kenné, Jean-Pierre & Montaño-Arango, Oscar & Hernández-Gress, Eva Selene, 2018. "Subcontracting strategies with production and maintenance policies for a manufacturing system subject to progressive deterioration," International Journal of Production Economics, Elsevier, vol. 200(C), pages 103-118.
- Dhahri, Akrem & Gharbi, Ali & Ouhimmou, Mustapha, 2022. "Integrated production-transshipment control policy for a two-location unreliable manufacturing system," International Journal of Production Economics, Elsevier, vol. 247(C).
- Xu, Jianjun & Serrano, Alejandro & Lin, Bing, 2017. "Optimal production and rationing policy of two-stage tandem production system," International Journal of Production Economics, Elsevier, vol. 185(C), pages 100-112.
- Xiufang Zhang & Tangbin Xia & Ershun Pan & Yuqing Li, 2022. "Integrated optimization on production scheduling and imperfect preventive maintenance considering multi-degradation and learning-forgetting effects," Flexible Services and Manufacturing Journal, Springer, vol. 34(2), pages 451-482, June.
- Mohammed Haoues & Mohammed Dahane & Nadia Kenza Mouss, 2019. "Outsourcing optimization in two-echelon supply chain network under integrated production-maintenance constraints," Journal of Intelligent Manufacturing, Springer, vol. 30(2), pages 701-725, February.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Rivera-Gómez, Héctor & Gharbi, Ali & Kenné, Jean-Pierre & Montaño-Arango, Oscar & Hernández-Gress, Eva Selene, 2018. "Subcontracting strategies with production and maintenance policies for a manufacturing system subject to progressive deterioration," International Journal of Production Economics, Elsevier, vol. 200(C), pages 103-118.
- Bouslah, B. & Gharbi, A. & Pellerin, R., 2016. "Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraint," Omega, Elsevier, vol. 61(C), pages 110-126.
- Peymankar, Mahboobe & Dehghanian, Farzad & Ghiami, Yousef & Abolbashari, Mohammad Hassan, 2018. "The effects of contractual agreements on the economic production quantity model with machine breakdown," International Journal of Production Economics, Elsevier, vol. 201(C), pages 203-215.
- Assid, M. & Gharbi, A. & Dhouib, K., 2015. "Joint production and subcontracting planning of unreliable multi-facility multi-product production systems," Omega, Elsevier, vol. 50(C), pages 54-69.
- Barış Tan, 2019. "Production Control with Price, Cost, and Demand Uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 1057-1085, December.
- Hlioui, Rached & Gharbi, Ali & Hajji, Adnène, 2015. "Replenishment, production and quality control strategies in three-stage supply chain," International Journal of Production Economics, Elsevier, vol. 166(C), pages 90-102.
- Pal, Brojeswar & Sana, Shib Sankar & Chaudhuri, Kripasindhu, 2014. "Joint pricing and ordering policy for two echelon imperfect production inventory model with two cycles," International Journal of Production Economics, Elsevier, vol. 155(C), pages 229-238.
- Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
- Mohammed Alkahtani & Muhammad Omair & Qazi Salman Khalid & Ghulam Hussain & Imran Ahmad & Catalin Pruncu, 2021. "A COVID-19 Supply Chain Management Strategy Based on Variable Production under Uncertain Environment Conditions," IJERPH, MDPI, vol. 18(4), pages 1-23, February.
- Kenné, Jean-Pierre & Gharbi, Ali, 2018. "Production and replacement policies for a deteriorating manufacturing system under random demand and qualityAuthor-Name: Ouaret, Samir," European Journal of Operational Research, Elsevier, vol. 264(2), pages 623-636.
- Bouslah, B. & Gharbi, A. & Pellerin, R., 2016. "Joint economic design of production, continuous sampling inspection and preventive maintenance of a deteriorating production system," International Journal of Production Economics, Elsevier, vol. 173(C), pages 184-198.
- Song Jiu, 2021. "A two-phase approach for integrating preventive maintenance with production and delivery in an unreliable coal mine," Journal of Heuristics, Springer, vol. 27(6), pages 991-1020, December.
- Annie Francie, Kouedeu & Jean-Pierre, Kenne & Pierre, Dejax & Victor, Songmene & Vladimir, Polotski, 2014. "Stochastic optimal control of manufacturing systems under production-dependent failure rates," International Journal of Production Economics, Elsevier, vol. 150(C), pages 174-187.
- Glock, Christoph H. & Grosse, Eric H., 2021. "The impact of controllable production rates on the performance of inventory systems: A systematic review of the literature," European Journal of Operational Research, Elsevier, vol. 288(3), pages 703-720.
- Rivera-Gómez, Héctor & Gharbi, Ali & Kenné, Jean Pierre, 2013. "Joint production and major maintenance planning policy of a manufacturing system with deteriorating quality," International Journal of Production Economics, Elsevier, vol. 146(2), pages 575-587.
- Dhahri, Akrem & Gharbi, Ali & Ouhimmou, Mustapha, 2022. "Integrated production-transshipment control policy for a two-location unreliable manufacturing system," International Journal of Production Economics, Elsevier, vol. 247(C).
- Ata Allah Taleizadeh, 2018. "A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering," Annals of Operations Research, Springer, vol. 261(1), pages 303-337, February.
- Xiang Li, 2017. "Optimal procurement strategies from suppliers with random yield and all-or-nothing risks," Annals of Operations Research, Springer, vol. 257(1), pages 167-181, October.
- Xiang, Yisha, 2013. "Joint optimization of X¯ control chart and preventive maintenance policies: A discrete-time Markov chain approach," European Journal of Operational Research, Elsevier, vol. 229(2), pages 382-390.
- Manoranjan De & Barun Das & Manoranjan Maiti, 2016. "EPL models for complementary and substitute items under imperfect production process with promotional cost and selling price dependent demands," OPSEARCH, Springer;Operational Research Society of India, vol. 53(2), pages 259-277, June.
More about this item
Keywords
Quality; Manufacturing system; Production; Subcontracting; Deteriorating systems;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:171:y:2016:i:p1:p:134-150. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.