Integrated inventory and inspection policies for stochastic demand
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Michael H. Peters & Helmut Schneider & Kwei Tang, 1988. "Joint Determination of Optimal Inventory and Quality Control Policy," Management Science, INFORMS, vol. 34(8), pages 991-1004, August.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Qin, Ruwen & Cudney, Elizabeth A. & Hamzic, Zlatan, 2015. "An optimal plan of zero-defect single-sampling by attributes for incoming inspections in assembly lines," European Journal of Operational Research, Elsevier, vol. 246(3), pages 907-915.
- Hsieh, Chung-Chi & Liu, Yu-Te, 2010. "Quality investment and inspection policy in a supplier-manufacturer supply chain," European Journal of Operational Research, Elsevier, vol. 202(3), pages 717-729, May.
- Borgonovo, E., 2010. "Sensitivity analysis with finite changes: An application to modified EOQ models," European Journal of Operational Research, Elsevier, vol. 200(1), pages 127-138, January.
- Kutzner, Sarah C. & Kiesmüller, Gudrun P., 2013. "Optimal control of an inventory-production system with state-dependent random yield," European Journal of Operational Research, Elsevier, vol. 227(3), pages 444-452.
- Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
- Hlioui, Rached & Gharbi, Ali & Hajji, Adnène, 2015. "Replenishment, production and quality control strategies in three-stage supply chain," International Journal of Production Economics, Elsevier, vol. 166(C), pages 90-102.
- Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Tang, Kwei & Gong, Linguo & Chang, Dong-Shang, 2003. "Optimal process control policies under a time-varying cost structure," European Journal of Operational Research, Elsevier, vol. 149(1), pages 197-210, August.
- Jinfa Chen & David D. Yao & Shaohui Zheng, 2001. "Optimal Replenishment and Rework with Multiple Unreliable Supply Sources," Operations Research, INFORMS, vol. 49(3), pages 430-443, June.
- A. Gürhan Kök & Kevin H. Shang, 2007. "Inspection and Replenishment Policies for Systems with Inventory Record Inaccuracy," Manufacturing & Service Operations Management, INFORMS, vol. 9(2), pages 185-205, February.
- Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
- Yimin Wang, 2013. "Specification vagueness and supply quality risk," Naval Research Logistics (NRL), John Wiley & Sons, vol. 60(3), pages 222-236, April.
- Wright, CM & Mehrez, A, 1998. "An Overview of Representative Research of the Relationships Between Quality and Inventory," Omega, Elsevier, vol. 26(1), pages 29-47, February.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:185:y:2008:i:1:p:159-169. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.