IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v49y1997i3p215-223.html
   My bibliography  Save this article

An extended EMQ model for a failure prone machine with general lifetime distribution

Author

Listed:
  • Kim, Chang Hyun
  • Hong, Yushin

Abstract

No abstract is available for this item.

Suggested Citation

  • Kim, Chang Hyun & Hong, Yushin, 1997. "An extended EMQ model for a failure prone machine with general lifetime distribution," International Journal of Production Economics, Elsevier, vol. 49(3), pages 215-223, May.
  • Handle: RePEc:eee:proeco:v:49:y:1997:i:3:p:215-223
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(97)00013-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. דבי עובדיה, 1991. "קו חירום לנשים מוכות," Working Papers 203, National Insurance Institute of Israel.
    2. Hau L. Lee, 1992. "Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework," Management Science, INFORMS, vol. 38(9), pages 1314-1328, September.
    3. Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Lot Sizing with Machine Breakdowns," Management Science, INFORMS, vol. 38(1), pages 104-123, January.
    4. Evan L. Porteus, 1985. "Investing in Reduced Setups in the EOQ Model," Management Science, INFORMS, vol. 31(8), pages 998-1010, August.
    5. Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
    6. רבקה פריאור, 1991. "גמלאות נפגעי עבודה, 1989," Working Papers 496, National Insurance Institute of Israel.
    7. Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Batching with Machine Breakdowns and Safety Stocks," Operations Research, INFORMS, vol. 40(5), pages 959-971, October.
    8. יעקב צדקה, 1991. "משפחתונים לקשישים בטבריה," Working Papers 80, National Insurance Institute of Israel.
    9. Hau L. Lee & Meir J. Rosenblatt, 1987. "Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System," Management Science, INFORMS, vol. 33(9), pages 1125-1136, September.
    10. אסתר טולידנו, 1991. "מקבלי דמי אבטלה בשנת 1990," Working Papers 514, National Insurance Institute of Israel.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. K-L Hou, 2005. "Optimal production run length for deteriorating production system with a two-state continuous-time Markovian processes under allowable shortages," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(3), pages 346-350, March.
    2. Jeang, Angus, 2012. "Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown," Omega, Elsevier, vol. 40(6), pages 774-781.
    3. Yeh, Ruey Huei & Ho, Wen-Tsung & Tseng, Sheng-Tsaing, 2000. "Optimal production run length for products sold with warranty," European Journal of Operational Research, Elsevier, vol. 120(3), pages 575-582, February.
    4. Giri, B. C. & Yun, W. Y. & Dohi, T., 2005. "Optimal design of unreliable production-inventory systems with variable production rate," European Journal of Operational Research, Elsevier, vol. 162(2), pages 372-386, April.
    5. Hyun Kim, Chang & Hong, Yushin, 1999. "An optimal production run length in deteriorating production processes," International Journal of Production Economics, Elsevier, vol. 58(2), pages 183-189, January.
    6. Giri, B. C. & Dohi, T., 2004. "Optimal lot sizing for an unreliable production system based on net present value approach," International Journal of Production Economics, Elsevier, vol. 92(2), pages 157-167, November.
    7. Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
    8. B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
    9. Chung, Chun-Jen & Wee, Hui-Ming, 2008. "Green-component life-cycle value on design and reverse manufacturing in semi-closed supply chain," International Journal of Production Economics, Elsevier, vol. 113(2), pages 528-545, June.
    10. Giri, B. C. & Yun, W. Y., 2005. "Optimal lot sizing for an unreliable production system under partial backlogging and at most two failures in a production cycle," International Journal of Production Economics, Elsevier, vol. 95(2), pages 229-243, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Avkiran, Necmi K., 2001. "Investigating technical and scale efficiencies of Australian Universities through data envelopment analysis," Socio-Economic Planning Sciences, Elsevier, vol. 35(1), pages 57-80, March.
    2. Li, Y. & Ip, W. H. & Wang, D. W., 1998. "Genetic algorithm approach to earliness and tardiness production scheduling and planning problem," International Journal of Production Economics, Elsevier, vol. 54(1), pages 65-76, January.
    3. Portnov, B. A. & Etzion, Y., 2000. "Investigating the effects of public policy on the interregional patterns of population growth: the case of Israel," Socio-Economic Planning Sciences, Elsevier, vol. 34(4), pages 239-269, December.
    4. Gorman, Michael F. & Brannon, James I., 2000. "Seasonality and the production-smoothing model," International Journal of Production Economics, Elsevier, vol. 65(2), pages 173-178, April.
    5. Anjomani, Ardeshir, 2002. "Regional growth and interstate migration," Socio-Economic Planning Sciences, Elsevier, vol. 36(4), pages 239-265, December.
    6. Kalu, Timothy Ch. U., 1999. "Capital budgeting under uncertainty: An extended goal programming approach," International Journal of Production Economics, Elsevier, vol. 58(3), pages 235-251, January.
    7. Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2002. "Analysis of information flows to enhance the coordination of production processes," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 7-19, January.
    8. Malczewski, Jacek & Jackson, Marlene, 2000. "Multicriteria spatial allocation of educational resources: an overview," Socio-Economic Planning Sciences, Elsevier, vol. 34(3), pages 219-235, September.
    9. Kolisch, R., 2000. "Integration of assembly and fabrication for make-to-order production," International Journal of Production Economics, Elsevier, vol. 68(3), pages 287-306, December.
    10. Berden, Thijs P. J. & Brombacher, Aarnout C. & Sander, Peter C., 2000. "The building bricks of product quality: An overview of some basic concepts and principles," International Journal of Production Economics, Elsevier, vol. 67(1), pages 3-15, August.
    11. Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.
    12. Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
    13. Wagner, Janet M. & Shimshak, Daniel G. & Novak, Michael A., 2003. "Advances in physician profiling: the use of DEA," Socio-Economic Planning Sciences, Elsevier, vol. 37(2), pages 141-163, June.
    14. Golub, Andrew & Johnson, Bruce D., 1996. "The crack epidemic: Empirical findings support an hypothesized diffusion of innovation process," Socio-Economic Planning Sciences, Elsevier, vol. 30(3), pages 221-231, September.
    15. Jensen, Hector A. & Maturana, Sergio, 2002. "A possibilistic decision support system for imprecise mathematical programming problems," International Journal of Production Economics, Elsevier, vol. 77(2), pages 145-158, May.
    16. Kavusturucu, Ayse & Gupta, Surendra M., 1999. "Manufacturing systems with machine vacations, arbitrary topology and finite buffers," International Journal of Production Economics, Elsevier, vol. 58(1), pages 1-15, January.
    17. Kangasharju, Aki & Nijkamp, Peter, 2001. "Innovation dynamics in space: local actors and local factors," Socio-Economic Planning Sciences, Elsevier, vol. 35(1), pages 31-56, March.
    18. Ouyang, Liang-Yuh & Chang, Hung-Chi, 2002. "A minimax distribution free procedure for mixed inventory models involving variable lead time with fuzzy lost sales," International Journal of Production Economics, Elsevier, vol. 76(1), pages 1-12, March.
    19. Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
    20. Huiskonen, Janne, 2001. "Maintenance spare parts logistics: Special characteristics and strategic choices," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 125-133, May.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:49:y:1997:i:3:p:215-223. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.