Analytical analysis of a generic assembly system
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Ward Whitt, 1982. "Approximating a Point Process by a Renewal Process, I: Two Basic Methods," Operations Research, INFORMS, vol. 30(1), pages 125-147, February.
- De Boeck, Liesje, 2008. "Proofs for Coordination and synchronization of material flows in supply chains: an analytical approach," Working Papers 2008/28, Hogeschool-Universiteit Brussel, Faculteit Economie en Management.
- De Boeck, L. & Vandaele, N., 2008. "Coordination and synchronization of material flows in supply chains: An analytical approach," International Journal of Production Economics, Elsevier, vol. 116(2), pages 199-207, December.
- Matta, Andrea & Dallery, Yves & Di Mascolo, Maria, 2005. "Analysis of assembly systems controlled with kanbans," European Journal of Operational Research, Elsevier, vol. 166(2), pages 310-336, October.
- W. E. Wilhelm & Pradip Som, 1999. "Analysis of Stochastic Assembly with GI-Distributed Assembly Time," INFORMS Journal on Computing, INFORMS, vol. 11(1), pages 104-116, February.
- Kenneth R. Baker & Stephen G. Powell & David F. Pyke, 1993. "Optimal Allocation of Work in Assembly Systems," Management Science, INFORMS, vol. 39(1), pages 101-106, January.
- Baker, Kenneth R. & Powell, Stephen G., 1995. "A predictive model for the throughput of simple assembly systems," European Journal of Operational Research, Elsevier, vol. 81(2), pages 336-345, March.
- Rajan Suri & Gregory W. W. Diehl & Suzanne de Treville & Michael J. Tomsicek, 1995. "From CAN-Q to MPX: Evolution of Queuing Software for Manufacturing," Interfaces, INFORMS, vol. 25(5), pages 128-150, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Park, Chan-Woo & Lee, Hyo-Seong, 2013. "Performance evaluation of a multi-product CONWIP assembly system with correlated external demands," International Journal of Production Economics, Elsevier, vol. 144(1), pages 334-344.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- De Boeck, L. & Vandaele, N., 2008. "Coordination and synchronization of material flows in supply chains: An analytical approach," International Journal of Production Economics, Elsevier, vol. 116(2), pages 199-207, December.
- Mansouri, S. Afshin & Golmohammadi, Davood & Miller, Jason, 2019. "The moderating role of master production scheduling method on throughput in job shop systems," International Journal of Production Economics, Elsevier, vol. 216(C), pages 67-80.
- Liu, Liming & Yuan, Xue-Ming, 2001. "Throughput, flow times, and service level in an unreliable assembly system," European Journal of Operational Research, Elsevier, vol. 135(3), pages 602-615, December.
- Chang Sup Sung & Sang Hum Yoon, 1998. "Minimizing total weighted completion time at a pre-assembly stage composed of two feeding machines," International Journal of Production Economics, Elsevier, vol. 54(3), pages 247-255, May.
- Yonit Barron, 2023. "The Delay Time Profile of Multistage Networks with Synchronization," Mathematics, MDPI, vol. 11(14), pages 1-30, July.
- Jung, Jung Woo & Lee, Young Hae, 2010. "Heuristic algorithms for production and transportation planning through synchronization of a serial supply chain," International Journal of Production Economics, Elsevier, vol. 124(2), pages 433-447, April.
- Pradhan, Salil & Damodaran, Purushothaman & Srihari, Krishnaswami, 2008. "Predicting performance measures for Markovian type of manufacturing systems with product failures," European Journal of Operational Research, Elsevier, vol. 184(2), pages 725-744, January.
- Girish, Muckai K. & Hu, Jian-Qiang, 2000. "Higher order approximations for the single server queue with splitting, merging and feedback," European Journal of Operational Research, Elsevier, vol. 124(3), pages 447-467, August.
- Masselink, Inge H.J. & van der Mijden, Thomas L.C. & Litvak, Nelly & Vanberkel, Peter T., 2012. "Preparation of chemotherapy drugs: Planning policy for reduced waiting times," Omega, Elsevier, vol. 40(2), pages 181-187, April.
- Berkley, Blair J., 1996. "Analyzing service blueprints using phase distributions," European Journal of Operational Research, Elsevier, vol. 88(1), pages 152-164, January.
- Shin, Yang Woo & Moon, Dug Hee, 2011. "Approximation of M/M/c retrial queue with PH-retrial times," European Journal of Operational Research, Elsevier, vol. 213(1), pages 205-209, August.
- Engin Topan & Zeynep Avṣar, 2011. "An approximation for kanban controlled assembly systems," Annals of Operations Research, Springer, vol. 182(1), pages 133-162, January.
- Lin, Yu-Hsin & Lee, Ching-En, 2001. "A total standard WIP estimation method for wafer fabrication," European Journal of Operational Research, Elsevier, vol. 131(1), pages 78-94, May.
- Wall, A.D. & Worthington, D.J., 2007. "Time-dependent analysis of virtual waiting time behaviour in discrete time queues," European Journal of Operational Research, Elsevier, vol. 178(2), pages 482-499, April.
- Ghanmi, Ahmed, 2006. "Modeling and analysis of a Canadian Forces Geomatics division workflow," European Journal of Operational Research, Elsevier, vol. 170(3), pages 1001-1016, May.
- Nasr, Walid W. & Elshar, Ibrahim J., 2018. "Continuous inventory control with stochastic and non-stationary Markovian demand," European Journal of Operational Research, Elsevier, vol. 270(1), pages 198-217.
- Rekhi, Ishpal & Chand, Suresh & Moskowitz, Herbert, 2002. "A Note on optimal allocation of work in stochastic assembly systems," European Journal of Operational Research, Elsevier, vol. 137(2), pages 387-393, March.
- Erel, Erdal, 1998. "A study on production lines with discrete batch WIP inventory transfer," International Journal of Production Economics, Elsevier, vol. 55(1), pages 71-85, June.
- Lage Junior, Muris & Godinho Filho, Moacir, 2010. "Variations of the kanban system: Literature review and classification," International Journal of Production Economics, Elsevier, vol. 125(1), pages 13-21, May.
- Hallak, Bassam K. & Nasr, Walid W. & Jaber, Mohamad Y., 2021. "Re-ordering policies for inventory systems with recyclable items and stochastic demand – Outsourcing vs. in-house recycling," Omega, Elsevier, vol. 105(C).
More about this item
Keywords
Assembly Performance analysis Synchronization time Kit inter-arrival time Probability theory;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:131:y:2011:i:1:p:107-114. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.