IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v54y1998i3p247-255.html
   My bibliography  Save this article

Minimizing total weighted completion time at a pre-assembly stage composed of two feeding machines

Author

Listed:
  • Chang Sup Sung
  • Sang Hum Yoon

Abstract

No abstract is available for this item.

Suggested Citation

  • Chang Sup Sung & Sang Hum Yoon, 1998. "Minimizing total weighted completion time at a pre-assembly stage composed of two feeding machines," International Journal of Production Economics, Elsevier, vol. 54(3), pages 247-255, May.
  • Handle: RePEc:eee:proeco:v:54:y:1998:i:3:p:247-255
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(97)00151-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Chung-Yee Lee & T. C. E. Cheng & B. M. T. Lin, 1993. "Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem," Management Science, INFORMS, vol. 39(5), pages 616-625, May.
    2. Kenneth R. Baker & Stephen G. Powell & David F. Pyke, 1993. "Optimal Allocation of Work in Assembly Systems," Management Science, INFORMS, vol. 39(1), pages 101-106, January.
    3. תמר אליאב ולאה ענבר, 1992. "גמלאות אמהות 1990/91," Working Papers 519, National Insurance Institute of Israel.
    4. דליה גורדון ותמר אליאב, 1992. "משפחות חד הוריות, 1991," Working Papers 539, National Insurance Institute of Israel.
    5. אסתר טולידנו, 1992. "מקבלי דמי אבטלה בשנת 1991," Working Papers 563, National Insurance Institute of Israel.
    6. Edward G. Coffman & Ardavan Nozari & Mihalis Yannakakis, 1989. "Optimal Scheduling of Products with Two Subassemblies on a Single Machine," Operations Research, INFORMS, vol. 37(3), pages 426-436, June.
    7. Baker, Kenneth R. & Powell, Stephen G., 1995. "A predictive model for the throughput of simple assembly systems," European Journal of Operational Research, Elsevier, vol. 81(2), pages 336-345, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yoon, Sang Hum & Sung, Chang Sup, 2005. "Fixed pre-assembly scheduling on multiple fabrication machines," International Journal of Production Economics, Elsevier, vol. 96(1), pages 109-118, April.
    2. Ren-Xia Chen & Shi-Sheng Li, 2020. "Minimizing maximum delivery completion time for order scheduling with rejection," Journal of Combinatorial Optimization, Springer, vol. 40(4), pages 1044-1064, November.
    3. Joseph Y‐T. Leung & Haibing Li & Michael Pinedo, 2006. "Approximation algorithms for minimizing total weighted completion time of orders on identical machines in parallel," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(4), pages 243-260, June.
    4. Husam Dauod & Nieqing Cao & Debiao Li & Jaehee Kim & Sang Won Yoon & Daehan Won, 2023. "An Order Scheduling Heuristic to Minimize the Total Collation Delays and the Makespan in High-Throughput Make-to-Order Manufacturing Systems," SN Operations Research Forum, Springer, vol. 4(2), pages 1-23, June.
    5. Lee, Ik Sun, 2013. "Minimizing total tardiness for the order scheduling problem," International Journal of Production Economics, Elsevier, vol. 144(1), pages 128-134.
    6. Leung, Joseph Y.-T. & Li, Haibing & Pinedo, Michael, 2006. "Scheduling orders for multiple product types with due date related objectives," European Journal of Operational Research, Elsevier, vol. 168(2), pages 370-389, January.
    7. Leung, Joseph Y.-T. & Lee, C.Y. & Ng, C.W. & Young, G.H., 2008. "Preemptive multiprocessor order scheduling to minimize total weighted flowtime," European Journal of Operational Research, Elsevier, vol. 190(1), pages 40-51, October.
    8. T.C. Edwin Cheng & Qingqin Nong & Chi To Ng, 2011. "Polynomial‐time approximation scheme for concurrent open shop scheduling with a fixed number of machines to minimize the total weighted completion time," Naval Research Logistics (NRL), John Wiley & Sons, vol. 58(8), pages 763-770, December.
    9. Fernandez-Viagas, Victor & Talens, Carla & Framinan, Jose M., 2022. "Assembly flowshop scheduling problem: Speed-up procedure and computational evaluation," European Journal of Operational Research, Elsevier, vol. 299(3), pages 869-882.
    10. Leung, Joseph Y-T. & Li, Haibing & Pinedo, Michael & Sriskandarajah, Chelliah, 2005. "Open shops with jobs overlap--revisited," European Journal of Operational Research, Elsevier, vol. 163(2), pages 569-571, June.
    11. Kai Wang & Vincent Chau & Minming Li, 2018. "Scheduling fully parallel jobs," Journal of Scheduling, Springer, vol. 21(6), pages 619-631, December.
    12. Wang, Guoqing & Cheng, T.C. Edwin, 2007. "Customer order scheduling to minimize total weighted completion time," Omega, Elsevier, vol. 35(5), pages 623-626, October.
    13. Sung, C.S. & Kim, Hyun Ah, 2008. "A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times," International Journal of Production Economics, Elsevier, vol. 113(2), pages 1038-1048, June.
    14. Joseph Leung & Haibing Li & Michael Pinedo, 2008. "Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion time," Annals of Operations Research, Springer, vol. 159(1), pages 107-123, March.
    15. Lung-Yu Li & Jian-You Xu & Shuenn-Ren Cheng & Xingong Zhang & Win-Chin Lin & Jia-Cheng Lin & Zong-Lin Wu & Chin-Chia Wu, 2022. "A Genetic Hyper-Heuristic for an Order Scheduling Problem with Two Scenario-Dependent Parameters in a Parallel-Machine Environment," Mathematics, MDPI, vol. 10(21), pages 1-22, November.
    16. Framinan, Jose M. & Perez-Gonzalez, Paz & Fernandez-Viagas, Victor, 2019. "Deterministic assembly scheduling problems: A review and classification of concurrent-type scheduling models and solution procedures," European Journal of Operational Research, Elsevier, vol. 273(2), pages 401-417.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Bazsa, E. M. & Frenk, J. B. G. & den Iseger, P. W., 2001. "Modeling of inventory control with regenerative processes," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 263-276, May.
    2. Anjomani, Ardeshir, 2002. "Regional growth and interstate migration," Socio-Economic Planning Sciences, Elsevier, vol. 36(4), pages 239-265, December.
    3. Kalu, Timothy Ch. U., 1999. "Capital budgeting under uncertainty: An extended goal programming approach," International Journal of Production Economics, Elsevier, vol. 58(3), pages 235-251, January.
    4. Motwani, Jaideep & Mirchandani, Dinesh & Madan, Manu & Gunasekaran, A., 2002. "Successful implementation of ERP projects: Evidence from two case studies," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 83-96, January.
    5. Ginn, Martin E., 1998. "Underpinning professional career development through a systems analysis methodology," Socio-Economic Planning Sciences, Elsevier, vol. 32(1), pages 67-81, March.
    6. Gonzalez-Benito, Javier & Suarez-Gonzalez, Isabel & Spring, Martin, 2000. "Complementarities between JIT purchasing practices: An economic analysis based on transaction costs," International Journal of Production Economics, Elsevier, vol. 67(3), pages 279-293, October.
    7. Bal, F. & Button, K. J. & Nijkamp, P., 2002. "Ceteris paribus, meta-analysis and value transfer," Socio-Economic Planning Sciences, Elsevier, vol. 36(2), pages 127-138, June.
    8. Albino, Vito & Izzo, Carmen & Kuhtz, Silvana, 2002. "Input-output models for the analysis of a local/global supply chain," International Journal of Production Economics, Elsevier, vol. 78(2), pages 119-131, July.
    9. Ekins, Paul & Simon, Sandrine, 2003. "An illustrative application of the CRITINC framework to the UK," Ecological Economics, Elsevier, vol. 44(2-3), pages 255-275, March.
    10. Andersson, Jonas & Melchiors, Philip, 2001. "A two-echelon inventory model with lost sales," International Journal of Production Economics, Elsevier, vol. 69(3), pages 307-315, February.
    11. Shibuya, Takeshi & Dohi, Tadashi & Osaki, Shunji, 1998. "Optimal continuous review policies for spare part provisioning with random lead times," International Journal of Production Economics, Elsevier, vol. 55(3), pages 257-271, August.
    12. Metcalfe, Beverly, 1997. "Project management system design: A social and organisational analysis," International Journal of Production Economics, Elsevier, vol. 52(3), pages 305-316, October.
    13. Kim, Kap Hwan, 1995. "Positioning of automated guided vehicles in a loop layout to minimize the mean vehicle response time," International Journal of Production Economics, Elsevier, vol. 39(3), pages 201-214, May.
    14. Maffin, David & Braiden, Paul, 2001. "Manufacturing and supplier roles in product development," International Journal of Production Economics, Elsevier, vol. 69(2), pages 205-213, January.
    15. Ertugrul Karsak, E. & Tolga, Ethem, 2001. "Fuzzy multi-criteria decision-making procedure for evaluating advanced manufacturing system investments," International Journal of Production Economics, Elsevier, vol. 69(1), pages 49-64, January.
    16. Forza, C. & Salvador, F., 2001. "Information flows for high-performance manufacturing," International Journal of Production Economics, Elsevier, vol. 70(1), pages 21-36, March.
    17. Bell, Michelle L. & Hobbs, Benjamin F. & Ellis, Hugh, 2003. "The use of multi-criteria decision-making methods in the integrated assessment of climate change: implications for IA practitioners," Socio-Economic Planning Sciences, Elsevier, vol. 37(4), pages 289-316, December.
    18. Witzerman, James P. & Nof, Shimon Y., 1995. "Tool integration for collaborative design of manufacturing cells," International Journal of Production Economics, Elsevier, vol. 38(1), pages 23-30, March.
    19. van den Berg, Jeroen P., 2002. "Analytic expressions for the optimal dwell point in an automated storage/retrieval system," International Journal of Production Economics, Elsevier, vol. 76(1), pages 13-25, March.
    20. Giannoccaro, Ilaria & Pontrandolfo, Pierpaolo, 2002. "Inventory management in supply chains: a reinforcement learning approach," International Journal of Production Economics, Elsevier, vol. 78(2), pages 153-161, July.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:54:y:1998:i:3:p:247-255. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.