IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v135y2001i3p602-615.html
   My bibliography  Save this article

Throughput, flow times, and service level in an unreliable assembly system

Author

Listed:
  • Liu, Liming
  • Yuan, Xue-Ming

Abstract

No abstract is available for this item.

Suggested Citation

  • Liu, Liming & Yuan, Xue-Ming, 2001. "Throughput, flow times, and service level in an unreliable assembly system," European Journal of Operational Research, Elsevier, vol. 135(3), pages 602-615, December.
  • Handle: RePEc:eee:ejores:v:135:y:2001:i:3:p:602-615
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(01)00028-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Liu, Xiao-Gao & Buzacott, John A., 1990. "Approximate models of assembly systems with finite inventory banks," European Journal of Operational Research, Elsevier, vol. 45(2-3), pages 143-154, April.
    2. Eginhard J. Muth, 1979. "The Reversibility Property of Production Lines," Management Science, INFORMS, vol. 25(2), pages 152-158, February.
    3. Kenneth R. Baker & Stephen G. Powell & David F. Pyke, 1993. "Optimal Allocation of Work in Assembly Systems," Management Science, INFORMS, vol. 39(1), pages 101-106, January.
    4. Baker, Kenneth R. & Powell, Stephen G., 1995. "A predictive model for the throughput of simple assembly systems," European Journal of Operational Research, Elsevier, vol. 81(2), pages 336-345, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yi‐Chun Tsai & Nilay Tanık Argon, 2008. "Dynamic server assignment policies for assembly‐type queues with flexible servers," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(3), pages 234-251, April.
    2. Mansouri, S. Afshin & Golmohammadi, Davood & Miller, Jason, 2019. "The moderating role of master production scheduling method on throughput in job shop systems," International Journal of Production Economics, Elsevier, vol. 216(C), pages 67-80.
    3. Saeed Yaghoubi, 2015. "Due-date assignment for multi-server multi-stage assembly systems," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(7), pages 1246-1256, May.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. De Boeck, L. & Vandaele, N., 2008. "Coordination and synchronization of material flows in supply chains: An analytical approach," International Journal of Production Economics, Elsevier, vol. 116(2), pages 199-207, December.
    2. Mansouri, S. Afshin & Golmohammadi, Davood & Miller, Jason, 2019. "The moderating role of master production scheduling method on throughput in job shop systems," International Journal of Production Economics, Elsevier, vol. 216(C), pages 67-80.
    3. Chang Sup Sung & Sang Hum Yoon, 1998. "Minimizing total weighted completion time at a pre-assembly stage composed of two feeding machines," International Journal of Production Economics, Elsevier, vol. 54(3), pages 247-255, May.
    4. De Boeck, Liesje & Vandaele, Nico, 2011. "Analytical analysis of a generic assembly system," International Journal of Production Economics, Elsevier, vol. 131(1), pages 107-114, May.
    5. Saeed Yaghoubi, 2015. "Due-date assignment for multi-server multi-stage assembly systems," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(7), pages 1246-1256, May.
    6. Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.
    7. Papadopoulos, H. T. & Vidalis, M. I., 2001. "Minimizing WIP inventory in reliable production lines," International Journal of Production Economics, Elsevier, vol. 70(2), pages 185-197, March.
    8. Steven J. Erlebacher & Medini R. Singh, 1999. "Optimal Variance Structures and Performance Improvement of Synchronous Assembly Lines," Operations Research, INFORMS, vol. 47(4), pages 601-618, August.
    9. Nakade, Koichi, 2000. "New bounds for expected cycle times in tandem queues with blocking," European Journal of Operational Research, Elsevier, vol. 125(1), pages 84-92, August.
    10. Erel, Erdal, 1998. "A study on production lines with discrete batch WIP inventory transfer," International Journal of Production Economics, Elsevier, vol. 55(1), pages 71-85, June.
    11. Jeffrey M. Alden & Lawrence D. Burns & Theodore Costy & Richard D. Hutton & Craig A. Jackson & David S. Kim & Kevin A. Kohls & Jonathan H. Owen & Mark A. Turnquist & David J. Vander Veen, 2006. "General Motors Increases Its Production Throughput," Interfaces, INFORMS, vol. 36(1), pages 6-25, February.
    12. Vincent W. Slaugh & Bahar Biller & Sridhar R. Tayur, 2016. "Managing Rentals with Usage-Based Loss," Manufacturing & Service Operations Management, INFORMS, vol. 18(3), pages 429-444, July.
    13. Sachs, F.E. & Helber, S. & Kiesmüller, G.P., 2022. "Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning," European Journal of Operational Research, Elsevier, vol. 302(2), pages 544-559.
    14. Xiang Zhong & Hyo Kyung Lee & Molly Williams & Sally Kraft & Jeffery Sleeth & Richard Welnick & Lori Hauschild & Jingshan Li, 2018. "Workload balancing: staffing ratio analysis for primary care redesign," Flexible Services and Manufacturing Journal, Springer, vol. 30(1), pages 6-29, June.
    15. Liu, Liming & Yuan, Xue-Ming & Liu, John J., 2004. "Operational capacity allocation for unreliable module-based assembly systems," European Journal of Operational Research, Elsevier, vol. 155(1), pages 134-153, May.
    16. Kamburowski, Jerzy, 1999. "Stochastically minimizing the makespan in two-machine flow shops without blocking," European Journal of Operational Research, Elsevier, vol. 112(2), pages 304-309, January.
    17. Dhouib, K. & Gharbi, A. & Landolsi, N., 2009. "Throughput assessment of mixed-model flexible transfer lines with unreliable machines," International Journal of Production Economics, Elsevier, vol. 122(2), pages 619-627, December.
    18. Kamburowski, J., 1997. "The nature of simplicity of Johnson's algorithm," Omega, Elsevier, vol. 25(5), pages 581-584, October.
    19. O'Connell, Neil & Yor, Marc, 2001. "Brownian analogues of Burke's theorem," Stochastic Processes and their Applications, Elsevier, vol. 96(2), pages 285-304, December.
    20. Hyoungtae Kim & Sungsoo Park, 1999. "Optimality of the Symmetric Workload Allocation in a Single-Server Flow Line System," Management Science, INFORMS, vol. 45(3), pages 449-451, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:135:y:2001:i:3:p:602-615. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.