Inventory control in a multi-supplier system
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Sedarage, Dayani & Fujiwara, Okitsugu & Trung Luong, Huynh, 1999. "Determining optimal order splitting and reorder level for N-supplier inventory systems," European Journal of Operational Research, Elsevier, vol. 116(2), pages 389-404, July.
- Dolgui, Alexandre & Ould-Louly, Mohamed-Aly, 2002. "A model for supply planning under lead time uncertainty," International Journal of Production Economics, Elsevier, vol. 78(2), pages 145-152, July.
- Ranga V. Ramasesh & J. Keith Ord & Jack C. Hayya & Andrew Pan, 1991. "Sole Versus Dual Sourcing in Stochastic Lead-Time (s, Q) Inventory Models," Management Science, INFORMS, vol. 37(4), pages 428-443, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Hennet, Jean-Claude & Mahjoub, Sonia, 2010. "Toward the fair sharing of profit in a supply network formation," International Journal of Production Economics, Elsevier, vol. 127(1), pages 112-120, September.
- Louly, Mohamed-Aly & Dolgui, Alexandre & Hnaien, Faicel, 2008. "Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint," International Journal of Production Economics, Elsevier, vol. 115(1), pages 236-247, September.
- Louly, Mohamed-Aly & Dolgui, Alexandre, 2012. "A note on analytic calculation of planned lead times for assembly systems under POQ policy and service level constraint," International Journal of Production Economics, Elsevier, vol. 140(2), pages 778-781.
- Golini, Ruggero & Kalchschmidt, Matteo, 2011. "Moderating the impact of global sourcing on inventories through supply chain management," International Journal of Production Economics, Elsevier, vol. 133(1), pages 86-94, September.
- Ahiska, S. Sebnem & Appaji, Samyuktha R. & King, Russell E. & Warsing, Donald P., 2013. "A Markov decision process-based policy characterization approach for a stochastic inventory control problem with unreliable sourcing," International Journal of Production Economics, Elsevier, vol. 144(2), pages 485-496.
- Luo, Sha & Ahiska, S. Sebnem & Fang, Shu-Cherng & King, Russell E. & Warsing, Donald P. & Wu, Shuohao, 2021. "An analysis of optimal ordering policies for a two-supplier system with disruption risk," Omega, Elsevier, vol. 105(C).
- Sagawa, Juliana Keiko & Nagano, Marcelo Seido, 2015. "Modeling the dynamics of a multi-product manufacturing system: A real case application," European Journal of Operational Research, Elsevier, vol. 244(2), pages 624-636.
- Ben-Ammar, Oussama & Dolgui, Alexandre & Wu, Desheng Dash, 2018. "Planned lead times optimization for multi-level assembly systems under uncertainties," Omega, Elsevier, vol. 78(C), pages 39-56.
- Schemeleva, Kseniya & Delorme, Xavier & Dolgui, Alexandre, 2018. "Evaluation of solution approaches for a stochastic lot-sizing and sequencing problem," International Journal of Production Economics, Elsevier, vol. 199(C), pages 179-192.
- Taher Ahmadi & Zümbül Atan & Ton Kok & Ivo Adan, 2020. "Time-based service constraints for inventory systems with commitment lead time," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 42(2), pages 355-395, June.
- Lamia Triqui Sari & Jean-Claude Hennet, 2016. "Cooperative inventory planning in a distribution network," International Journal of Production Research, Taylor & Francis Journals, vol. 54(19), pages 5916-5931, October.
- Mohammad Alaghebandha & Vahid Hajipour, 2015. "A soft computing-based approach to optimise queuing-inventory control problem," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(6), pages 1113-1130, April.
- Skintzi, Georgia & Ioannou, George & Prastacos, Gregory, 2008. "Investigating warehousing policies," International Journal of Production Economics, Elsevier, vol. 112(2), pages 955-970, April.
- Cheaitou, Ali & van Delft, Christian, 2013. "Finite horizon stochastic inventory problem with dual sourcing: Near myopic and heuristics bounds," International Journal of Production Economics, Elsevier, vol. 143(2), pages 371-378.
- Svoboda, Josef & Minner, Stefan & Yao, Man, 2021. "Typology and literature review on multiple supplier inventory control models," European Journal of Operational Research, Elsevier, vol. 293(1), pages 1-23.
- Louly, Mohamed-Aly & Dolgui, Alexandre, 2013. "Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint," International Journal of Production Economics, Elsevier, vol. 143(1), pages 35-40.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Svoboda, Josef & Minner, Stefan & Yao, Man, 2021. "Typology and literature review on multiple supplier inventory control models," European Journal of Operational Research, Elsevier, vol. 293(1), pages 1-23.
- Meena, P.L. & Sarmah, S.P., 2013. "Multiple sourcing under supplier failure risk and quantity discount: A genetic algorithm approach," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 50(C), pages 84-97.
- Gérard P. Cachon & Fuqiang Zhang, 2006. "Procuring Fast Delivery: Sole Sourcing with Information Asymmetry," Management Science, INFORMS, vol. 52(6), pages 881-896, June.
- Huang, Rongbing & Menezes, Mozart B.C. & Kim, Seokjin, 2012. "The impact of cost uncertainty on the location of a distribution center," European Journal of Operational Research, Elsevier, vol. 218(2), pages 401-407.
- Louly, Mohamed-Aly & Dolgui, Alexandre & Hnaien, Faicel, 2008. "Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint," International Journal of Production Economics, Elsevier, vol. 115(1), pages 236-247, September.
- Louly, Mohamed-Aly Ould & Dolgui, Alexandre, 2009. "Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm," European Journal of Operational Research, Elsevier, vol. 199(3), pages 723-731, December.
- Mitra, Subrata, 2009. "Analysis of a two-echelon inventory system with returns," Omega, Elsevier, vol. 37(1), pages 106-115, February.
- Zeinab Sazvar & Mohammad Reza Akbari Jokar & Armand Baboli, 2014. "A new order splitting model with stochastic lead times for deterioration items," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(9), pages 1936-1954, September.
- Jong Soo Kim & K Y Shin & S E Ahn, 2003. "A multiple replenishment contract with ARIMA demand processes," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(11), pages 1189-1197, November.
- Minner, Stefan, 2003. "Multiple-supplier inventory models in supply chain management: A review," International Journal of Production Economics, Elsevier, vol. 81(1), pages 265-279, January.
- Sarkar, Ashutosh & Mohapatra, Pratap K.J., 2009. "Determining the optimal size of supply base with the consideration of risks of supply disruptions," International Journal of Production Economics, Elsevier, vol. 119(1), pages 122-135, May.
- Ryu, Si Wook & Lee, Kyung Keun, 2003. "A stochastic inventory model of dual sourced supply chain with lead-time reduction," International Journal of Production Economics, Elsevier, vol. 81(1), pages 513-524, January.
- Tang, Christopher S., 2006. "Perspectives in supply chain risk management," International Journal of Production Economics, Elsevier, vol. 103(2), pages 451-488, October.
- A K Mishra & P R Tadikamalla, 2006. "Order splitting in single sourcing with scheduled-release orders," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(2), pages 177-189, February.
- Ben-Ammar, Oussama & Bettayeb, Belgacem & Dolgui, Alexandre, 2019. "Optimization of multi-period supply planning under stochastic lead times and a dynamic demand," International Journal of Production Economics, Elsevier, vol. 218(C), pages 106-117.
- Qi, Xiangtong, 2007. "Order splitting with multiple capacitated suppliers," European Journal of Operational Research, Elsevier, vol. 178(2), pages 421-432, April.
- Konur, Dinçer & Campbell, James F. & Monfared, Sepideh A., 2017. "Economic and environmental considerations in a stochastic inventory control model with order splitting under different delivery schedules among suppliers," Omega, Elsevier, vol. 71(C), pages 46-65.
- Bayindir, Z. Pelin & Erkip, Nesim & Gullu, Refik, 2003. "A model to evaluate inventory costs in a remanufacturing environment," International Journal of Production Economics, Elsevier, vol. 81(1), pages 597-607, January.
- Xin X. He & Susan H. Xu & J. Keith Ord & Jack C. Hayya, 1998. "An Inventory Model with Order Crossover," Operations Research, INFORMS, vol. 46(3-supplem), pages 112-119, June.
- Kamran Moinzadeh & Steven Nahmias, 2000. "Adjustment Strategies for a Fixed Delivery Contract," Operations Research, INFORMS, vol. 48(3), pages 408-423, June.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:104:y:2006:i:2:p:249-259. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.