A Markov decision process-based policy characterization approach for a stochastic inventory control problem with unreliable sourcing
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2013.03.021
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Parlar, Mahmut & Wang, Yunzeng & Gerchak, Yigal, 1995. "A periodic review inventory model with Markovian supply availability," International Journal of Production Economics, Elsevier, vol. 42(2), pages 131-136, December.
- Yeo, Wee Meng & Yuan, Xue-Ming, 2011. "Optimal inventory policy with supply uncertainty and demand cancellation," European Journal of Operational Research, Elsevier, vol. 211(1), pages 26-34, May.
- Ranga V. Ramasesh & J. Keith Ord & Jack C. Hayya & Andrew Pan, 1991. "Sole Versus Dual Sourcing in Stochastic Lead-Time (s, Q) Inventory Models," Management Science, INFORMS, vol. 37(4), pages 428-443, April.
- Sebnem Ahiska, S. & King, Russell E., 2010. "Inventory optimization in a one product recoverable manufacturing system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 11-19, March.
- Parlar, Mahmut, 1997. "Continuous-review inventory problem with random supply interruptions," European Journal of Operational Research, Elsevier, vol. 99(2), pages 366-385, June.
- Gad Allon & Jan A. Van Mieghem, 2010. "Global Dual Sourcing: Tailored Base-Surge Allocation to Near- and Offshore Production," Management Science, INFORMS, vol. 56(1), pages 110-124, January.
- Ravi Anupindi & Ram Akella, 1993. "Diversification Under Supply Uncertainty," Management Science, INFORMS, vol. 39(8), pages 944-963, August.
- Brian Tomlin, 2006. "On the Value of Mitigation and Contingency Strategies for Managing Supply Chain Disruption Risks," Management Science, INFORMS, vol. 52(5), pages 639-657, May.
- Joachim Arts & Marcel van Vuuren & Gudrun Kiesmüller, 2011. "Efficient optimization of the dual-index policy using Markov chains," IISE Transactions, Taylor & Francis Journals, vol. 43(8), pages 604-620.
- Ding, Fong-Yuen & Hodgson, Thom J. & King, Russell E., 1988. "A methodology for computation reduction for specially structured large scale Markov decision problems," European Journal of Operational Research, Elsevier, vol. 34(1), pages 105-112, February.
- Kelle, Peter & Miller, Pam Anders, 2001. "Stockout risk and order splitting," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 407-415, May.
- Thomas E. Morton, 1971. "Technical Note—On the Asymptotic Convergence Rate of Cost Differences for Markovian Decision Processes," Operations Research, INFORMS, vol. 19(1), pages 244-248, February.
- Ryu, Si Wook & Lee, Kyung Keun, 2003. "A stochastic inventory model of dual sourced supply chain with lead-time reduction," International Journal of Production Economics, Elsevier, vol. 81(1), pages 513-524, January.
- Ahiska, S. Sebnem & King, Russell E., 2010. "Life cycle inventory policy characterizations for a single-product recoverable system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 51-61, March.
- Y. Bassok & R. Akella, 1991. "Ordering and Production Decisions with Supply Quality and Demand Uncertainty," Management Science, INFORMS, vol. 37(12), pages 1556-1574, December.
- Senthil Veeraraghavan & Alan Scheller-Wolf, 2008. "Now or Later: A Simple Policy for Effective Dual Sourcing in Capacitated Systems," Operations Research, INFORMS, vol. 56(4), pages 850-864, August.
- Parlar, Mahmut & Perry, David, 1995. "Analysis of a (Q, r, T) inventory policy with deterministic and random yields when future supply is uncertain," European Journal of Operational Research, Elsevier, vol. 84(2), pages 431-443, July.
- Mohebbi, Esmail & Hao, Daipeng, 2008. "An inventory model with non-resuming randomly interruptible lead time," International Journal of Production Economics, Elsevier, vol. 114(2), pages 755-768, August.
- Mohebbi, Esmail & Hao, Daipeng, 2006. "When supplier's availability affects the replenishment lead time--An extension of the supply-interruption problem," European Journal of Operational Research, Elsevier, vol. 175(2), pages 992-1008, December.
- Ülkü Gürler & Mahmut Parlar, 1997. "An Inventory Problem with Two Randomly Available Suppliers," Operations Research, INFORMS, vol. 45(6), pages 904-918, December.
- Kamran Moinzadeh & Hau L. Lee, 1989. "Approximate Order Quantities and Reorder Points for Inventory Systems Where Orders Arrive in Two Shipments," Operations Research, INFORMS, vol. 37(2), pages 277-287, April.
- Parlar, Mahmut & Wang, Dan, 1993. "Diversification under yield randomness in inventory models," European Journal of Operational Research, Elsevier, vol. 66(1), pages 52-64, April.
- Arda, Yasemin & Hennet, Jean-Claude, 2006. "Inventory control in a multi-supplier system," International Journal of Production Economics, Elsevier, vol. 104(2), pages 249-259, December.
- Gullu, Refik & Onol, Ebru & Erkip, Nesim, 1999. "Analysis of an inventory system under supply uncertainty," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 377-385, March.
- Mahmut Parlar, 2000. "Probabilistic Analysis of Renewal Cycles: An Application to a Non-Markovian Inventory Problem with Multiple Objectives," Operations Research, INFORMS, vol. 48(2), pages 243-255, April.
- Serel, Dogan A., 2008. "Inventory and pricing decisions in a single-period problem involving risky supply," International Journal of Production Economics, Elsevier, vol. 116(1), pages 115-128, November.
- Anshul Sheopuri & Ganesh Janakiraman & Sridhar Seshadri, 2010. "New Policies for the Stochastic Inventory Control Problem with Two Supply Sources," Operations Research, INFORMS, vol. 58(3), pages 734-745, June.
- Giri, B.C., 2011. "Managing inventory with two suppliers under yield uncertainty and risk aversion," International Journal of Production Economics, Elsevier, vol. 133(1), pages 80-85, September.
- Mordechai Henig & Yigal Gerchak, 1990. "The Structure of Periodic Review Policies in the Presence of Random Yield," Operations Research, INFORMS, vol. 38(4), pages 634-643, August.
- Mohebbi, Esmail, 2004. "A replenishment model for the supply-uncertainty problem," International Journal of Production Economics, Elsevier, vol. 87(1), pages 25-37, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Tai, Allen H. & Ching, Wai-Ki, 2014. "Optimal inventory policy for a Markovian two-echelon system with returns and lateral transshipment," International Journal of Production Economics, Elsevier, vol. 151(C), pages 48-55.
- Svoboda, Josef & Minner, Stefan & Yao, Man, 2021. "Typology and literature review on multiple supplier inventory control models," European Journal of Operational Research, Elsevier, vol. 293(1), pages 1-23.
- Naudé, Wim, 2022. "The Future Economics of Artificial Intelligence: Mythical Agents, a Singleton and the Dark Forest," IZA Discussion Papers 15713, Institute of Labor Economics (IZA).
- Mou, Shandong & Robb, David J. & DeHoratius, Nicole, 2018. "Retail store operations: Literature review and research directions," European Journal of Operational Research, Elsevier, vol. 265(2), pages 399-422.
- Komeyl Baghizadeh & Nafiseh Ebadi & Dominik Zimon & Luay Jum’a, 2022. "Using Four Metaheuristic Algorithms to Reduce Supplier Disruption Risk in a Mathematical Inventory Model for Supplying Spare Parts," Mathematics, MDPI, vol. 11(1), pages 1-19, December.
- Zhu, Stuart X., 2015. "Dynamic replenishment from two sources with different yields, costs, and leadtimes," International Journal of Production Economics, Elsevier, vol. 165(C), pages 79-89.
- Hashemi-Petroodi, S. Ehsan & Thevenin, Simon & Kovalev, Sergey & Dolgui, Alexandre, 2023. "Markov decision process for multi-manned mixed-model assembly lines with walking workers," International Journal of Production Economics, Elsevier, vol. 255(C).
- Faiza Hamdi & Ahmed Ghorbel & Faouzi Masmoudi & Lionel Dupont, 2018. "Optimization of a supply portfolio in the context of supply chain risk management: literature review," Journal of Intelligent Manufacturing, Springer, vol. 29(4), pages 763-788, April.
- Montanari, Roberto & Bottani, Eleonora & Shekarian, Ehsan & Kazemi, Nima, 2017. "A model for the analysis of procurement strategies in the economic order interval environment," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 134(C), pages 79-98.
- Asadi, Amin & Nurre Pinkley, Sarah, 2021. "A stochastic scheduling, allocation, and inventory replenishment problem for battery swap stations," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 146(C).
- Shih-Hsien Tseng & Jia-Chen Yu, 2019. "Data-Driven Iron and Steel Inventory Control Policies," Mathematics, MDPI, vol. 7(8), pages 1-15, August.
- Golmohammadi, Amirmohsen & Taghavi, Majid & Farivar, Samira & Azad, Nader, 2018. "Three strategies for engaging a buyer in supplier development efforts," International Journal of Production Economics, Elsevier, vol. 206(C), pages 1-14.
- Fianu, Sefakor & Davis, Lauren B., 2018. "A Markov decision process model for equitable distribution of supplies under uncertainty," European Journal of Operational Research, Elsevier, vol. 264(3), pages 1101-1115.
- Luo, Sha & Ahiska, S. Sebnem & Fang, Shu-Cherng & King, Russell E. & Warsing, Donald P. & Wu, Shuohao, 2021. "An analysis of optimal ordering policies for a two-supplier system with disruption risk," Omega, Elsevier, vol. 105(C).
- Haolan Liao & Qianwang Deng & Yuanrui Wang, 2017. "Optimal Acquisition and Production Policy for End-of-Life Engineering Machinery Recovering in a Joint Manufacturing/Remanufacturing System under Uncertainties in Procurement and Demand," Sustainability, MDPI, vol. 9(3), pages 1-19, February.
- Naudé, Wim, 2023. "Artificial Intelligence and the Economics of Decision-Making," IZA Discussion Papers 16000, Institute of Labor Economics (IZA).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Svoboda, Josef & Minner, Stefan & Yao, Man, 2021. "Typology and literature review on multiple supplier inventory control models," European Journal of Operational Research, Elsevier, vol. 293(1), pages 1-23.
- Cheaitou, Ali & Cheaytou, Rima, 2019. "A two-stage capacity reservation supply contract with risky supplier and forecast updating," International Journal of Production Economics, Elsevier, vol. 209(C), pages 42-60.
- Bin Zhang & Zekai Lai & Qiangqiang Wang, 2021. "Multi-product dual sourcing problem with limited capacities," Operational Research, Springer, vol. 21(3), pages 2055-2075, September.
- Cheaitou, Ali & van Delft, Christian, 2013. "Finite horizon stochastic inventory problem with dual sourcing: Near myopic and heuristics bounds," International Journal of Production Economics, Elsevier, vol. 143(2), pages 371-378.
- Saedi, Samira & Kundakcioglu, O. Erhun & Henry, Andrea C., 2016. "Mitigating the impact of drug shortages for a healthcare facility: An inventory management approach," European Journal of Operational Research, Elsevier, vol. 251(1), pages 107-123.
- Seung Hwan Jung, 2020. "Offshore versus Onshore Sourcing: Quick Response, Random Yield, and Competition," Production and Operations Management, Production and Operations Management Society, vol. 29(3), pages 750-766, March.
- Hishamuddin, H. & Sarker, R.A. & Essam, D., 2012. "A disruption recovery model for a single stage production-inventory system," European Journal of Operational Research, Elsevier, vol. 222(3), pages 464-473.
- Serel, Dogan A., 2008. "Inventory and pricing decisions in a single-period problem involving risky supply," International Journal of Production Economics, Elsevier, vol. 116(1), pages 115-128, November.
- Saeed Poormoaied & Ece Zeliha Demirci, 2021. "Analysis of an inventory system with emergency ordering option at the time of supply disruption," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 43(4), pages 1007-1045, December.
- Zhu, Stuart X., 2015. "Dynamic replenishment from two sources with different yields, costs, and leadtimes," International Journal of Production Economics, Elsevier, vol. 165(C), pages 79-89.
- Sevgen, Arya & Sargut, F. Zeynep, 2019. "May reorder point help under disruptions?," International Journal of Production Economics, Elsevier, vol. 209(C), pages 61-69.
- Sunil Chopra & Gilles Reinhardt & Usha Mohan, 2007. "The importance of decoupling recurrent and disruption risks in a supply chain," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(5), pages 544-555, August.
- Gel, Esma S. & Salman, F. Sibel, 2022. "Dynamic ordering decisions with approximate learning of supply yield uncertainty," International Journal of Production Economics, Elsevier, vol. 243(C).
- Brian Tomlin, 2009. "Impact of Supply Learning When Suppliers Are Unreliable," Manufacturing & Service Operations Management, INFORMS, vol. 11(2), pages 192-209, August.
- Hishamuddin, Hawa & Sarker, Ruhul A. & Essam, Daryl, 2014. "A recovery mechanism for a two echelon supply chain system under supply disruption," Economic Modelling, Elsevier, vol. 38(C), pages 555-563.
- Paul Rowe & Burak Eksioglu & Sandra Eksioglu, 2017. "Recycling procurement strategies with variable yield suppliers," Annals of Operations Research, Springer, vol. 249(1), pages 215-234, February.
- Luo, Sha & Ahiska, S. Sebnem & Fang, Shu-Cherng & King, Russell E. & Warsing, Donald P. & Wu, Shuohao, 2021. "An analysis of optimal ordering policies for a two-supplier system with disruption risk," Omega, Elsevier, vol. 105(C).
- Mohebbi, Esmail & Hao, Daipeng, 2008. "An inventory model with non-resuming randomly interruptible lead time," International Journal of Production Economics, Elsevier, vol. 114(2), pages 755-768, August.
- Narendra Agrawal & Steven Nahmias, 1997. "Rationalization Of The Supplier Base In The Presence Of Yield Uncertainty," Production and Operations Management, Production and Operations Management Society, vol. 6(3), pages 291-308, September.
- Silbermayr, Lena & Minner, Stefan, 2014. "A multiple sourcing inventory model under disruption risk," International Journal of Production Economics, Elsevier, vol. 149(C), pages 37-46.
More about this item
Keywords
Unreliable supply; Dual sourcing; Inventory policy characterization; Markov decision process;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:144:y:2013:i:2:p:485-496. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.