Abstract

In seeking to maximise NPV (Net Present Value), open pit mining schedules depend on optimal sequencing of pit progress along with ore-waste segregation. Although extensively researched using mathematical models and linear programs dating from the late 1960s, this subject continues to evolve with the emergence of innovative approaches and new computational techniques. Whereas past models have focused almost exclusively on ore extraction as the principal cost-intensity factor, waste movement and handling are less well understood. However, as it comprises some of the largest operational and reclamation expenses, waste management has been progressively incorporated into the mine scheduling process, with dedicated studies commencing from 2007. This paper focuses on the impact of waste movement and placement on pit schedule optimisation, with strategic plans that honour both cost and environmental constraints.

Suggested Citation

  • Das, Ranajit & Topal, Erkan & Mardaneh, Elham, 2023. "A review of open pit mine and waste dump schedule planning," Resources Policy, Elsevier, vol. 85(PA).
  • Handle: RePEc:eee:jrpoli:v:85:y:2023:i:pa:s0301420723007754
    DOI: 10.1016/j.resourpol.2023.104064
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0301420723007754
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.resourpol.2023.104064?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Adrien Rimélé, M. & Dimitrakopoulos, Roussos & Gamache, Michel, 2018. "A stochastic optimization method with in-pit waste and tailings disposal for open pit life-of-mine production planning," Resources Policy, Elsevier, vol. 57(C), pages 112-121.
    2. Groeneveld, Benjamin & Topal, Erkan & Leenders, Bob, 2019. "Examining system configuration in an open pit mine design," Resources Policy, Elsevier, vol. 63(C), pages 1-1.
    3. Bala G. Chandran & Dorit S. Hochbaum, 2009. "A Computational Study of the Pseudoflow and Push-Relabel Algorithms for the Maximum Flow Problem," Operations Research, INFORMS, vol. 57(2), pages 358-376, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Changyou Xu & Gang Chen & Huabo Lu & Qiuxia Zhang & Zhengke Liu & Jing Bian, 2024. "Integrated Optimization of Production Scheduling and Haulage Route Planning in Open-Pit Mines," Mathematics, MDPI, vol. 12(13), pages 1-24, July.
    2. Yıldız, Taşkın Deniz & Güner, Mehmet Oğuz & Kural, Orhan, 2024. "Effects of EU-Compliant mining waste regulation on Turkish mining sector: A review of characterization, classification, storage, management, recovery of mineral wastes," Resources Policy, Elsevier, vol. 90(C).
    3. Das, Ranajit & Topal, Erkan & Mardaneh, Elham, 2024. "Concurrent optimisation of open pit ore and waste movement with optimal haul road selection," Resources Policy, Elsevier, vol. 91(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Lin, Jingsi & Asad, Mohammad Waqar Ali & Topal, Erkan & Chang, Ping & Huang, Jinxin & Lin, Wei, 2024. "A novel model for sustainable production scheduling of an open-pit mining complex considering waste encapsulation," Resources Policy, Elsevier, vol. 91(C).
    2. Enrique Jelvez & Nelson Morales & Julian M. Ortiz, 2021. "Stochastic Final Pit Limits: An Efficient Frontier Analysis under Geological Uncertainty in the Open-Pit Mining Industry," Mathematics, MDPI, vol. 10(1), pages 1-16, December.
    3. Yıldız, Taşkın Deniz, 2022. "Considering the recent increase in license fees in Turkey, how can the negative effect of the fees on the mining operating costs be reduced?," Resources Policy, Elsevier, vol. 77(C).
    4. Renaud Chicoisne & Daniel Espinoza & Marcos Goycoolea & Eduardo Moreno & Enrique Rubio, 2012. "A New Algorithm for the Open-Pit Mine Production Scheduling Problem," Operations Research, INFORMS, vol. 60(3), pages 517-528, June.
    5. Yıldız, Taşkın Deniz & Güner, Mehmet Oğuz & Kural, Orhan, 2024. "Effects of EU-Compliant mining waste regulation on Turkish mining sector: A review of characterization, classification, storage, management, recovery of mineral wastes," Resources Policy, Elsevier, vol. 90(C).
    6. Noriega, Roberto & Pourrahimian, Yashar & Ben-Awuah, Eugene, 2020. "A two-step mathematical programming framework for undercut horizon optimization in block caving mines," Resources Policy, Elsevier, vol. 65(C).
    7. Bryan Salgado-Almeida & Daniel A. Falquez-Torres & Paola L. Romero-Crespo & Priscila E. Valverde-Armas & Fredy Guzmán-Martínez & Samantha Jiménez-Oyola, 2022. "Risk Assessment of Mining Environmental Liabilities for Their Categorization and Prioritization in Gold-Mining Areas of Ecuador," Sustainability, MDPI, vol. 14(10), pages 1-17, May.
    8. Daniel Espinoza & Marcos Goycoolea & Eduardo Moreno & Alexandra Newman, 2013. "MineLib: a library of open pit mining problems," Annals of Operations Research, Springer, vol. 206(1), pages 93-114, July.
    9. Del Castillo, M. Fernanda & Dimitrakopoulos, Roussos, 2019. "Dynamically optimizing the strategic plan of mining complexes under supply uncertainty," Resources Policy, Elsevier, vol. 60(C), pages 83-93.
    10. Guo, Hongquan & Nguyen, Hoang & Vu, Diep-Anh & Bui, Xuan-Nam, 2021. "Forecasting mining capital cost for open-pit mining projects based on artificial neural network approach," Resources Policy, Elsevier, vol. 74(C).
    11. Manoj Kumar Mohanty & Padma Charan Mishra & Alaka Samantaray, 2023. "The Relationship of Critical Success Factors of the Mineral Industry: A Study on India," Vision, , vol. 27(1), pages 119-134, February.
    12. Aldin Ardian & Mustafa Kumral, 2021. "Enhancing mine risk assessment through more accurate reproduction of correlations and interactions between uncertain variables," Mineral Economics, Springer;Raw Materials Group (RMG);Luleå University of Technology, vol. 34(3), pages 411-425, October.
    13. Li, Xiangyong & Aneja, Y.P., 2017. "Regenerator location problem: Polyhedral study and effective branch-and-cut algorithms," European Journal of Operational Research, Elsevier, vol. 257(1), pages 25-40.
    14. Alipour, Hossein & Muñoz, Mario Andrés & Smith-Miles, Kate, 2023. "Enhanced instance space analysis for the maximum flow problem," European Journal of Operational Research, Elsevier, vol. 304(2), pages 411-428.
    15. Devendra Joshi & Marwan Ali Albahar & Premkumar Chithaluru & Aman Singh & Arvind Yadav & Yini Miro, 2022. "A Novel Approach to Integrating Uncertainty into a Push Re-Label Network Flow Algorithm for Pit Optimization," Mathematics, MDPI, vol. 10(24), pages 1-20, December.
    16. Bakhtavar, Ezzeddin & Saberi, Sahra & Hu, Guangji & Sadiq, Rehan & Hewage, Kasun, 2023. "Fuzzy cognitive-based goal programming for waste rock management with in-pit dumping priority: Towards sustainable mining," Resources Policy, Elsevier, vol. 86(PB).
    17. Rimélé, Adrien & Dimitrakopoulos, Roussos & Gamache, Michel, 2020. "A dynamic stochastic programming approach for open-pit mine planning with geological and commodity price uncertainty," Resources Policy, Elsevier, vol. 65(C).
    18. Armstrong, Margaret & Lagos, Tomas & Emery, Xavier & Homem-de-Mello, Tito & Lagos, Guido & Sauré, Denis, 2021. "Adaptive open-pit mining planning under geological uncertainty," Resources Policy, Elsevier, vol. 72(C).
    19. Jin-Biao Lu & Zhi-Jiang Liu & Dmitry Tulenty & Liudmila Tsvetkova & Sebastian Kot, 2021. "RETRACTED: Implementation of Stochastic Analysis in Corporate Decision-Making Models," Mathematics, MDPI, vol. 9(9), pages 1-16, May.
    20. Das, Ranajit & Topal, Erkan & Mardaneh, Elham, 2024. "Concurrent optimisation of open pit ore and waste movement with optimal haul road selection," Resources Policy, Elsevier, vol. 91(C).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jrpoli:v:85:y:2023:i:pa:s0301420723007754. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/inca/30467 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.