Inverse interval scheduling via reduction on a single machine
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2022.02.046
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Ilya Gertsbakh & Helman I. Stern, 1978. "Minimal Resources for Fixed and Variable Job Schedules," Operations Research, INFORMS, vol. 26(1), pages 68-85, February.
- Clyde L. Monma & Alexander Schrijver & Michael J. Todd & Victor K. Wei, 1990. "Convex Resource Allocation Problems on Directed Acyclic Graphs: Duality, Complexity, Special Cases, and Extensions," Mathematics of Operations Research, INFORMS, vol. 15(4), pages 736-748, November.
- Kailiang Xu & Zuren Feng & Liangjun Ke, 2010. "A branch and bound algorithm for scheduling jobs with controllable processing times on a single machine to meet due dates," Annals of Operations Research, Springer, vol. 181(1), pages 303-324, December.
- Leo G. Kroon & Marc Salomon & Luk N. Van Wassenhove, 1997. "Exact and Approximation Algorithms for the Tactical Fixed Interval Scheduling Problem," Operations Research, INFORMS, vol. 45(4), pages 624-638, August.
- Kovalyov, Mikhail Y. & Ng, C.T. & Cheng, T.C. Edwin, 2007. "Fixed interval scheduling: Models, applications, computational complexity and algorithms," European Journal of Operational Research, Elsevier, vol. 178(2), pages 331-342, April.
- Chung, Yerim & Culus, Jean-François & Demange, Marc, 2015. "Inverse chromatic number problems in interval and permutation graphs," European Journal of Operational Research, Elsevier, vol. 243(3), pages 763-773.
- Dijkstra, Matthijs C. & Kroon, Leo G. & van Nunen, Jo A. E. E. & Salomon, Marc, 1991. "A DSS for capacity planning of aircraft maintenance personnel," International Journal of Production Economics, Elsevier, vol. 23(1-3), pages 69-78, October.
- Michael W. Carter & Craig A. Tovey, 1992. "When Is the Classroom Assignment Problem Hard?," Operations Research, INFORMS, vol. 40(1-supplem), pages 28-39, February.
- T.C.E. Cheng & Zhi‐Long Chen & Chung‐Lun Li & B.M.‐T. Lin, 1998. "Scheduling to minimize the total compression and late costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(1), pages 67-82, February.
- Antoon W.J. Kolen & Jan Karel Lenstra & Christos H. Papadimitriou & Frits C.R. Spieksma, 2007. "Interval scheduling: A survey," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(5), pages 530-543, August.
- Janiak, Adam & Kovalyov, Mikhail Y., 1996. "Single machine scheduling subject to deadlines and resource dependent processing times," European Journal of Operational Research, Elsevier, vol. 94(2), pages 284-291, October.
- Julia Chuzhoy & Rafail Ostrovsky & Yuval Rabani, 2006. "Approximation Algorithms for the Job Interval Selection Problem and Related Scheduling Problems," Mathematics of Operations Research, INFORMS, vol. 31(4), pages 730-738, November.
- Janiak, Adam & Kovalyov, Mikhail Y. & Kubiak, Wieslaw & Werner, Frank, 2005. "Positive half-products and scheduling with controllable processing times," European Journal of Operational Research, Elsevier, vol. 165(2), pages 416-422, September.
- Matteo Fischetti & Silvano Martello & Paolo Toth, 1992. "Approximation Algorithms for Fixed Job Schedule Problems," Operations Research, INFORMS, vol. 40(1-supplem), pages 96-108, February.
- Chung-Yee Lee & Lei Lei, 2001. "Multiple-Project Scheduling with Controllable Project Duration and Hard Resource Constraint: Some Solvable Cases," Annals of Operations Research, Springer, vol. 102(1), pages 287-307, February.
- Kroon, Leo G. & Salomon, Marc & Van Wassenhove, Luk N., 1995. "Exact and approximation algorithms for the operational fixed interval scheduling problem," European Journal of Operational Research, Elsevier, vol. 82(1), pages 190-205, April.
- Du-Juan Wang & Yunqiang Yin & Mengqi Liu, 2016. "Bicriteria scheduling problems involving job rejection, controllable processing times and rate-modifying activity," International Journal of Production Research, Taylor & Francis Journals, vol. 54(12), pages 3691-3705, June.
- G. B. Dantzig & D. R. Fulkerson, 1954. "Minimizing the number of tankers to meet a fixed schedule," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 1(3), pages 217-222, September.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Antoon W.J. Kolen & Jan Karel Lenstra & Christos H. Papadimitriou & Frits C.R. Spieksma, 2007. "Interval scheduling: A survey," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(5), pages 530-543, August.
- Kovalyov, Mikhail Y. & Ng, C.T. & Cheng, T.C. Edwin, 2007. "Fixed interval scheduling: Models, applications, computational complexity and algorithms," European Journal of Operational Research, Elsevier, vol. 178(2), pages 331-342, April.
- Yaron Leyvand & Dvir Shabtay & George Steiner & Liron Yedidsion, 2010. "Just-in-time scheduling with controllable processing times on parallel machines," Journal of Combinatorial Optimization, Springer, vol. 19(3), pages 347-368, April.
- Bekki, Özgün BarIs & Azizoglu, Meral, 2008. "Operational fixed interval scheduling problem on uniform parallel machines," International Journal of Production Economics, Elsevier, vol. 112(2), pages 756-768, April.
- Shabtay, Dvir, 2022. "Single-machine scheduling with machine unavailability periods and resource dependent processing times," European Journal of Operational Research, Elsevier, vol. 296(2), pages 423-439.
- Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
- Kroon, Leo G. & Salomon, Marc & Van Wassenhove, Luk N., 1995. "Exact and approximation algorithms for the operational fixed interval scheduling problem," European Journal of Operational Research, Elsevier, vol. 82(1), pages 190-205, April.
- Türsel Eliiyi, Deniz & Azizoglu, Meral, 2011. "Heuristics for operational fixed job scheduling problems with working and spread time constraints," International Journal of Production Economics, Elsevier, vol. 132(1), pages 107-121, July.
- Bahel, Eric & Trudeau, Christian, 2019.
"Stability and fairness in the job scheduling problem,"
Games and Economic Behavior, Elsevier, vol. 117(C), pages 1-14.
- Eric Bahel & Christian Trudeau, 2018. "Stability and fairness in the job scheduling problem," Working Papers 1803, University of Windsor, Department of Economics.
- Shabtay, Dvir & Zofi, Moshe, 2018. "Single machine scheduling with controllable processing times and an unavailability period to minimize the makespan," International Journal of Production Economics, Elsevier, vol. 198(C), pages 191-200.
- Oron, Daniel, 2016. "Scheduling controllable processing time jobs with position-dependent workloads," International Journal of Production Economics, Elsevier, vol. 173(C), pages 153-160.
- Martin Branda & Štěpán Hájek, 2017. "Flow-based formulations for operational fixed interval scheduling problems with random delays," Computational Management Science, Springer, vol. 14(1), pages 161-177, January.
- Zhang, Xiandong & (Yale) Gong, Yeming & Zhou, Shuyu & de Koster, René & van de Velde, Steef, 2016. "Increasing the revenue of self-storage warehouses by optimizing order scheduling," European Journal of Operational Research, Elsevier, vol. 252(1), pages 69-78.
- Krishnamoorthy, M. & Ernst, A.T. & Baatar, D., 2012. "Algorithms for large scale Shift Minimisation Personnel Task Scheduling Problems," European Journal of Operational Research, Elsevier, vol. 219(1), pages 34-48.
- Lee, Soonhui & Turner, Jonathan & Daskin, Mark S. & Homem-de-Mello, Tito & Smilowitz, Karen, 2012. "Improving fleet utilization for carriers by interval scheduling," European Journal of Operational Research, Elsevier, vol. 218(1), pages 261-269.
- Evgeny Gurevsky & Sergey Kovalev & Mikhail Y. Kovalyov, 2021. "Min-max controllable risk problems," 4OR, Springer, vol. 19(1), pages 93-101, March.
- Leyvand, Yaron & Shabtay, Dvir & Steiner, George, 2010. "A unified approach for scheduling with convex resource consumption functions using positional penalties," European Journal of Operational Research, Elsevier, vol. 206(2), pages 301-312, October.
- Akiyoshi Shioura & Natalia V. Shakhlevich & Vitaly A. Strusevich & Bernhard Primas, 2018. "Models and algorithms for energy-efficient scheduling with immediate start of jobs," Journal of Scheduling, Springer, vol. 21(5), pages 505-516, October.
- Di Martinelly, Christine & Meskens, Nadine, 2017.
"A bi-objective integrated approach to building surgical teams and nurse schedule rosters to maximise surgical team affinities and minimise nurses' idle time,"
International Journal of Production Economics, Elsevier, vol. 191(C), pages 323-334.
- Christine Di Martinelly & Nadine Meskens, 2017. "A bi-objective integrated approach to building surgical teams and nurse schedule rosters to maximise surgical team affinities and minimise nurses' idle time," Post-Print hal-01745280, HAL.
- Wan, Guohua & Vakati, Sudheer R. & Leung, Joseph Y.-T. & Pinedo, Michael, 2010. "Scheduling two agents with controllable processing times," European Journal of Operational Research, Elsevier, vol. 205(3), pages 528-539, September.
More about this item
Keywords
Scheduling; Interval scheduling; Inverse optimization via reduction; Strong NP-hardness; Polynomial time approximation scheme;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:303:y:2022:i:2:p:541-549. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.