IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v275y2019i2p552-569.html
   My bibliography  Save this article

Carbon-efficient deployment of electric rubber-tyred gantry cranes in container terminals with workload uncertainty

Author

Listed:
  • Yu, Dayong
  • Li, Dong
  • Sha, Mei
  • Zhang, Dali

Abstract

Rubber-tyred gantry cranes are one of the major sources of carbon dioxide emissions in container terminals. In a move to green transportation, the traditional diesel powered cranes are being converted to electric ones. In this paper, we study the deployment of electric powered gantry cranes (ERTGs) in container terminal yards. Cranes always move in-between blocks to serve different workload. ERTGs use electricity for most movements but switch to diesel engines to allow inter-block transfers between unaligned blocks. We exploit this feature and propose to consider simultaneously the CO2 emissions and workload delays to develop carbon-efficient deployment strategies. Moreover, unlike previous works we consider the workload uncertainty, and model the problem as a two-stage stochastic program. A sample average approximation framework with Benders decomposition is employed to solve the problem. Multiple acceleration techniques are proposed, including a tailored regularised decomposition approach and valid inequalities. A case study with sample data from a major port in East China show that our proposal could reduce significantly CO2 emissions with only a marginal compromise in workload delays. Our numerical experiments also highlight the significance of the stochastic model and the efficiency of the Benders algorithms.

Suggested Citation

  • Yu, Dayong & Li, Dong & Sha, Mei & Zhang, Dali, 2019. "Carbon-efficient deployment of electric rubber-tyred gantry cranes in container terminals with workload uncertainty," European Journal of Operational Research, Elsevier, vol. 275(2), pages 552-569.
  • Handle: RePEc:eee:ejores:v:275:y:2019:i:2:p:552-569
    DOI: 10.1016/j.ejor.2018.12.003
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221718310257
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2018.12.003?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Raymond K. Cheung & Chung-Lun Li & Wuqin Lin, 2002. "Interblock Crane Deployment in Container Terminals," Transportation Science, INFORMS, vol. 36(1), pages 79-93, February.
    2. He, Junliang & Chang, Daofang & Mi, Weijian & Yan, Wei, 2010. "A hybrid parallel genetic algorithm for yard crane scheduling," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 46(1), pages 136-155, January.
    3. Zhang, Chuqian & Wan, Yat-wah & Liu, Jiyin & Linn, Richard J., 2002. "Dynamic crane deployment in container storage yards," Transportation Research Part B: Methodological, Elsevier, vol. 36(6), pages 537-555, July.
    4. Ng, W. C., 2005. "Crane scheduling in container yards with inter-crane interference," European Journal of Operational Research, Elsevier, vol. 164(1), pages 64-78, July.
    5. Carlo, Héctor J. & Vis, Iris F.A. & Roodbergen, Kees Jan, 2014. "Storage yard operations in container terminals: Literature overview, trends, and research directions," European Journal of Operational Research, Elsevier, vol. 235(2), pages 412-430.
    6. Ki Young Kim & Kap Hwan Kim, 2003. "Heuristic algorithms for routing yard‐side equipment for minimizing loading times in container terminals," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(5), pages 498-514, August.
    7. Li, Wenkai & Wu, Yong & Petering, M.E.H. & Goh, Mark & Souza, Robert de, 2009. "Discrete time model and algorithms for container yard crane scheduling," European Journal of Operational Research, Elsevier, vol. 198(1), pages 165-172, October.
    8. Carlo, Héctor J. & Vis, Iris F.A. & Roodbergen, Kees Jan, 2014. "Transport operations in container terminals: Literature overview, trends, research directions and classification scheme," European Journal of Operational Research, Elsevier, vol. 236(1), pages 1-13.
    9. Xi Guo & Shell Ying Huang, 2012. "Dynamic Space and Time Partitioning for Yard Crane Workload Management in Container Terminals," Transportation Science, INFORMS, vol. 46(1), pages 134-148, February.
    10. Roy, Debjit & de Koster, René, 2018. "Stochastic modeling of unloading and loading operations at a container terminal using automated lifting vehicles," European Journal of Operational Research, Elsevier, vol. 266(3), pages 895-910.
    11. Lee, Der-Horng & Cao, Zhi & Meng, Qiang, 2007. "Scheduling of two-transtainer systems for loading outbound containers in port container terminals with simulated annealing algorithm," International Journal of Production Economics, Elsevier, vol. 107(1), pages 115-124, May.
    12. Rahmaniani, Ragheb & Crainic, Teodor Gabriel & Gendreau, Michel & Rei, Walter, 2017. "The Benders decomposition algorithm: A literature review," European Journal of Operational Research, Elsevier, vol. 259(3), pages 801-817.
    13. Santoso, Tjendera & Ahmed, Shabbir & Goetschalckx, Marc & Shapiro, Alexander, 2005. "A stochastic programming approach for supply chain network design under uncertainty," European Journal of Operational Research, Elsevier, vol. 167(1), pages 96-115, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Claudia Durán & Ivan Derpich & Raúl Carrasco, 2022. "Optimization of Port Layout to Determine Greenhouse Gas Emission Gaps," Sustainability, MDPI, vol. 14(20), pages 1-18, October.
    2. Damla Kizilay & Deniz Türsel Eliiyi, 2021. "A comprehensive review of quay crane scheduling, yard operations and integrations thereof in container terminals," Flexible Services and Manufacturing Journal, Springer, vol. 33(1), pages 1-42, March.
    3. Iris, Çağatay & Lam, Jasmine Siu Lee, 2021. "Optimal energy management and operations planning in seaports with smart grid while harnessing renewable energy under uncertainty," Omega, Elsevier, vol. 103(C).
    4. Raeesi, Ramin & Sahebjamnia, Navid & Mansouri, S. Afshin, 2023. "The synergistic effect of operational research and big data analytics in greening container terminal operations: A review and future directions," European Journal of Operational Research, Elsevier, vol. 310(3), pages 943-973.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Gharehgozli, A.H. & Roy, D. & de Koster, M.B.M., 2014. "Sea Container Terminals," ERIM Report Series Research in Management ERS-2014-009-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    2. Xiao-Ming Yang & Xin-Jia Jiang, 2020. "Yard Crane Scheduling in the Ground Trolley-Based Automated Container Terminal," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 37(02), pages 1-28, March.
    3. Yong Wu & Wenkai Li & Matthew E. H. Petering & Mark Goh & Robert de Souza, 2015. "Scheduling Multiple Yard Cranes with Crane Interference and Safety Distance Requirement," Transportation Science, INFORMS, vol. 49(4), pages 990-1005, November.
    4. Jiang, Xin Jia & Jin, Jian Gang, 2017. "A branch-and-price method for integrated yard crane deployment and container allocation in transshipment yards," Transportation Research Part B: Methodological, Elsevier, vol. 98(C), pages 62-75.
    5. Shell Ying Huang & Ya Li, 2017. "Yard crane scheduling to minimize total weighted vessel loading time in container terminals," Flexible Services and Manufacturing Journal, Springer, vol. 29(3), pages 689-720, December.
    6. Gharehgozli, Amir & Yu, Yugang & de Koster, René & Du, Shaofu, 2019. "Sequencing storage and retrieval requests in a container block with multiple open locations," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 125(C), pages 261-284.
    7. Sumin Chen & Qingcheng Zeng & Yushan Hu, 2022. "Scheduling optimization for two crossover automated stacking cranes considering relocation," Operational Research, Springer, vol. 22(3), pages 2099-2120, July.
    8. Jenny Nossack & Dirk Briskorn & Erwin Pesch, 2018. "Container Dispatching and Conflict-Free Yard Crane Routing in an Automated Container Terminal," Transportation Science, INFORMS, vol. 52(5), pages 1059-1076, October.
    9. Gharehgozli, Amir Hossein & Vernooij, Floris Gerardus & Zaerpour, Nima, 2017. "A simulation study of the performance of twin automated stacking cranes at a seaport container terminal," European Journal of Operational Research, Elsevier, vol. 261(1), pages 108-128.
    10. Galle, Virgile & Barnhart, Cynthia & Jaillet, Patrick, 2018. "Yard Crane Scheduling for container storage, retrieval, and relocation," European Journal of Operational Research, Elsevier, vol. 271(1), pages 288-316.
    11. Dirk Briskorn & Lennart Zey, 2018. "Resolving interferences of triple‐crossover‐cranes by determining paths in networks," Naval Research Logistics (NRL), John Wiley & Sons, vol. 65(6-7), pages 477-498, September.
    12. Fotuhi, Fateme & Huynh, Nathan & Vidal, Jose M. & Xie, Yuanchang, 2013. "Modeling yard crane operators as reinforcement learning agents," Research in Transportation Economics, Elsevier, vol. 42(1), pages 3-12.
    13. Boysen, Nils & Briskorn, Dirk & Meisel, Frank, 2017. "A generalized classification scheme for crane scheduling with interference," European Journal of Operational Research, Elsevier, vol. 258(1), pages 343-357.
    14. Amelie Eilken, 2019. "A decomposition-based approach to the scheduling of identical automated yard cranes at container terminals," Journal of Scheduling, Springer, vol. 22(5), pages 517-541, October.
    15. Carlo, Héctor J. & Vis, Iris F.A. & Roodbergen, Kees Jan, 2014. "Storage yard operations in container terminals: Literature overview, trends, and research directions," European Journal of Operational Research, Elsevier, vol. 235(2), pages 412-430.
    16. Amir Hossein Gharehgozli & Gilbert Laporte & Yugang Yu & René de Koster, 2015. "Scheduling Twin Yard Cranes in a Container Block," Transportation Science, INFORMS, vol. 49(3), pages 686-705, August.
    17. Gharehgozli, Amir Hossein & Yu, Yugang & de Koster, René & Udding, Jan Tijmen, 2014. "An exact method for scheduling a yard crane," European Journal of Operational Research, Elsevier, vol. 235(2), pages 431-447.
    18. Cao, Zhi & Lee, Der-Horng & Meng, Qiang, 2008. "Deployment strategies of double-rail-mounted gantry crane systems for loading outbound containers in container terminals," International Journal of Production Economics, Elsevier, vol. 115(1), pages 221-228, September.
    19. Ehleiter, Anne & Jaehn, Florian, 2016. "Housekeeping: Foresightful container repositioning," International Journal of Production Economics, Elsevier, vol. 179(C), pages 203-211.
    20. Robenek, Tomáš & Umang, Nitish & Bierlaire, Michel & Ropke, Stefan, 2014. "A branch-and-price algorithm to solve the integrated berth allocation and yard assignment problem in bulk ports," European Journal of Operational Research, Elsevier, vol. 235(2), pages 399-411.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:275:y:2019:i:2:p:552-569. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.