IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v247y2015i1p113-123.html
   My bibliography  Save this article

Integrated production and logistics planning: Contract manufacturing and choice of air/surface transportation

Author

Listed:
  • Azadian, Farshid
  • Murat, Alper
  • Chinnam, Ratna Babu

Abstract

We study the operational problem of a make-to-order contract manufacturer seeking to integrate production scheduling and transportation planning for improved performance under commit-to-delivery model. The manufacturer produces customer orders on a set of unrelated parallel lines/processors, accounting for release dates and sequence dependent setup times. A set of shipping options with different costs and transit times is available for order delivery through the third party logistics service providers. The objective is to manufacture and deliver multiple customer orders by selecting from the available shipping options, before preset due dates to minimize total cost of fulfilling orders, including tardiness penalties. We model the problem as a mixed integer programming model and provide a novel decomposition scheme to solve the problem. An exact dynamic programming model and a heuristics approach are presented to solve the subproblems. The performance of the solution algorithm is tested through a set of experimental studies and results are presented. The algorithm is shown to efficiently solve the test cases, even the complex instances, to near optimality.

Suggested Citation

  • Azadian, Farshid & Murat, Alper & Chinnam, Ratna Babu, 2015. "Integrated production and logistics planning: Contract manufacturing and choice of air/surface transportation," European Journal of Operational Research, Elsevier, vol. 247(1), pages 113-123.
  • Handle: RePEc:eee:ejores:v:247:y:2015:i:1:p:113-123
    DOI: 10.1016/j.ejor.2015.06.004
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221715005184
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2015.06.004?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Meisel, Frank & Kirschstein, Thomas & Bierwirth, Christian, 2013. "Integrated production and intermodal transportation planning in large scale production–distribution-networks," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 60(C), pages 62-78.
    2. Marshall L. Fisher, 2004. "The Lagrangian Relaxation Method for Solving Integer Programming Problems," Management Science, INFORMS, vol. 50(12_supple), pages 1861-1871, December.
    3. Mikhail A. Bragin & Peter B. Luh & Joseph H. Yan & Nanpeng Yu & Gary A. Stern, 2015. "Convergence of the Surrogate Lagrangian Relaxation Method," Journal of Optimization Theory and Applications, Springer, vol. 164(1), pages 173-201, January.
    4. Han, Chaodong & Porterfield, Tobin & Li, Xiaolin, 2012. "Impact of industry competition on contract manufacturing: An empirical study of U.S. manufacturers," International Journal of Production Economics, Elsevier, vol. 138(1), pages 159-169.
    5. T. Sun & Q. C. Zhao & P. B. Luh, 2007. "On the Surrogate Gradient Algorithm for Lagrangian Relaxation," Journal of Optimization Theory and Applications, Springer, vol. 133(3), pages 413-416, June.
    6. Azadian, Farshid & Murat, Alper E. & Chinnam, Ratna Babu, 2012. "Dynamic routing of time-sensitive air cargo using real-time information," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(1), pages 355-372.
    7. Li, Kunpeng & Sivakumar, Appa Iyer & Ganesan, Viswanath Kumar, 2008. "Analysis and algorithms for coordinated scheduling of parallel machine manufacturing and 3PL transportation," International Journal of Production Economics, Elsevier, vol. 115(2), pages 482-491, October.
    8. M'Hallah, Rym & Bulfin, R.L., 2007. "Minimizing the weighted number of tardy jobs on a single machine with release dates," European Journal of Operational Research, Elsevier, vol. 176(2), pages 727-744, January.
    9. Kathryn E. Stecke & Xuying Zhao, 2007. "Production and Transportation Integration for a Make-to-Order Manufacturing Company with a Commit-to-Delivery Business Mode," Manufacturing & Service Operations Management, INFORMS, vol. 9(2), pages 206-224, September.
    10. Zhi-Long Chen, 2010. "Integrated Production and Outbound Distribution Scheduling: Review and Extensions," Operations Research, INFORMS, vol. 58(1), pages 130-148, February.
    11. Ann Melissa Campbell & Dieter Vandenbussche & William Hermann, 2008. "Routing for Relief Efforts," Transportation Science, INFORMS, vol. 42(2), pages 127-145, May.
    12. X. Zhao & P. B. Luh & J. Wang, 1999. "Surrogate Gradient Algorithm for Lagrangian Relaxation," Journal of Optimization Theory and Applications, Springer, vol. 100(3), pages 699-712, March.
    13. Lin, Yang-Kuei & Fowler, John W. & Pfund, Michele E., 2013. "Multiple-objective heuristics for scheduling unrelated parallel machines," European Journal of Operational Research, Elsevier, vol. 227(2), pages 239-253.
    14. Ullrich, Christian A., 2013. "Integrated machine scheduling and vehicle routing with time windows," European Journal of Operational Research, Elsevier, vol. 227(1), pages 152-165.
    15. Armentano, Vinicius Amaral & de Franca Filho, Moacir Felizardo, 2007. "Minimizing total tardiness in parallel machine scheduling with setup times: An adaptive memory-based GRASP approach," European Journal of Operational Research, Elsevier, vol. 183(1), pages 100-114, November.
    16. Marshall L. Fisher, 2004. "Comments on ÜThe Lagrangian Relaxation Method for Solving Integer Programming ProblemsÝ," Management Science, INFORMS, vol. 50(12_supple), pages 1872-1874, December.
    17. Li, Kunpeng & Sivakumar, Appa Iyer & Ganesan, Viswanath Kumar, 2008. "Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain," European Journal of Operational Research, Elsevier, vol. 187(2), pages 442-455, June.
    18. Detienne, Boris, 2014. "A mixed integer linear programming approach to minimize the number of late jobs with and without machine availability constraints," European Journal of Operational Research, Elsevier, vol. 235(3), pages 540-552.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Feng Guo & Qi Liu & Dunhu Liu & Zhaoxia Guo, 2017. "On Production and Green Transportation Coordination in a Sustainable Global Supply Chain," Sustainability, MDPI, vol. 9(11), pages 1-20, November.
    2. Sun, X.T. & Chung, S.H. & Chan, Felix T.S. & Wang, Zheng, 2018. "The impact of liner shipping unreliability on the production–distribution scheduling of a decentralized manufacturing system," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 114(C), pages 242-269.
    3. Li, Feng & Xu, Shifu & Xu, Zhou, 2023. "New exact and approximation algorithms for integrated production and transportation scheduling with committed delivery due dates and order acceptance," European Journal of Operational Research, Elsevier, vol. 306(1), pages 127-140.
    4. Wu, Zhengtian & Gao, Qing & Jiang, Baoping & Karimi, Hamid Reza, 2021. "Solving the production transportation problem via a deterministic annealing neural network method," Applied Mathematics and Computation, Elsevier, vol. 411(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Wang, Julong & Liu, Zhixue & Li, Feng, 2024. "Integrated production and transportation scheduling problem under nonlinear cost structures," European Journal of Operational Research, Elsevier, vol. 313(3), pages 883-904.
    2. Wang, Tingsong & Meng, Qiang & Wang, Shuaian & Qu, Xiaobo, 2021. "A two-stage stochastic nonlinear integer-programming model for slot allocation of a liner container shipping service," Transportation Research Part B: Methodological, Elsevier, vol. 150(C), pages 143-160.
    3. Yang, Xianyan & Li, Feng & Liu, Zhixue & Xu, Zhou, 2024. "New exact and heuristic algorithms for general production and delivery integration," European Journal of Operational Research, Elsevier, vol. 316(2), pages 419-442.
    4. Han, Bin & Zhang, Wenjun & Lu, Xiwen & Lin, Yingzi, 2015. "On-line supply chain scheduling for single-machine and parallel-machine configurations with a single customer: Minimizing the makespan and delivery cost," European Journal of Operational Research, Elsevier, vol. 244(3), pages 704-714.
    5. Li, Feng & Xu, Shifu & Xu, Zhou, 2023. "New exact and approximation algorithms for integrated production and transportation scheduling with committed delivery due dates and order acceptance," European Journal of Operational Research, Elsevier, vol. 306(1), pages 127-140.
    6. Feng Li & Zhi-Long Chen & Zhi-Long Chen, 2017. "Integrated Production, Inventory and Delivery Problems: Complexity and Algorithms," INFORMS Journal on Computing, INFORMS, vol. 29(2), pages 232-250, May.
    7. Steeger, Gregory & Rebennack, Steffen, 2017. "Dynamic convexification within nested Benders decomposition using Lagrangian relaxation: An application to the strategic bidding problem," European Journal of Operational Research, Elsevier, vol. 257(2), pages 669-686.
    8. Liu, Yang & Yu, Nanpeng & Wang, Wei & Guan, Xiaohong & Xu, Zhanbo & Dong, Bing & Liu, Ting, 2018. "Coordinating the operations of smart buildings in smart grids," Applied Energy, Elsevier, vol. 228(C), pages 2510-2525.
    9. Ling Liu & Wenli Li & Kunpeng Li & Xuxia Zou, 2020. "A coordinated production and transportation scheduling problem with minimum sum of order delivery times," Journal of Heuristics, Springer, vol. 26(1), pages 33-58, February.
    10. Liang-Liang Fu & Mohamed Ali Aloulou & Christian Artigues, 2018. "Integrated production and outbound distribution scheduling problems with job release dates and deadlines," Journal of Scheduling, Springer, vol. 21(4), pages 443-460, August.
    11. S. Mohammadi & S. Al-E-Hashem & Yacine Rekik, 2020. "An integrated production scheduling and delivery route planning with multi-purpose machines: A case study from a furniture manufacturing company," Post-Print hal-02194222, HAL.
    12. Agnetis, Alessandro & Aloulou, Mohamed Ali & Fu, Liang-Liang, 2014. "Coordination of production and interstage batch delivery with outsourced distribution," European Journal of Operational Research, Elsevier, vol. 238(1), pages 130-142.
    13. Feng Guo & Qi Liu & Dunhu Liu & Zhaoxia Guo, 2017. "On Production and Green Transportation Coordination in a Sustainable Global Supply Chain," Sustainability, MDPI, vol. 9(11), pages 1-20, November.
    14. Feng Li & Zhou Xu & Zhi-Long Chen, 2020. "Production and Transportation Integration for Commit-to-Delivery Mode with General Shipping Costs," INFORMS Journal on Computing, INFORMS, vol. 32(4), pages 1012-1029, October.
    15. Lixin Tang & Feng Li & Zhi-Long Chen, 2019. "Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms," INFORMS Journal on Computing, INFORMS, vol. 31(3), pages 493-514, July.
    16. Han, Dongya & Yang, Yongjian & Wang, Dujuan & Cheng, T.C.E. & Yin, Yunqiang, 2019. "Integrated production, inventory, and outbound distribution operations with fixed departure times in a three-stage supply chain," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 125(C), pages 334-347.
    17. Guo, Zhaoxia & Shi, Leyuan & Chen, Longchao & Liang, Yong, 2017. "A harmony search-based memetic optimization model for integrated production and transportation scheduling in MTO manufacturing," Omega, Elsevier, vol. 66(PB), pages 327-343.
    18. Ghaddar, Bissan & Naoum-Sawaya, Joe & Kishimoto, Akihiro & Taheri, Nicole & Eck, Bradley, 2015. "A Lagrangian decomposition approach for the pump scheduling problem in water networks," European Journal of Operational Research, Elsevier, vol. 241(2), pages 490-501.
    19. Mohammadi, S. & Al-e-Hashem, S.M.J. Mirzapour & Rekik, Y., 2020. "An integrated production scheduling and delivery route planning with multi-purpose machines: A case study from a furniture manufacturing company," International Journal of Production Economics, Elsevier, vol. 219(C), pages 347-359.
    20. An, Yu & Zhang, Yu & Zeng, Bo, 2015. "The reliable hub-and-spoke design problem: Models and algorithms," Transportation Research Part B: Methodological, Elsevier, vol. 77(C), pages 103-122.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:247:y:2015:i:1:p:113-123. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.