IDEAS home Printed from https://ideas.repec.org/a/eee/transe/v125y2019icp334-347.html
   My bibliography  Save this article

Integrated production, inventory, and outbound distribution operations with fixed departure times in a three-stage supply chain

Author

Listed:
  • Han, Dongya
  • Yang, Yongjian
  • Wang, Dujuan
  • Cheng, T.C.E.
  • Yin, Yunqiang

Abstract

This study considers an integrated production, inventory, and outbound distribution scheduling model that arises in a three-stage supply chain consisting of three parts: a supplier, a manufacturer, and several customers. The manufacturer receives a set of two-stage orders to process a specific set of jobs (products) for the customers. These jobs are first partly processed by the supplier, and delivered to the manufacturer by vehicles immediately at additional delivery costs depending on the delivered jobs. The partly processed jobs are then processed by the manufacturer, and delivered to their respective customers by transporters with fixed delivery departure times. A finished job is either kept in a temporary warehouse before it is delivered at an inventory cost, or delivered to its customer immediately. Each job is associated with a desired due date, and late deliveries are not accepted. The objective is to determine schedules for processing the jobs, and identify delivery schedules from the manufacturer to all customers such that the weighted sum of the weighted number of late jobs, inventory cost, and delivery cost is minimized. For each considered problem, we investigate its computational complexity, and develop pseudo-polynomial or polynomial-time solution algorithm, if viable. Using randomly generated data, we conduct extensive numerical studies to evaluate the performance of the proposed algorithms.

Suggested Citation

  • Han, Dongya & Yang, Yongjian & Wang, Dujuan & Cheng, T.C.E. & Yin, Yunqiang, 2019. "Integrated production, inventory, and outbound distribution operations with fixed departure times in a three-stage supply chain," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 125(C), pages 334-347.
  • Handle: RePEc:eee:transe:v:125:y:2019:i:c:p:334-347
    DOI: 10.1016/j.tre.2019.03.014
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S1366554518308433
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.tre.2019.03.014?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Hsiao, H.I. & Kemp, R.G.M. & van der Vorst, J.G.A.J. & (Onno) Omta, S.W.F., 2010. "A classification of logistic outsourcing levels and their impact on service performance: Evidence from the food processing industry," International Journal of Production Economics, Elsevier, vol. 124(1), pages 75-86, March.
    2. Agnetis, Alessandro & Aloulou, Mohamed Ali & Fu, Liang-Liang, 2014. "Coordination of production and interstage batch delivery with outsourced distribution," European Journal of Operational Research, Elsevier, vol. 238(1), pages 130-142.
    3. Ali Diabat & Tarek Abdallah & Tung Le, 2016. "A hybrid tabu search based heuristic for the periodic distribution inventory problem with perishable goods," Annals of Operations Research, Springer, vol. 242(2), pages 373-398, July.
    4. Ali Diabat & Jean-Philippe Richard, 2015. "An integrated supply chain problem: a nested lagrangian relaxation approach," Annals of Operations Research, Springer, vol. 229(1), pages 303-323, June.
    5. Liang-Liang Fu & Mohamed Ali Aloulou & Christian Artigues, 2018. "Integrated production and outbound distribution scheduling problems with job release dates and deadlines," Journal of Scheduling, Springer, vol. 21(4), pages 443-460, August.
    6. Yin, Yunqiang & Cheng, T.C.E. & Hsu, Chou-Jung & Wu, Chin-Chia, 2013. "Single-machine batch delivery scheduling with an assignable common due window," Omega, Elsevier, vol. 41(2), pages 216-225.
    7. Melo, Rafael A. & Wolsey, Laurence A., 2010. "Optimizing production and transportation in a commit-to-delivery business mode," European Journal of Operational Research, Elsevier, vol. 203(3), pages 614-618, June.
    8. Kathryn E. Stecke & Xuying Zhao, 2007. "Production and Transportation Integration for a Make-to-Order Manufacturing Company with a Commit-to-Delivery Business Mode," Manufacturing & Service Operations Management, INFORMS, vol. 9(2), pages 206-224, September.
    9. Sun, X.T. & Chung, S.H. & Chan, Felix T.S. & Wang, Zheng, 2018. "The impact of liner shipping unreliability on the production–distribution scheduling of a decentralized manufacturing system," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 114(C), pages 242-269.
    10. Nicholas G. Hall & Chris N. Potts, 2003. "Supply chain scheduling: Batching and delivery," Operations Research, INFORMS, vol. 51(4), pages 566-584, August.
    11. Li, Kunpeng & Sivakumar, Appa Iyer & Ganesan, Viswanath Kumar, 2008. "Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain," European Journal of Operational Research, Elsevier, vol. 187(2), pages 442-455, June.
    12. Alessandro Agnetis & Mohamed Ali Aloulou & Mikhail Y. Kovalyov, 2017. "Integrated production scheduling and batch delivery with fixed departure times and inventory holding costs," International Journal of Production Research, Taylor & Francis Journals, vol. 55(20), pages 6193-6206, October.
    13. Lee, Y.C.E. & Chan, Chi Kin & Langevin, A. & Lee, H.W.J., 2016. "Integrated inventory-transportation model by synchronizing delivery and production cycles," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 91(C), pages 68-89.
    14. Hirofumi Matsuo, 1988. "The Weighted Total Tardiness Problem with Fixed Shipping Times and Overtime Utilization," Operations Research, INFORMS, vol. 36(2), pages 293-307, April.
    15. MELO, Rafael A. & WOLSEY, Laurence A., 2010. "Optimizing production and transportation in a commit-to-delivery business mode," LIDAM Reprints CORE 2193, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    16. Zhi-Long Chen, 2010. "Integrated Production and Outbound Distribution Scheduling: Review and Extensions," Operations Research, INFORMS, vol. 58(1), pages 130-148, February.
    17. Feng Li & Zhi-Long Chen & Zhi-Long Chen, 2017. "Integrated Production, Inventory and Delivery Problems: Complexity and Algorithms," INFORMS Journal on Computing, INFORMS, vol. 29(2), pages 232-250, May.
    18. Agnetis, Alessandro & Aloulou, Mohamed Ali & Fu, Liang-Liang & Kovalyov, Mikhail Y., 2015. "Two faster algorithms for coordination of production and batch delivery: A note," European Journal of Operational Research, Elsevier, vol. 241(3), pages 927-930.
    19. Qiu, Yuzhuo & Ni, Ming & Wang, Liang & Li, Qinqin & Fang, Xuanjing & Pardalos, Panos M., 2018. "Production routing problems with reverse logistics and remanufacturing," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 111(C), pages 87-100.
    20. Yunqiang Yin & Yongjian Yang & Dujuan Wang & T.C.E. Cheng & Chin‐Chia Wu, 2018. "Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents," Naval Research Logistics (NRL), John Wiley & Sons, vol. 65(5), pages 393-409, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Wang, Julong & Liu, Zhixue & Li, Feng, 2024. "Integrated production and transportation scheduling problem under nonlinear cost structures," European Journal of Operational Research, Elsevier, vol. 313(3), pages 883-904.
    2. Byung-Cheon Choi & Myoung-Ju Park, 2021. "Single-machine scheduling with periodic due dates to minimize the total earliness and tardy penalty," Journal of Combinatorial Optimization, Springer, vol. 41(4), pages 781-793, May.
    3. Bachtenkirch, David & Bock, Stefan, 2022. "Finding efficient make-to-order production and batch delivery schedules," European Journal of Operational Research, Elsevier, vol. 297(1), pages 133-152.
    4. Tingting Ji & Shoufeng Ji & Yuanyuan Ji & Hongyu Liu, 2022. "Study on Sustainable Combined Location-Inventory-Routing Problem Based on Demand Forecasting," Sustainability, MDPI, vol. 14(23), pages 1-21, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Feng Li & Zhi-Long Chen & Zhi-Long Chen, 2017. "Integrated Production, Inventory and Delivery Problems: Complexity and Algorithms," INFORMS Journal on Computing, INFORMS, vol. 29(2), pages 232-250, May.
    2. Wang, Julong & Liu, Zhixue & Li, Feng, 2024. "Integrated production and transportation scheduling problem under nonlinear cost structures," European Journal of Operational Research, Elsevier, vol. 313(3), pages 883-904.
    3. Feng Li & Zhou Xu & Zhi-Long Chen, 2020. "Production and Transportation Integration for Commit-to-Delivery Mode with General Shipping Costs," INFORMS Journal on Computing, INFORMS, vol. 32(4), pages 1012-1029, October.
    4. Li, Feng & Xu, Shifu & Xu, Zhou, 2023. "New exact and approximation algorithms for integrated production and transportation scheduling with committed delivery due dates and order acceptance," European Journal of Operational Research, Elsevier, vol. 306(1), pages 127-140.
    5. Yang, Xianyan & Li, Feng & Liu, Zhixue & Xu, Zhou, 2024. "New exact and heuristic algorithms for general production and delivery integration," European Journal of Operational Research, Elsevier, vol. 316(2), pages 419-442.
    6. Bachtenkirch, David & Bock, Stefan, 2022. "Finding efficient make-to-order production and batch delivery schedules," European Journal of Operational Research, Elsevier, vol. 297(1), pages 133-152.
    7. Yunqiang Yin & Doudou Li & Dujuan Wang & T. C. E. Cheng, 2021. "Single-machine serial-batch delivery scheduling with two competing agents and due date assignment," Annals of Operations Research, Springer, vol. 298(1), pages 497-523, March.
    8. Ullrich, Christian A., 2013. "Integrated machine scheduling and vehicle routing with time windows," European Journal of Operational Research, Elsevier, vol. 227(1), pages 152-165.
    9. Azeddine Cheref & Alessandro Agnetis & Christian Artigues & Jean-Charles Billaut, 2017. "Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence," Journal of Scheduling, Springer, vol. 20(6), pages 681-693, December.
    10. Li, Chung-Lun & Li, Feng, 2020. "Rescheduling production and outbound deliveries when transportation service is disrupted," European Journal of Operational Research, Elsevier, vol. 286(1), pages 138-148.
    11. Mohammad Rostami & Milad Mohammadi, 2024. "Two-machine decentralized flow shop scheduling problem with inter-factory batch delivery system," Operational Research, Springer, vol. 24(3), pages 1-37, September.
    12. Yunqiang Yin & Yongjian Yang & Dujuan Wang & T.C.E. Cheng & Chin‐Chia Wu, 2018. "Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents," Naval Research Logistics (NRL), John Wiley & Sons, vol. 65(5), pages 393-409, August.
    13. Simon Thevenin & Nicolas Zufferey & Rémy Glardon, 2017. "Model and metaheuristics for a scheduling problem integrating procurement, sale and distribution decisions," Annals of Operations Research, Springer, vol. 259(1), pages 437-460, December.
    14. Li, Kai & Jia, Zhao-hong & Leung, Joseph Y.-T., 2015. "Integrated production and delivery on parallel batching machines," European Journal of Operational Research, Elsevier, vol. 247(3), pages 755-763.
    15. Liang-Liang Fu & Mohamed Ali Aloulou & Christian Artigues, 2018. "Integrated production and outbound distribution scheduling problems with job release dates and deadlines," Journal of Scheduling, Springer, vol. 21(4), pages 443-460, August.
    16. Liang Tang & Zhihong Jin & Xuwei Qin & Ke Jing, 2019. "Supply chain scheduling in a collaborative manufacturing mode: model construction and algorithm design," Annals of Operations Research, Springer, vol. 275(2), pages 685-714, April.
    17. Han, Bin & Zhang, Wenjun & Lu, Xiwen & Lin, Yingzi, 2015. "On-line supply chain scheduling for single-machine and parallel-machine configurations with a single customer: Minimizing the makespan and delivery cost," European Journal of Operational Research, Elsevier, vol. 244(3), pages 704-714.
    18. Xiaoyu Yu & Jingyi Qian & Yajing Zhang & Min Kong, 2023. "Supply Chain Scheduling Method for the Coordination of Agile Production and Port Delivery Operation," Mathematics, MDPI, vol. 11(15), pages 1-24, July.
    19. Lixin Tang & Feng Li & Zhi-Long Chen, 2019. "Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms," INFORMS Journal on Computing, INFORMS, vol. 31(3), pages 493-514, July.
    20. Justkowiak, Jan-Erik & Kovalev, Sergey & Kovalyov, Mikhail Y. & Pesch, Erwin, 2023. "Single machine scheduling with assignable due dates to minimize maximum and total late work," European Journal of Operational Research, Elsevier, vol. 308(1), pages 76-83.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:transe:v:125:y:2019:i:c:p:334-347. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/600244/description#description .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.