Solution approaches for the soft drink integrated production lot sizing and scheduling problem

Author

Listed:
  • Ferreira, Deisemara
  • Morabito, Reinaldo
  • Rangel, Socorro

Abstract

In this paper we present a mixed integer programming model that integrates production lot sizing and scheduling decisions of beverage plants with sequence-dependent setup costs and times. The model considers that the industrial process produces soft drink bottles in different flavours and sizes, and it is carried out in two production stages: liquid preparation (stage I) and bottling (stage II). The model also takes into account that the production bottleneck may alternate between stages I and II, and a synchronisation of the production between these stages is required. A relaxation approach and several strategies of the relax-and-fix heuristic are proposed to solve the model. Computational tests with instances generated based on real data from a Brazilian soft drink plant are also presented. The results show that the solution approaches are capable of producing better solutions than those used by the company.

Suggested Citation

  • Ferreira, Deisemara & Morabito, Reinaldo & Rangel, Socorro, 2009. "Solution approaches for the soft drink integrated production lot sizing and scheduling problem," European Journal of Operational Research, Elsevier, vol. 196(2), pages 697-706, July.
  • Handle: RePEc:eee:ejores:v:196:y:2009:i:2:p:697-706
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(08)00339-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Meyr, H., 2000. "Simultaneous Lotsizing and Scheduling by combining Local Search with Dual Reoptimization," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 39380, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    2. Awi Federgruen & Joern Meissner & Michal Tzur, 2007. "Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems," Operations Research, INFORMS, vol. 55(3), pages 490-502, June.
    3. Gabriel R. Bitran & Horacio H. Yanasse, 1982. "Computational Complexity of the Capacitated Lot Size Problem," Management Science, INFORMS, vol. 28(10), pages 1174-1186, October.
    4. Fleischmann, B. & Meyr, H., 1997. "The General Lotsizing and Scheduling Problem," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 36068, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    5. Meyr, H., 2000. "Simultaneous lotsizing and scheduling by combining local search with dual reoptimization," European Journal of Operational Research, Elsevier, vol. 120(2), pages 311-326, January.
    6. Dillenberger, Christof & Escudero, Laureano F. & Wollensak, Artur & Zhang, Wu, 1994. "On practical resource allocation for production planning and scheduling with period overlapping setups," European Journal of Operational Research, Elsevier, vol. 75(2), pages 275-286, June.
    7. Toledo, Franklina Maria Bragion & Armentano, Vinicius Amaral, 2006. "A Lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1070-1083, December.
    8. Fleischmann, Bernhard, 1990. "The discrete lot-sizing and scheduling problem," European Journal of Operational Research, Elsevier, vol. 44(3), pages 337-348, February.
    9. Laureano Escudero & Javier Salmeron, 2005. "On a Fix-and-Relax Framework for a Class of Project Scheduling Problems," Annals of Operations Research, Springer, vol. 140(1), pages 163-188, November.
    10. Drexl, A. & Kimms, A., 1997. "Lot sizing and scheduling -- Survey and extensions," European Journal of Operational Research, Elsevier, vol. 99(2), pages 221-235, June.
    11. Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Dražen Popović & Nenad Bjelić & Milorad Vidović & Branislava Ratković, 2023. "Solving a Production Lot-Sizing and Scheduling Problem from an Enhanced Inventory Management Perspective," Mathematics, MDPI, vol. 11(9), pages 1-23, April.
    2. Stadtler, Hartmut, 2011. "Multi-level single machine lot-sizing and scheduling with zero lead times," European Journal of Operational Research, Elsevier, vol. 209(3), pages 241-252, March.
    3. Camargo, Victor C.B. & Toledo, Franklina M.B. & Almada-Lobo, Bernardo, 2014. "HOPS – Hamming-Oriented Partition Search for production planning in the spinning industry," European Journal of Operational Research, Elsevier, vol. 234(1), pages 266-277.
    4. Kristin Uggen & Marte Fodstad & Vibeke Nørstebø, 2013. "Using and extending fix-and-relax to solve maritime inventory routing problems," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 21(2), pages 355-377, July.
    5. Wei, Wenchao & Guimarães, Luis & Amorim, Pedro & Almada-Lobo, Bernardo, 2017. "Tactical production and distribution planning with dependency issues on the production process," Omega, Elsevier, vol. 67(C), pages 99-114.
    6. Alyne Toscano & Deisemara Ferreira & Reinaldo Morabito, 2019. "A decomposition heuristic to solve the two-stage lot sizing and scheduling problem with temporal cleaning," Flexible Services and Manufacturing Journal, Springer, vol. 31(1), pages 142-173, March.
    7. Wolfgang Albrecht & Martin Steinrücke, 2020. "Continuous-time scheduling of production, distribution and sales in photovoltaic supply chains with declining prices," Flexible Services and Manufacturing Journal, Springer, vol. 32(3), pages 629-667, September.
    8. Meyr, Herbert & Mann, Matthias, 2013. "A decomposition approach for the General Lotsizing and Scheduling Problem for Parallel production Lines," European Journal of Operational Research, Elsevier, vol. 229(3), pages 718-731.
    9. Carvalho, Desiree M. & Nascimento, Mariá C.V., 2022. "Hybrid matheuristics to solve the integrated lot sizing and scheduling problem on parallel machines with sequence-dependent and non-triangular setup," European Journal of Operational Research, Elsevier, vol. 296(1), pages 158-173.
    10. Martin Wörbelauer & Herbert Meyr & Bernardo Almada-Lobo, 2019. "Simultaneous lotsizing and scheduling considering secondary resources: a general model, literature review and classification," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(1), pages 1-43, March.
    11. Junqueira, Rogerio de Ávila Ribeiro & Morabito, Reinaldo, 2019. "Modeling and solving a sugarcane harvest front scheduling problem," International Journal of Production Economics, Elsevier, vol. 213(C), pages 150-160.
    12. Miloš Milenković & Susana Val & Nebojša Bojović, 2023. "Simultaneous lot sizing and scheduling in the animal feed premix industry," Operational Research, Springer, vol. 23(2), pages 1-40, June.
    13. Markus Mickein & Matthes Koch & Knut Haase, 2022. "A Decision Support System for Brewery Production Planning at Feldschlösschen," Interfaces, INFORMS, vol. 52(2), pages 158-172, March.
    14. Karina Copil & Martin Wörbelauer & Herbert Meyr & Horst Tempelmeier, 2017. "Simultaneous lotsizing and scheduling problems: a classification and review of models," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 1-64, January.
    15. Pedro L. Miranda & Reinaldo Morabito & Deisemara Ferreira, 2018. "Optimization model for a production, inventory, distribution and routing problem in small furniture companies," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 26(1), pages 30-67, April.
    16. Mac Cawley, Alejandro & Maturana, Sergio & Pascual, Rodrigo & Tortorella, Guilherme Luz, 2022. "Scheduling wine bottling operations with multiple lines and sequence-dependent set-up times: Robust formulation and a decomposition solution approach," European Journal of Operational Research, Elsevier, vol. 303(2), pages 819-839.
    17. Guimarães, Luis & Klabjan, Diego & Almada-Lobo, Bernardo, 2013. "Pricing, relaxing and fixing under lot sizing and scheduling," European Journal of Operational Research, Elsevier, vol. 230(2), pages 399-411.
    18. Ferreira, Deisemara & Clark, Alistair R. & Almada-Lobo, Bernardo & Morabito, Reinaldo, 2012. "Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production," International Journal of Production Economics, Elsevier, vol. 136(2), pages 255-265.
    19. Dirk Briskorn & Philipp Zeise, 2019. "A cyclic production scheme for the synchronized and integrated two-level lot-sizing and scheduling problem with no-wait restrictions and stochastic demand," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 895-942, December.
    20. Lu, Liang & Qi, Xiangtong, 2011. "Dynamic lot sizing for multiple products with a new joint replenishment model," European Journal of Operational Research, Elsevier, vol. 212(1), pages 74-80, July.
    21. Hu, Zhengyang & Hu, Guiping, 2016. "A two-stage stochastic programming model for lot-sizing and scheduling under uncertainty," International Journal of Production Economics, Elsevier, vol. 180(C), pages 198-207.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ferreira, Deisemara & Clark, Alistair R. & Almada-Lobo, Bernardo & Morabito, Reinaldo, 2012. "Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production," International Journal of Production Economics, Elsevier, vol. 136(2), pages 255-265.
    2. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
    3. Daniel Quadt & Heinrich Kuhn, 2009. "Capacitated lot‐sizing and scheduling with parallel machines, back‐orders, and setup carry‐over," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(4), pages 366-384, June.
    4. Masoumeh Mahdieh & Alistair Clark & Mehdi Bijari, 2018. "A novel flexible model for lot sizing and scheduling with non-triangular, period overlapping and carryover setups in different machine configurations," Flexible Services and Manufacturing Journal, Springer, vol. 30(4), pages 884-923, December.
    5. Wolosewicz, Cathy & Dauzère-Pérès, Stéphane & Aggoune, Riad, 2015. "A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem," European Journal of Operational Research, Elsevier, vol. 244(1), pages 3-12.
    6. Guimarães, Luis & Klabjan, Diego & Almada-Lobo, Bernardo, 2013. "Pricing, relaxing and fixing under lot sizing and scheduling," European Journal of Operational Research, Elsevier, vol. 230(2), pages 399-411.
    7. K. A. G. Araujo & E. G. Birgin & M. S. Kawamura & D. P. Ronconi, 2023. "Relax-and-Fix Heuristics Applied to a Real-World Lot Sizing and Scheduling Problem in the Personal Care Consumer Goods Industry," SN Operations Research Forum, Springer, vol. 4(2), pages 1-30, June.
    8. Józefowska, J. & Zimniak, A., 2008. "Optimization tool for short-term production planning and scheduling," International Journal of Production Economics, Elsevier, vol. 112(1), pages 109-120, March.
    9. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    10. Meyr, Herbert & Mann, Matthias, 2013. "A decomposition approach for the General Lotsizing and Scheduling Problem for Parallel production Lines," European Journal of Operational Research, Elsevier, vol. 229(3), pages 718-731.
    11. Lee, Younsoo & Lee, Kyungsik, 2020. "Lot-sizing and scheduling in flat-panel display manufacturing process," Omega, Elsevier, vol. 93(C).
    12. Kovcs, Andrs & Brown, Kenneth N. & Tarim, S. Armagan, 2009. "An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups," International Journal of Production Economics, Elsevier, vol. 118(1), pages 282-291, March.
    13. Bredstrom, David & Lundgren, Jan T. & Ronnqvist, Mikael & Carlsson, Dick & Mason, Andrew, 2004. "Supply chain optimization in the pulp mill industry--IP models, column generation and novel constraint branches," European Journal of Operational Research, Elsevier, vol. 156(1), pages 2-22, July.
    14. Fabrizio Marinelli & Maria Nenni & Antonio Sforza, 2007. "Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company," Annals of Operations Research, Springer, vol. 150(1), pages 177-192, March.
    15. Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.
    16. Guimarães, Luis & Klabjan, Diego & Almada-Lobo, Bernardo, 2014. "Modeling lotsizing and scheduling problems with sequence dependent setups," European Journal of Operational Research, Elsevier, vol. 239(3), pages 644-662.
    17. Weidenhiller, Andreas & Jodlbauer, Herbert, 2009. "Equivalence classes of problem instances for a continuous-time lot sizing and scheduling problem," European Journal of Operational Research, Elsevier, vol. 199(1), pages 139-149, November.
    18. Tiacci, Lorenzo & Saetta, Stefano, 2012. "Demand forecasting, lot sizing and scheduling on a rolling horizon basis," International Journal of Production Economics, Elsevier, vol. 140(2), pages 803-814.
    19. Andrea Raiconi & Julia Pahl & Monica Gentili & Stefan Voß & Raffaele Cerulli, 2017. "Tactical Production and Lot Size Planning with Lifetime Constraints: A Comparison of Model Formulations," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(05), pages 1-24, October.
    20. Karina Copil & Martin Wörbelauer & Herbert Meyr & Horst Tempelmeier, 2017. "Simultaneous lotsizing and scheduling problems: a classification and review of models," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 1-64, January.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:196:y:2009:i:2:p:697-706. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.