Using and extending fix-and-relax to solve maritime inventory routing problems
Author
Abstract
Suggested Citation
DOI: 10.1007/s11750-011-0174-z
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Alonso, Antonio & Escudero, Laureano F. & Teresa Ortuno, M., 2000. "A stochastic 0-1 program based approach for the air traffic flow management problem," European Journal of Operational Research, Elsevier, vol. 120(1), pages 47-62, January.
- Leif H. Appelgren, 1969. "A Column Generation Algorithm for a Ship Scheduling Problem," Transportation Science, INFORMS, vol. 3(1), pages 53-68, February.
- Ferreira, Deisemara & Morabito, Reinaldo & Rangel, Socorro, 2009. "Solution approaches for the soft drink integrated production lot sizing and scheduling problem," European Journal of Operational Research, Elsevier, vol. 196(2), pages 697-706, July.
- A. Alonso-Ayuso & L. Escudero & C. Pizarro, 2009. "On SIP algorithms for minimizing the mean-risk function in the multi-period single-source problem under uncertainty," Annals of Operations Research, Springer, vol. 166(1), pages 223-242, February.
- Stéphane Dauzère-Pérès & Atle Nordli & Asmund Olstad & Kjetil Haugen & Ulrich Koester & Myrstad Per Olav & Geir Teistklub & Alf Reistad, 2007. "Omya Hustadmarmor Optimizes Its Supply Chain for Delivering Calcium Carbonate Slurry to European Paper Manufacturers," Interfaces, INFORMS, vol. 37(1), pages 39-51, February.
- Awi Federgruen & Joern Meissner & Michal Tzur, 2007.
"Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems,"
Operations Research, INFORMS, vol. 55(3), pages 490-502, June.
- Awi Federgruen & Joern Meissner & Michal Tzur, 2002. "Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems," Working Papers MRG/0001, Department of Management Science, Lancaster University, revised Nov 2004.
- Stadtler, Hartmut, 2003. "Multilevel lot sizing with setup times and multiple constrained resources: Internally rolling schedules with lot-sizing windows," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 20204, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
- Miller, David M., 1987. "An interactive, computer-aided ship scheduling system," European Journal of Operational Research, Elsevier, vol. 32(3), pages 363-379, December.
- Marielle Christiansen, 1999. "Decomposition of a Combined Inventory and Time Constrained Ship Routing Problem," Transportation Science, INFORMS, vol. 33(1), pages 3-16, February.
- Dillenberger, Christof & Escudero, Laureano F. & Wollensak, Artur & Zhang, Wu, 1994. "On practical resource allocation for production planning and scheduling with period overlapping setups," European Journal of Operational Research, Elsevier, vol. 75(2), pages 275-286, June.
- Al-Khayyal, Faiz & Hwang, Seung-June, 2007. "Inventory constrained maritime routing and scheduling for multi-commodity liquid bulk, Part I: Applications and model," European Journal of Operational Research, Elsevier, vol. 176(1), pages 106-130, January.
- Marielle Christiansen & Kjetil Fagerholt & David Ronen, 2004. "Ship Routing and Scheduling: Status and Perspectives," Transportation Science, INFORMS, vol. 38(1), pages 1-18, February.
- Persson, Jan A. & Gothe-Lundgren, Maud, 2005. "Shipment planning at oil refineries using column generation and valid inequalities," European Journal of Operational Research, Elsevier, vol. 163(3), pages 631-652, June.
- Ouhimmou, M. & D'Amours, S. & Beauregard, R. & Ait-Kadi, D. & Chauhan, S. Singh, 2008. "Furniture supply chain tactical planning optimization using a time decomposition approach," European Journal of Operational Research, Elsevier, vol. 189(3), pages 952-970, September.
- Hartmut Stadtler, 2003. "Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows," Operations Research, INFORMS, vol. 51(3), pages 487-502, June.
- AkartunalI, Kerem & Miller, Andrew J., 2009. "A heuristic approach for big bucket multi-level production planning problems," European Journal of Operational Research, Elsevier, vol. 193(2), pages 396-411, March.
- A. Alonso-Ayuso & L. Escudero & C. Pizarro & H. Romeijn & D. Morales, 2006. "On solving the multi-period single-sourcing problem under uncertainty," Computational Management Science, Springer, vol. 3(1), pages 29-53, January.
- Marielle Christiansen & Bjørn Nygreen, 2005. "Robust Inventory Ship Routing by Column Generation," Springer Books, in: Guy Desaulniers & Jacques Desrosiers & Marius M. Solomon (ed.), Column Generation, chapter 0, pages 197-224, Springer.
- Leif H. Appelgren, 1971. "Integer Programming Methods for a Vessel Scheduling Problem," Transportation Science, INFORMS, vol. 5(1), pages 64-78, February.
- Roar Grønhaug & Marielle Christiansen, 2009. "Supply Chain Optimization for the Liquefied Natural Gas Business," Lecture Notes in Economics and Mathematical Systems, in: Jo A.E.E. Nunen & M. Grazia Speranza & Luca Bertazzi (ed.), Innovations in Distribution Logistics, chapter 10, pages 195-218, Springer.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Agostinho Agra & Marielle Christiansen & Kristine S. Ivarsøy & Ida Elise Solhaug & Asgeir Tomasgard, 2017. "Combined ship routing and inventory management in the salmon farming industry," Annals of Operations Research, Springer, vol. 253(2), pages 799-823, June.
- Hemmati, Ahmad & Hvattum, Lars Magnus & Christiansen, Marielle & Laporte, Gilbert, 2016. "An iterative two-phase hybrid matheuristic for a multi-product short sea inventory-routing problem," European Journal of Operational Research, Elsevier, vol. 252(3), pages 775-788.
- Wei, Mingyuan & Qi, Mingyao & Wu, Tao & Zhang, Canrong, 2019. "Distance and matching-induced search algorithm for the multi-level lot-sizing problem with substitutable bill of materials," European Journal of Operational Research, Elsevier, vol. 277(2), pages 521-541.
- Papageorgiou, Dimitri J. & Nemhauser, George L. & Sokol, Joel & Cheon, Myun-Seok & Keha, Ahmet B., 2014. "MIRPLib – A library of maritime inventory routing problem instances: Survey, core model, and benchmark results," European Journal of Operational Research, Elsevier, vol. 235(2), pages 350-366.
- Mingyu Li & Peter Schütz, 2020. "Planning Annual LNG Deliveries with Transshipment," Energies, MDPI, vol. 13(6), pages 1-24, March.
- Ghiami, Yousef & Demir, Emrah & Van Woensel, Tom & Christiansen, Marielle & Laporte, Gilbert, 2019. "A deteriorating inventory routing problem for an inland liquefied natural gas distribution network," Transportation Research Part B: Methodological, Elsevier, vol. 126(C), pages 45-67.
- Dimitri J. Papageorgiou & Myun-Seok Cheon & George Nemhauser & Joel Sokol, 2015. "Approximate Dynamic Programming for a Class of Long-Horizon Maritime Inventory Routing Problems," Transportation Science, INFORMS, vol. 49(4), pages 870-885, November.
- Yuan, Jun & Shi, Xunpeng & He, Junliang, 2024. "LNG market liberalization and LNG transportation: Evaluation based on fleet size and composition model," Applied Energy, Elsevier, vol. 358(C).
- Leandro C. Coelho & Jean-François Cordeau & Gilbert Laporte, 2014. "Thirty Years of Inventory Routing," Transportation Science, INFORMS, vol. 48(1), pages 1-19, February.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Leandro C. Coelho & Jean-François Cordeau & Gilbert Laporte, 2014. "Thirty Years of Inventory Routing," Transportation Science, INFORMS, vol. 48(1), pages 1-19, February.
- Christiansen, Marielle & Fagerholt, Kjetil & Nygreen, Bjørn & Ronen, David, 2013. "Ship routing and scheduling in the new millennium," European Journal of Operational Research, Elsevier, vol. 228(3), pages 467-483.
- Roar Grønhaug & Marielle Christiansen & Guy Desaulniers & Jacques Desrosiers, 2010. "A Branch-and-Price Method for a Liquefied Natural Gas Inventory Routing Problem," Transportation Science, INFORMS, vol. 44(3), pages 400-415, August.
- Hennig, F. & Nygreen, B. & Christiansen, M. & Fagerholt, K. & Furman, K.C. & Song, J. & Kocis, G.R. & Warrick, P.H., 2012. "Maritime crude oil transportation – A split pickup and split delivery problem," European Journal of Operational Research, Elsevier, vol. 218(3), pages 764-774.
- Agra, Agostinho & Christiansen, Marielle & Delgado, Alexandrino & Simonetti, Luidi, 2014. "Hybrid heuristics for a short sea inventory routing problem," European Journal of Operational Research, Elsevier, vol. 236(3), pages 924-935.
- Papageorgiou, Dimitri J. & Nemhauser, George L. & Sokol, Joel & Cheon, Myun-Seok & Keha, Ahmet B., 2014. "MIRPLib – A library of maritime inventory routing problem instances: Survey, core model, and benchmark results," European Journal of Operational Research, Elsevier, vol. 235(2), pages 350-366.
- Christiansen, Marielle & Fagerholt, Kjetil & Flatberg, Truls & Haugen, Øyvind & Kloster, Oddvar & Lund, Erik H., 2011. "Maritime inventory routing with multiple products: A case study from the cement industry," European Journal of Operational Research, Elsevier, vol. 208(1), pages 86-94, January.
- de Assis, Leonardo Salsano & Camponogara, Eduardo, 2016. "A MILP model for planning the trips of dynamic positioned tankers with variable travel time," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 93(C), pages 372-388.
- Mutlu, Fatih & Msakni, Mohamed K. & Yildiz, Hakan & Sönmez, Erkut & Pokharel, Shaligram, 2016. "A comprehensive annual delivery program for upstream liquefied natural gas supply chain," European Journal of Operational Research, Elsevier, vol. 250(1), pages 120-130.
- Gustavo Diz & Luiz Felipe Scavarda & Roger Rocha & Silvio Hamacher, 2014. "Decision Support System for PETROBRAS Ship Scheduling," Interfaces, INFORMS, vol. 44(6), pages 555-566, December.
- Ricardo Gatica & Pablo Miranda, 2011. "Special Issue on Latin-American Research: A Time Based Discretization Approach for Ship Routing and Scheduling with Variable Speed," Networks and Spatial Economics, Springer, vol. 11(3), pages 465-485, September.
- Agostinho Agra & Marielle Christiansen & Alexandrino Delgado, 2013. "Mixed Integer Formulations for a Short Sea Fuel Oil Distribution Problem," Transportation Science, INFORMS, vol. 47(1), pages 108-124, February.
- Guido, Rosita & Groccia, Maria Carmela & Conforti, Domenico, 2018. "An efficient matheuristic for offline patient-to-bed assignment problems," European Journal of Operational Research, Elsevier, vol. 268(2), pages 486-503.
- Kerem Akartunalı & Ioannis Fragkos & Andrew J. Miller & Tao Wu, 2016. "Local Cuts and Two-Period Convex Hull Closures for Big-Bucket Lot-Sizing Problems," INFORMS Journal on Computing, INFORMS, vol. 28(4), pages 766-780, November.
- Boutarfa, Y. & Senoussi, A. & Brahimi, N. & Aouam, T., 2024. "Integration and substitution in hybrid manufacturing and refurbishing systems," International Journal of Production Economics, Elsevier, vol. 274(C).
- Rizvanolli, Anisa & Haupt, Alexander & Müller, Peter Marvin & Dornemann, Jorin, 2019. "Fleet based schedule optimisation for product tanker considering shipʼs stability," Chapters from the Proceedings of the Hamburg International Conference of Logistics (HICL), in: Jahn, Carlos & Kersten, Wolfgang & Ringle, Christian M. (ed.), Digital Transformation in Maritime and City Logistics: Smart Solutions for Logistics. Proceedings of the Hamburg International Conference of Logistics, volume 28, pages 395-426, Hamburg University of Technology (TUHH), Institute of Business Logistics and General Management.
- Brønmo, Geir & Nygreen, Bjørn & Lysgaard, Jens, 2010. "Column generation approaches to ship scheduling with flexible cargo sizes," European Journal of Operational Research, Elsevier, vol. 200(1), pages 139-150, January.
- Ahmed Senoussi & Youcef Boutarfa & Nadjib Brahimi & Tarik Aouam, 2024. "Sustainable Hybrid Manufacturing and Refurbishing Systems with Substitution," Sustainability, MDPI, vol. 16(17), pages 1-33, August.
- Kerem Akartunalı & Andrew Miller, 2012. "A computational analysis of lower bounds for big bucket production planning problems," Computational Optimization and Applications, Springer, vol. 53(3), pages 729-753, December.
- Lang, Jan Christian & Shen, Zuo-Jun Max, 2011. "Fix-and-optimize heuristics for capacitated lot-sizing with sequence-dependent setups and substitutions," European Journal of Operational Research, Elsevier, vol. 214(3), pages 595-605, November.
More about this item
Keywords
Fix-and-relax; Time decomposition heuristic; Maritime inventory routing problem (IRP); Liquefied natural gas (LNG); 90C59; 90B06; 90C11;All these keywords.
JEL classification:
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:topjnl:v:21:y:2013:i:2:p:355-377. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.