IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v194y2009i3p753-773.html
   My bibliography  Save this article

Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers

Author

Listed:
  • Sarker, Bhaba R.
  • Diponegoro, Ahmad

Abstract

This research addresses an optimal policy for production and procurement in a supply-chain system with multiple non-competing suppliers, a manufacturer and multiple non-identical buyers. The manufacturer procures raw materials from suppliers, converts them to finished products and ships the products to each buyer at a fixed-interval of time over a finite planning horizon. The demand of finished product is given by buyers and the shipment size to each buyer is fixed. The problem is to determine the production start time, the initial and ending inventory, the cycle beginning and ending time, the number of orders of raw materials in each cycle, and the number of cycles for a finite planning horizon so as to minimize the system cost. A surrogate network representation of the problem developed to obtain an efficient, optimal solution to determine the production cycle and cycle costs with predetermined shipment schedules in the planning horizon. This research prescribes optimal policies for a multi-stage production and procurements for all shipments scheduled over the planning horizon. Numerical examples are also provided to illustrate the system.

Suggested Citation

  • Sarker, Bhaba R. & Diponegoro, Ahmad, 2009. "Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers," European Journal of Operational Research, Elsevier, vol. 194(3), pages 753-773, May.
  • Handle: RePEc:eee:ejores:v:194:y:2009:i:3:p:753-773
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(08)00127-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Lu, Lu, 1995. "A one-vendor multi-buyer integrated inventory model," European Journal of Operational Research, Elsevier, vol. 81(2), pages 312-323, March.
    2. Peter J. Billington & John O. McClain & L. Joseph Thomas, 1983. "Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction," Management Science, INFORMS, vol. 29(10), pages 1126-1141, October.
    3. Rahman, Mohammad Anwar Ashek & Sarker, Bhaba R., 2007. "Supply chain models for an assembly system with preprocessing of raw materials," European Journal of Operational Research, Elsevier, vol. 181(2), pages 733-752, September.
    4. Robin O. Roundy, 1993. "Efficient, Effective Lot Sizing for Multistage Production Systems," Operations Research, INFORMS, vol. 41(2), pages 371-385, April.
    5. Leroy B. Schwarz & Bryan L. Deuermeyer & Ralph D. Badinelli, 1985. "Fill-Rate Optimization in a One-Warehouse N-Identical Retailer Distribution System," Management Science, INFORMS, vol. 31(4), pages 488-498, April.
    6. M-W Park & Y-D Kim, 1999. "A heuristic algorithm for a production planning problem in an assembly system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(2), pages 138-147, February.
    7. Salah E. Elmaghraby, 1978. "The Economic Lot Scheduling Problem (ELSP): Review and Extensions," Management Science, INFORMS, vol. 24(6), pages 587-598, February.
    8. Gabriel R. Bitran & Horacio H. Yanasse, 1982. "Computational Complexity of the Capacitated Lot Size Problem," Management Science, INFORMS, vol. 28(10), pages 1174-1186, October.
    9. Sarker, Bhaba R. & Parija, Gyana R., 1996. "Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system," European Journal of Operational Research, Elsevier, vol. 89(3), pages 593-608, March.
    10. E J Comeaux & B R Sarker, 2006. "Optimal inventory policy for specialty chemical products in multiple packages," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(4), pages 357-366, April.
    11. Edward J. McGavin & Leroy B. Schwarz & James E. Ward, 1993. "Two-Interval Inventory-Allocation Policies in a One-Warehouse N-Identical-Retailer Distribution System," Management Science, INFORMS, vol. 39(9), pages 1092-1107, September.
    12. Goyal, Suresh K. & Gupta, Yash P., 1989. "Integrated inventory models: The buyer-vendor coordination," European Journal of Operational Research, Elsevier, vol. 41(3), pages 261-269, August.
    13. Ramesh Bollapragada & Uday S. Rao & Jun Zhang, 2004. "Managing Inventory and Supply Performance in Assembly Systems with Random Supply Capacity and Demand," Management Science, INFORMS, vol. 50(12), pages 1729-1743, December.
    14. Diponegoro, Ahmad & Sarker, Bhaba R., 2002. "Determining manufacturing batch sizes for a lumpy delivery system with trend demand," International Journal of Production Economics, Elsevier, vol. 77(2), pages 131-143, May.
    15. Bezalel Gavish & Robert E. Johnson, 1990. "A Fully Polynomial Approximation Scheme for Single-Product Scheduling in a Finite Capacity Facility," Operations Research, INFORMS, vol. 38(1), pages 70-83, February.
    16. Dellaert, Nico & de Kok, Ton, 2004. "Integrating resource and production decisions in a simple multi-stage assembly system," International Journal of Production Economics, Elsevier, vol. 90(3), pages 281-294, August.
    17. A Diponegoro & B R Sarker, 2007. "Operations policy for a supply chain system with fixed-interval delivery and linear demand," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(7), pages 901-910, July.
    18. Elena Katok & Holly S. Lewis & Terry P. Harrison, 1998. "Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources," Management Science, INFORMS, vol. 44(6), pages 859-877, June.
    19. Goyal, S. K., 1995. "A one-vendor multi-buyer integrated inventory model: A comment," European Journal of Operational Research, Elsevier, vol. 82(1), pages 209-210, April.
    20. E J Comeaux & B R Sarker, 2005. "Joint optimization of process improvement investments for supplier–buyer cooperative commerce," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(11), pages 1310-1324, November.
    21. Sarker, Bhaba R. & Jamal, A.M.M. & Mondal, Sanjay, 2008. "Optimal batch sizing in a multi-stage production system with rework consideration," European Journal of Operational Research, Elsevier, vol. 184(3), pages 915-929, February.
    22. Wang, Shaojun & Sarker, Bhaba R., 2006. "Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy," European Journal of Operational Research, Elsevier, vol. 172(1), pages 179-200, July.
    23. Terry P. Harrison & Holly S. Lewis, 1996. "Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources," Management Science, INFORMS, vol. 42(1), pages 19-36, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ik Sun Lee, 2016. "Production and shipment policy under dynamic demand in the supply chain environments," International Journal of Applied Management Science, Inderscience Enterprises Ltd, vol. 8(1), pages 1-19.
    2. Xuan Qiu & Jasmine Siu Lee Lam, 2018. "The Value of Sharing Inland Transportation Services in a Dry Port System," Transportation Science, INFORMS, vol. 52(4), pages 835-849, August.
    3. Wu, Kan & Yuan, Xue-Ming, 2016. "Optimal production-inventory policy for an integrated multi-stage supply chain with time-varying demandAuthor-Name: Zhao, Shi Tao," European Journal of Operational Research, Elsevier, vol. 255(2), pages 364-379.
    4. Liang, Wen Yau & Huang, Chun-Che & Lin, Yin-Chen & Chang, Tsun Hsien & Shih, Meng Hao, 2013. "The multi-objective label correcting algorithm for supply chain modeling," International Journal of Production Economics, Elsevier, vol. 142(1), pages 172-178.
    5. Zhai, Yue & Cheng, T.C.E., 2022. "Lead-time quotation and hedging coordination in make-to-order supply chain," European Journal of Operational Research, Elsevier, vol. 300(2), pages 449-460.
    6. Glock, Christoph H., 2012. "Coordination of a production network with a single buyer and multiple vendors," International Journal of Production Economics, Elsevier, vol. 135(2), pages 771-780.
    7. Qiu, Xuan & Huang, George Q., 2016. "Transportation service sharing and replenishment/delivery scheduling in Supply Hub in Industrial Park (SHIP)," International Journal of Production Economics, Elsevier, vol. 175(C), pages 109-120.
    8. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Erenguc, S. Selcuk & Simpson, N. C. & Vakharia, Asoo J., 1999. "Integrated production/distribution planning in supply chains: An invited review," European Journal of Operational Research, Elsevier, vol. 115(2), pages 219-236, June.
    2. Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.
    3. Chung, Chun Jen & Wee, Hui Ming, 2007. "Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives," European Journal of Operational Research, Elsevier, vol. 183(2), pages 933-943, December.
    4. Hill, Roger M., 1997. "The single-vendor single-buyer integrated production-inventory model with a generalised policy," European Journal of Operational Research, Elsevier, vol. 97(3), pages 493-499, March.
    5. Abdul-Jalbar, Beatriz & Gutierrez, Jose M. & Sicilia, Joaquin, 2007. "An integrated inventory model for the single-vendor two-buyer problem," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 246-258, July.
    6. David, Israel & Eben-Chaime, Moshe, 2003. "How far should JIT vendor-buyer relationships go?," International Journal of Production Economics, Elsevier, vol. 81(1), pages 361-368, January.
    7. Elena Katok & Dennis Ott, 2000. "Using Mixed-Integer Programming to Reduce Label Changes in the Coors Aluminum Can Plant," Interfaces, INFORMS, vol. 30(2), pages 1-12, April.
    8. Mohamed E. Seliaman, 2013. "Optimizing the Two-Stage Supply Chain Inventory Model with Full Information Sharing and Two Backorders Costs Using Hybrid Geometric-Algebraic Method," Journal of Optimization, Hindawi, vol. 2013, pages 1-5, May.
    9. Berretta, Regina & Rodrigues, Luiz Fernando, 2004. "A memetic algorithm for a multistage capacitated lot-sizing problem," International Journal of Production Economics, Elsevier, vol. 87(1), pages 67-81, January.
    10. Sucky, Eric, 2005. "Inventory management in supply chains: A bargaining problem," International Journal of Production Economics, Elsevier, vol. 93(1), pages 253-262, January.
    11. Glock, Christoph H., 2012. "Coordination of a production network with a single buyer and multiple vendors," International Journal of Production Economics, Elsevier, vol. 135(2), pages 771-780.
    12. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
    13. Simpson, N.C., 2007. "Central versus local multiple stage inventory planning: An analysis of solutions," European Journal of Operational Research, Elsevier, vol. 181(1), pages 127-138, August.
    14. Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    15. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    16. Rahman, Mohammad Anwar Ashek & Sarker, Bhaba R., 2007. "Supply chain models for an assembly system with preprocessing of raw materials," European Journal of Operational Research, Elsevier, vol. 181(2), pages 733-752, September.
    17. Helber, Stefan & Sahling, Florian, 2010. "A fix-and-optimize approach for the multi-level capacitated lot sizing problem," International Journal of Production Economics, Elsevier, vol. 123(2), pages 247-256, February.
    18. Sarmah, S.P. & Acharya, D. & Goyal, S.K., 2006. "Buyer vendor coordination models in supply chain management," European Journal of Operational Research, Elsevier, vol. 175(1), pages 1-15, November.
    19. Lee, Wenyih, 2005. "A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering," Omega, Elsevier, vol. 33(2), pages 163-174, April.
    20. Lee, Shine-Der & Fu, Yen-Chen, 2014. "Joint production and delivery lot sizing for a make-to-order producer–buyer supply chain with transportation cost," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 66(C), pages 23-35.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:194:y:2009:i:3:p:753-773. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.