IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v181y2007i2p733-752.html
   My bibliography  Save this article

Supply chain models for an assembly system with preprocessing of raw materials

Author

Listed:
  • Rahman, Mohammad Anwar Ashek
  • Sarker, Bhaba R.

Abstract

No abstract is available for this item.

Suggested Citation

  • Rahman, Mohammad Anwar Ashek & Sarker, Bhaba R., 2007. "Supply chain models for an assembly system with preprocessing of raw materials," European Journal of Operational Research, Elsevier, vol. 181(2), pages 733-752, September.
  • Handle: RePEc:eee:ejores:v:181:y:2007:i:2:p:733-752
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(06)00565-0
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Diponegoro, Ahmad & Sarker, Bhaba R., 2002. "Determining manufacturing batch sizes for a lumpy delivery system with trend demand," International Journal of Production Economics, Elsevier, vol. 77(2), pages 131-143, May.
    2. J Betts & R B Johnston, 2001. "Just-in-time replenishment decisions for assembly manufacturing with investor-supplied finance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 52(7), pages 750-761, July.
    3. M-W Park & Y-D Kim, 1999. "A heuristic algorithm for a production planning problem in an assembly system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(2), pages 138-147, February.
    4. Park, Moon-Won & Kim, Yeong-Dae, 2000. "A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints," European Journal of Operational Research, Elsevier, vol. 123(3), pages 504-518, June.
    5. de Kok, Ton G. & Visschers, Jeremy W. C. H., 1999. "Analysis of assembly systems with service level constraints," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 313-326, March.
    6. Gurnani, Haresh, 1996. "Optimal ordering policies in inventory systems with random demand and random deal offerings," European Journal of Operational Research, Elsevier, vol. 95(2), pages 299-312, December.
    7. Sarker, Bhaba R. & Parija, Gyana R., 1996. "Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system," European Journal of Operational Research, Elsevier, vol. 89(3), pages 593-608, March.
    8. Wilhelm, W. E. & Som, Pradip, 1998. "Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system," European Journal of Operational Research, Elsevier, vol. 108(1), pages 74-93, July.
    9. Rajamani, Divakar, 1993. "Classification and coding of components for implementing a computerized inventory control system for a television assembling industry," International Journal of Production Economics, Elsevier, vol. 32(2), pages 133-154, September.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Z X Chen & B R Sarker, 2010. "Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(11), pages 1654-1666, November.
    2. Zhisong Chen & Xiaoying Niu & Qingwu Gao & Jun Wang, 2024. "Bilateral shock effect and alleviation strategy: a game-theoretical study in international medical devices supply chain in the pandemic context," Operational Research, Springer, vol. 24(2), pages 1-37, June.
    3. Sarker, Bhaba R. & Diponegoro, Ahmad, 2009. "Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers," European Journal of Operational Research, Elsevier, vol. 194(3), pages 753-773, May.
    4. Adhikari, Arnab & Bisi, Arnab & Avittathur, Balram, 2020. "Coordination mechanism, risk sharing, and risk aversion in a five-level textile supply chain under demand and supply uncertainty," European Journal of Operational Research, Elsevier, vol. 282(1), pages 93-107.
    5. Wen-Tsung Ho & Jason Chao-Hsien Pan & Yu-Cheng Hsiao, 2012. "Optimizing Multi-stage Production for an Assembly-Type Supply Chain with Unequal Sized Batch Shipments," Journal of Optimization Theory and Applications, Springer, vol. 153(2), pages 513-531, May.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sarker, Bhaba R. & Diponegoro, Ahmad, 2009. "Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers," European Journal of Operational Research, Elsevier, vol. 194(3), pages 753-773, May.
    2. A Diponegoro & B R Sarker, 2007. "Operations policy for a supply chain system with fixed-interval delivery and linear demand," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(7), pages 901-910, July.
    3. Yan, Xiaoming & Zhang, Minghui & Liu, Ke, 2010. "A note on coordination in decentralized assembly systems with uncertain component yields," European Journal of Operational Research, Elsevier, vol. 205(2), pages 469-478, September.
    4. Jinfa Chen & David D. Yao & Shaohui Zheng, 2001. "Optimal Replenishment and Rework with Multiple Unreliable Supply Sources," Operations Research, INFORMS, vol. 49(3), pages 430-443, June.
    5. Sarker, Bhaba R. & Coates, Eyler Robert, 1997. "Manufacturing setup cost reduction under variable lead times and finite opportunities for investment," International Journal of Production Economics, Elsevier, vol. 49(3), pages 237-247, May.
    6. Ton de Kok & Fred Janssen & Jan van Doremalen & Erik van Wachem & Mathieu Clerkx & Winfried Peeters, 2005. "Philips Electronics Synchronizes Its Supply Chain to End the Bullwhip Effect," Interfaces, INFORMS, vol. 35(1), pages 37-48, February.
    7. Sarker, Bhaba R., 2014. "Consignment stocking policy models for supply chain systems: A critical review and comparative perspectives," International Journal of Production Economics, Elsevier, vol. 155(C), pages 52-67.
    8. van Donselaar, K. H. & Gubbels, B. J., 2002. "How to release orders in order to minimise system inventory and system nervousness?," International Journal of Production Economics, Elsevier, vol. 78(3), pages 335-343, August.
    9. Burak Kazaz, 2004. "Production Planning Under Yield and Demand Uncertainty with Yield-Dependent Cost and Price," Manufacturing & Service Operations Management, INFORMS, vol. 6(3), pages 209-224, October.
    10. Louly, Mohamed-Aly & Dolgui, Alexandre, 2011. "Optimal time phasing and periodicity for MRP with POQ policy," International Journal of Production Economics, Elsevier, vol. 131(1), pages 76-86, May.
    11. Ould-Louly, Mohamed-Aly & Dolgui, Alexandre, 2004. "The MPS parameterization under lead time uncertainty," International Journal of Production Economics, Elsevier, vol. 90(3), pages 369-376, August.
    12. Louly, Mohamed-Aly Ould & Dolgui, Alexandre, 2009. "Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm," European Journal of Operational Research, Elsevier, vol. 199(3), pages 723-731, December.
    13. Bengisu Urlu & Nesim K. Erkip, 2020. "Safety stock placement for serial systems under supply process uncertainty," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 395-424, June.
    14. Awi Federgruen & Nan Yang, 2008. "Selecting a Portfolio of Suppliers Under Demand and Supply Risks," Operations Research, INFORMS, vol. 56(4), pages 916-936, August.
    15. Diponegoro, Ahmad & Sarker, Bhaba R., 2002. "Determining manufacturing batch sizes for a lumpy delivery system with trend demand," International Journal of Production Economics, Elsevier, vol. 77(2), pages 131-143, May.
    16. Sarah Yini Gao & David Simchi-Levi & Chung-Piaw Teo & Zhenzhen Yan, 2019. "Disruption Risk Mitigation in Supply Chains: The Risk Exposure Index Revisited," Operations Research, INFORMS, vol. 67(3), pages 831-852, May.
    17. Elhafsi, Mohsen & Hamouda, Essia, 2015. "Managing an assemble-to-order system with after sales market for components," European Journal of Operational Research, Elsevier, vol. 242(3), pages 828-841.
    18. Eungab Kim & Kaphoon Lee & Suk-Ho Kang, 2006. "Optimal purchasing policy in a two-component assembly system with different purchasing contracts for each component," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 63(2), pages 301-327, May.
    19. Larsen, Kim S. & Wøhlk, Sanne, 2010. "Competitive analysis of the online inventory problem," European Journal of Operational Research, Elsevier, vol. 207(2), pages 685-696, December.
    20. Abdelhamid Boudjelida, 2019. "On the robustness of joint production and maintenance scheduling in presence of uncertainties," Journal of Intelligent Manufacturing, Springer, vol. 30(4), pages 1515-1530, April.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:181:y:2007:i:2:p:733-752. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.