The value of setup cost reduction and process improvement for the economic production quantity model with defects
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Affisco, John F. & Javad Paknejad, M. & Nasri, Farrokh, 2002. "Quality improvement and setup reduction in the joint economic lot size model," European Journal of Operational Research, Elsevier, vol. 142(3), pages 497-508, November.
- Hau L. Lee & Meir J. Rosenblatt, 1987. "Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System," Management Science, INFORMS, vol. 33(9), pages 1125-1136, September.
- Goyal, Suresh K. & Gupta, Yash P., 1989. "Integrated inventory models: The buyer-vendor coordination," European Journal of Operational Research, Elsevier, vol. 41(3), pages 261-269, August.
- Evan L. Porteus, 1985. "Investing in Reduced Setups in the EOQ Model," Management Science, INFORMS, vol. 31(8), pages 998-1010, August.
- Hau L. Lee & Meir J. Rosenblatt, 1986. "A Generalized Quantity Discount Pricing Model to Increase Supplier's Profits," Management Science, INFORMS, vol. 32(9), pages 1177-1185, September.
- Candace Arai Yano & Hau L. Lee, 1995. "Lot Sizing with Random Yields: A Review," Operations Research, INFORMS, vol. 43(2), pages 311-334, April.
- Wright, CM & Mehrez, A, 1998. "An Overview of Representative Research of the Relationships Between Quality and Inventory," Omega, Elsevier, vol. 26(1), pages 29-47, February.
- Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Kulkarni, Shailesh S., 2008. "Loss-based quality costs and inventory planning: General models and insights," European Journal of Operational Research, Elsevier, vol. 188(2), pages 428-449, July.
- Nasr, Walid W. & Jaber, Mohamad Y., 2019. "Supplier development in a two-level lot sizing problem with non-conforming items and learning," International Journal of Production Economics, Elsevier, vol. 216(C), pages 349-363.
- Darwish, M.A., 2008. "EPQ models with varying setup cost," International Journal of Production Economics, Elsevier, vol. 113(1), pages 297-306, May.
- Biswajit Sarkar & Sharmila Saren & Mitali Sarkar & Yong Won Seo, 2016. "A Stackelberg Game Approach in an Integrated Inventory Model with Carbon-Emission and Setup Cost Reduction," Sustainability, MDPI, vol. 8(12), pages 1-23, December.
- Diaby, Moustapha & Cruz, Jose M. & Nsakanda, Aaron L., 2013. "Shortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction," European Journal of Operational Research, Elsevier, vol. 228(3), pages 526-535.
- Umakanta Mishra & Jei-Zheng Wu & Anthony Shun Fung Chiu, 2019. "Effects of Carbon-Emission and Setup Cost Reduction in a Sustainable Electrical Energy Supply Chain Inventory System," Energies, MDPI, vol. 12(7), pages 1-18, March.
- R. Udayakumar & S. Priyan & Mandeep Mittal & Anuwat Jirawattanapanit & Grienggrai Rajchakit & Pramet Kaewmesri, 2022. "A Sustainable Production Scheduling with Backorders under Different Forms of Rework Process and Green Investment," Sustainability, MDPI, vol. 14(24), pages 1-38, December.
- Ata Allah Taleizadeh, 2018. "A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering," Annals of Operations Research, Springer, vol. 261(1), pages 303-337, February.
- Hsieh, Chung-Chi & Liu, Yu-Te, 2010. "Quality investment and inspection policy in a supplier-manufacturer supply chain," European Journal of Operational Research, Elsevier, vol. 202(3), pages 717-729, May.
- Thomas Sloan, 2008. "Simultaneous determination of production and maintenance schedules using in‐line equipment condition and yield information," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(2), pages 116-129, March.
- Basu, Arnab & Jain, Tarun & Hazra, Jishnu, 2018. "Supplier selection under production learning and process improvements," International Journal of Production Economics, Elsevier, vol. 204(C), pages 411-420.
- Nasr, Walid W. & Maddah, Bacel & Salameh, Moueen K., 2013. "EOQ with a correlated binomial supply," International Journal of Production Economics, Elsevier, vol. 144(1), pages 248-255.
- Wakhid Ahmad Jauhari & I Nyoman Pujawan & Mokh Suef, 2023. "Sustainable inventory management with hybrid production system and investment to reduce defects," Annals of Operations Research, Springer, vol. 324(1), pages 543-572, May.
- Maddah, Bacel & Moussawi, Lama & Jaber, Mohamad Y., 2010. "Lot sizing with a Markov production process and imperfect items scrapped," International Journal of Production Economics, Elsevier, vol. 124(2), pages 340-347, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Liu, Xingchu & Cetinkaya, Sila, 2007. "A note on "quality improvement and setup reduction in the joint economic lot size model"," European Journal of Operational Research, Elsevier, vol. 182(1), pages 194-204, October.
- Khan, M. & Jaber, M.Y. & Guiffrida, A.L. & Zolfaghari, S., 2011. "A review of the extensions of a modified EOQ model for imperfect quality items," International Journal of Production Economics, Elsevier, vol. 132(1), pages 1-12, July.
- Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2012. "Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return," International Journal of Production Economics, Elsevier, vol. 140(2), pages 922-933.
- Shoshana Anily & Avraham Beja & Amit Mendel, 2002. "Optimal Lot Sizes with Geometric Production Yield and Rigid Demand," Operations Research, INFORMS, vol. 50(3), pages 424-432, June.
- Khan, Mehmood & Jaber, Mohamad Y. & Bonney, Maurice, 2011. "An economic order quantity (EOQ) for items with imperfect quality and inspection errors," International Journal of Production Economics, Elsevier, vol. 133(1), pages 113-118, September.
- Maddah, Bacel & Moussawi, Lama & Jaber, Mohamad Y., 2010. "Lot sizing with a Markov production process and imperfect items scrapped," International Journal of Production Economics, Elsevier, vol. 124(2), pages 340-347, April.
- Diaby, Moustapha & Cruz, Jose M. & Nsakanda, Aaron L., 2013. "Shortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction," European Journal of Operational Research, Elsevier, vol. 228(3), pages 526-535.
- L-C Lin & K-L Hou, 2005. "An inventory system with investment to reduce yield variability and set-up cost," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(1), pages 67-74, January.
- Tien-Yu Lin & Kuo-Lung Hou, 2015. "An imperfect quality economic order quantity with advanced receiving," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 23(2), pages 535-551, July.
- Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2009. "Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return," International Journal of Production Economics, Elsevier, vol. 121(1), pages 255-265, September.
- Nasr, Walid W. & Maddah, Bacel & Salameh, Moueen K., 2013. "EOQ with a correlated binomial supply," International Journal of Production Economics, Elsevier, vol. 144(1), pages 248-255.
- Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.
- Dey, Oshmita & Chakraborty, Debjani, 2011. "A fuzzy random continuous review inventory system," International Journal of Production Economics, Elsevier, vol. 132(1), pages 101-106, July.
- Li, Xiang, 2020. "Reducing channel costs by investing in smart supply chain technologies," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 137(C).
- Kim, Chang Hyun & Hong, Yushin, 1997. "An extended EMQ model for a failure prone machine with general lifetime distribution," International Journal of Production Economics, Elsevier, vol. 49(3), pages 215-223, May.
- T W Sloan, 2004. "A periodic review production and maintenance model with random demand, deteriorating equipment, and binomial yield," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(6), pages 647-656, June.
- B.C. Giri & S. Sharma, 2014. "Lot sizing and unequal-sized shipment policy for an integrated production-inventory system," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(5), pages 888-901, May.
- Wright, CM & Mehrez, A, 1998. "An Overview of Representative Research of the Relationships Between Quality and Inventory," Omega, Elsevier, vol. 26(1), pages 29-47, February.
- Darwish, M.A., 2008. "EPQ models with varying setup cost," International Journal of Production Economics, Elsevier, vol. 113(1), pages 297-306, May.
- Kaijie Zhu & Rachel Q. Zhang & Fugee Tsung, 2007. "Pushing Quality Improvement Along Supply Chains," Management Science, INFORMS, vol. 53(3), pages 421-436, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:173:y:2006:i:1:p:241-251. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.