Quality investment and inspection policy in a supplier-manufacturer supply chain
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Affisco, John F. & Javad Paknejad, M. & Nasri, Farrokh, 2002. "Quality improvement and setup reduction in the joint economic lot size model," European Journal of Operational Research, Elsevier, vol. 142(3), pages 497-508, November.
- Reyniers, Diane J. & Tapiero, Charles S., 1995. "Contract design and the control of quality in a conflictual environment," European Journal of Operational Research, Elsevier, vol. 82(2), pages 373-382, April.
- Diane J. Reyniers & Charles S. Tapiero, 1995. "The Delivery and Control of Quality in Supplier-Producer Contracts," Management Science, INFORMS, vol. 41(10), pages 1581-1589, October.
- Cheong Ng, Wing & Van Hui, Yer, 1997. "Economic design of a complete inspection plan with interactive quality improvement," European Journal of Operational Research, Elsevier, vol. 96(1), pages 122-129, January.
- Kashi R. Balachandran & Suresh Radhakrishnan, 2005. "Quality Implications of Warranties in a Supply Chain," Management Science, INFORMS, vol. 51(8), pages 1266-1277, August.
- Ben-Daya, M. & Noman, S.M., 2008. "Integrated inventory and inspection policies for stochastic demand," European Journal of Operational Research, Elsevier, vol. 185(1), pages 159-169, February.
- Stanley Baiman & Paul E. Fischer & Madhav V. Rajan, 2000. "Information, Contracting, and Quality Costs," Management Science, INFORMS, vol. 46(6), pages 776-789, June.
- Wei Shi Lim, 2001. "Producer-Supplier Contracts with Incomplete Information," Management Science, INFORMS, vol. 47(5), pages 709-715, May.
- Freimer, Michael & Thomas, Douglas & Tyworth, John, 2006. "The value of setup cost reduction and process improvement for the economic production quantity model with defects," European Journal of Operational Research, Elsevier, vol. 173(1), pages 241-251, August.
- Iny Hwang & Suresh Radhakrishnan & Lixin (Nancy) Su, 2006. "Vendor Certification and Appraisal: Implications for Supplier Quality," Management Science, INFORMS, vol. 52(10), pages 1472-1482, October.
- Chen, Chung-Ho & Lai, Min-Tsai, 2007. "Economic manufacturing quantity, optimum process mean, and economic specification limits setting under the rectifying inspection plan," European Journal of Operational Research, Elsevier, vol. 183(1), pages 336-344, November.
- Stanley Baiman & Paul E. Fischer & Madhav V. Rajan, 2001. "Performance Measurement and Design in Supply Chains," Management Science, INFORMS, vol. 47(1), pages 173-188, January.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Dionisia Tzavara and Adrienne Héritier, 2011. "Quality and Environmental Regulation: Verifying Compliance along the Supply Chain," EUI-RSCAS Working Papers 16, European University Institute (EUI), Robert Schuman Centre of Advanced Studies (RSCAS).
- Dionisia Tzavara & Adrienne Héritier, 2011. "Quality and Environmental Regulation: Verifying Compliance along the Supply Chain," RSCAS Working Papers 2011/16, European University Institute.
- Yoo, Seung Ho & Cheong, Taesu, 2018. "Quality improvement incentive strategies in a supply chain," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 114(C), pages 331-342.
- Yang Dong & Kefeng Xu & Yi Xu & Xiang Wan, 2013. "Quality Assurance Contracts in a Multi-Level Supply Chain," Working Papers 0206mss, College of Business, University of Texas at San Antonio.
- Tzavara Dionisia & Heritier Adrienne, 2012. "Quality and Environmental Regulation: Verifying Compliance along the Supply Chain," Business and Politics, De Gruyter, vol. 14(2), pages 1-24, August.
- Murat Erkoc & Haresh Gurnani & Saibal Ray & Mingzhu Jin, 2023. "Quality investment, inspection policy, and pricing decisions in a decentralized supply chain," Production and Operations Management, Production and Operations Management Society, vol. 32(1), pages 207-226, January.
- Ying‐Ju Chen & Mingcherng Deng, 2013. "Supplier certification and quality investment in supply chains," Naval Research Logistics (NRL), John Wiley & Sons, vol. 60(3), pages 175-189, April.
- Aust, Gerhard & Bräuer, Ina & Buscher, Udo, 2014. "A note on “Quality investment and inspection policy in a supplier-manufacturer supply chain”," European Journal of Operational Research, Elsevier, vol. 234(3), pages 910-915.
- Gary H. Chao & Seyed M. R. Iravani & R. Canan Savaskan, 2009. "Quality Improvement Incentives and Product Recall Cost Sharing Contracts," Management Science, INFORMS, vol. 55(7), pages 1122-1138, July.
- Jing Chen & Hang Wei & Lei Xie, 2022. "Mitigating Product Quality Risk under External Financial Pressure: Inspection, Insurance, and Cash/Collateralized Loan," Production and Operations Management, Production and Operations Management Society, vol. 31(1), pages 304-317, January.
- Hong Wan & Xiaowei Xu, 2008. "Technical note: Reexamination of all‐or‐none inspection policies in a supply chain with endogenous product quality," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(3), pages 277-282, April.
- Li Chen & Hau L. Lee, 2017. "Sourcing Under Supplier Responsibility Risk: The Effects of Certification, Audit, and Contingency Payment," Management Science, INFORMS, vol. 63(9), pages 2795-2812, September.
- Yan Dong & Kefeng Xu & Yi Xu & Xiang Wan, 2016. "Quality Management in Multi-Level Supply Chains with Outsourced Manufacturing," Production and Operations Management, Production and Operations Management Society, vol. 25(2), pages 290-305, February.
- Hong Wan & Xiaowei Xu & Tian Ni, 2013. "The incentive effect of acceptance sampling plans in a supply chain with endogenous product quality," Naval Research Logistics (NRL), John Wiley & Sons, vol. 60(2), pages 111-124, March.
- Murat Kaya & Özalp Özer, 2009. "Quality risk in outsourcing: Noncontractible product quality and private quality cost information," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(7), pages 669-685, October.
- Aadhaar Chaturvedi, 2021. "Excessive Competition and Supplier Non‐Performance Risk: Trade‐offs in Reverse Auctions," Production and Operations Management, Production and Operations Management Society, vol. 30(9), pages 3073-3093, September.
- Agrawal, Anupam, 2014. "Managing raw material in supply chains," European Journal of Operational Research, Elsevier, vol. 239(3), pages 685-698.
- Jens Gudmundsson & Jens Leth Hougaard & Chiu Yu Ko, 2022. "Sharing sequentially triggered losses: Automatic conflict resolution through smart contracts," IFRO Working Paper 2020/05, University of Copenhagen, Department of Food and Resource Economics.
- Tapiero, Charles S., 2007. "Consumers risk and quality control in a collaborative supply chain," European Journal of Operational Research, Elsevier, vol. 182(2), pages 683-694, October.
- Chen, Jing & Wei, Hang & Xu, Shujun & Zheng, Chaonan, 2023. "The value of product recall insurance in a price competition with financially constrained suppliers," European Journal of Operational Research, Elsevier, vol. 307(3), pages 1161-1176.
More about this item
Keywords
Inspection Noncooperative game Quality investment Supply chain;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:202:y:2010:i:3:p:717-729. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.