IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v140y2012i2p922-933.html
   My bibliography  Save this article

Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return

Author

Listed:
  • Yoo, Seung Ho
  • Kim, DaeSoo
  • Park, Myung-Sub

Abstract

This study examines an imperfect production and inspection system with customer return and defective disposal. We develop an optimal lot sizing model with production and inspection quality investment, incorporating all the quality costs. We find the optimal lot size, rework frequency, defective proportion, and Type I and Type II inspection error proportions which minimize the total quality cost and maximize the total profit. We further analyze the solutions for no, partial, sequential and joint investment decisions on production and/or inspection processes in terms of quality costs using numerical analyses. The result provides important managerial insights into practice.

Suggested Citation

  • Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2012. "Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return," International Journal of Production Economics, Elsevier, vol. 140(2), pages 922-933.
  • Handle: RePEc:eee:proeco:v:140:y:2012:i:2:p:922-933
    DOI: 10.1016/j.ijpe.2012.07.014
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527312003210
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2012.07.014?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Dobos, Imre & Richter, Knut, 2006. "A production/recycling model with quality consideration," International Journal of Production Economics, Elsevier, vol. 104(2), pages 571-579, December.
    2. Affisco, John F. & Javad Paknejad, M. & Nasri, Farrokh, 2002. "Quality improvement and setup reduction in the joint economic lot size model," European Journal of Operational Research, Elsevier, vol. 142(3), pages 497-508, November.
    3. Salameh, M. K. & Jaber, M. Y., 2000. "Economic production quantity model for items with imperfect quality," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 59-64, March.
    4. Richter, Knut, 1996. "The extended EOQ repair and waste disposal model," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 443-447, August.
    5. Chiu, Singa Wang & Wang, Shan-Ling & Chiu, Yuan-Shyi Peter, 2007. "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns," European Journal of Operational Research, Elsevier, vol. 180(2), pages 664-676, July.
    6. Guu, Sy-Ming & Zhang, Alex X., 2003. "The finite multiple lot sizing problem with interrupted geometric yield and holding costs," European Journal of Operational Research, Elsevier, vol. 145(3), pages 635-644, March.
    7. P K Tripathy & W-M Wee & P R Majhi, 2003. "An EOQ model with process reliability considerations," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(5), pages 549-554, May.
    8. Elhafsi, Mohsen, 2002. "A production planning model for an unreliable production facility: Case of finite horizon and single demand," European Journal of Operational Research, Elsevier, vol. 143(1), pages 94-114, November.
    9. Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2009. "Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return," International Journal of Production Economics, Elsevier, vol. 121(1), pages 255-265, September.
    10. Yeh, Ruey Huei & Chen, Tzu-Hui, 2006. "Optimal lot size and inspection policy for products sold with warranty," European Journal of Operational Research, Elsevier, vol. 174(2), pages 766-776, October.
    11. Grosfeld-Nir, Abraham, 2005. "A two-bottleneck system with binomial yields and rigid demand," European Journal of Operational Research, Elsevier, vol. 165(1), pages 231-250, August.
    12. Candace Arai Yano & Hau L. Lee, 1995. "Lot Sizing with Random Yields: A Review," Operations Research, INFORMS, vol. 43(2), pages 311-334, April.
    13. M A Rahim & M Ben-Daya, 2001. "Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 52(12), pages 1370-1378, December.
    14. Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
    15. Leung, Kit-Nam Francis, 2007. "A generalized geometric-programming solution to "An economic production quantity model with flexibility and reliability considerations"," European Journal of Operational Research, Elsevier, vol. 176(1), pages 240-251, January.
    16. Kim, Jaehoon & Kim, Sangsin, 2015. "2012년 국회법 개정의 효과 연구 [A Study on the Effect of the 2012 National Assembly Act Amendment]," KDI Research Monographs, Korea Development Institute (KDI), volume 127, number v:2015-03(k):y:2015:p:1-1.
    17. Grosfeld-Nir, Abraham & Anily, Shoshana & Ben-Zvi, Tal, 2006. "Lot-sizing two-echelon assembly systems with random yields and rigid demand," European Journal of Operational Research, Elsevier, vol. 173(2), pages 600-616, September.
    18. Cheng, T. C. E., 1989. "An economic production quantity model with flexibility and reliability considerations," European Journal of Operational Research, Elsevier, vol. 39(2), pages 174-179, March.
    19. Hau L. Lee & Meir J. Rosenblatt, 1987. "Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System," Management Science, INFORMS, vol. 33(9), pages 1125-1136, September.
    20. Dobos, Imre & Richter, Knut, 2004. "An extended production/recycling model with stationary demand and return rates," International Journal of Production Economics, Elsevier, vol. 90(3), pages 311-323, August.
    21. Richter, Knut, 1996. "The EOQ repair and waste disposal model with variable setup numbers," European Journal of Operational Research, Elsevier, vol. 95(2), pages 313-324, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ouyang, Liang-Yuh & Chang, Chun-Tao, 2013. "Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging," International Journal of Production Economics, Elsevier, vol. 144(2), pages 610-617.
    2. Sarkar, Biswajit & Saren, Sharmila, 2016. "Product inspection policy for an imperfect production system with inspection errors and warranty cost," European Journal of Operational Research, Elsevier, vol. 248(1), pages 263-271.
    3. Wang, Huan & Wang, Daao & Fang, Zhigeng & Zeng, Xiao-Jun, 2024. "Impacts of inspection errors and warranty costs on a complex product supply chain under different development modes," International Journal of Production Economics, Elsevier, vol. 272(C).
    4. Muhammad Tayyab & Biswajit Sarkar & Bernardo Nugroho Yahya, 2018. "Imperfect Multi-Stage Lean Manufacturing System with Rework under Fuzzy Demand," Mathematics, MDPI, vol. 7(1), pages 1-18, December.
    5. Chen, Tsung-Hui, 2017. "Optimizing pricing, replenishment and rework decision for imperfect and deteriorating items in a manufacturer-retailer channel," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 539-550.
    6. Bimal Kumar Sett & Bikash Koli Dey & Biswajit Sarkar, 2020. "Autonomated Inspection Policy for Smart Factory—An Improved Approach," Mathematics, MDPI, vol. 8(10), pages 1-19, October.
    7. Niknejad, A. & Petrovic, D., 2014. "Optimisation of integrated reverse logistics networks with different product recovery routes," European Journal of Operational Research, Elsevier, vol. 238(1), pages 143-154.
    8. Sarkar, Biswajit & Moon, Ilkyeong, 2014. "Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process," International Journal of Production Economics, Elsevier, vol. 155(C), pages 204-213.
    9. Raden Achmad Chairdino Leuveano & Mohd Nizam Ab Rahman & Wan Mohd Faizal Wan Mahmood & Chairul Saleh, 2019. "Integrated Vendor–Buyer Lot-Sizing Model with Transportation and Quality Improvement Consideration under Just-in-Time Problem," Mathematics, MDPI, vol. 7(10), pages 1-25, October.
    10. Lee, Sunghee & Kim, Daeki, 2014. "An optimal policy for a single-vendor single-buyer integrated production–distribution model with both deteriorating and defective items," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 161-170.
    11. Monami Das Roy & Shib Sankar Sana, 2021. "Inter-dependent lead-time and ordering cost reduction strategy: a supply chain model with quality control, lead-time dependent backorder and price-sensitive stochastic demand," OPSEARCH, Springer;Operational Research Society of India, vol. 58(3), pages 690-710, September.
    12. Izabela Jonek-Kowalska, 2019. "Long-term Analysis of the Effects of Production Management in Coal Mining in Poland," Energies, MDPI, vol. 12(16), pages 1-13, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2009. "Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return," International Journal of Production Economics, Elsevier, vol. 121(1), pages 255-265, September.
    2. Harun Öztürk, 2021. "Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs," Operational Research, Springer, vol. 21(1), pages 167-204, March.
    3. Jaber, Mohamad Y. & El Saadany, Ahmed M.A., 2011. "An economic production and remanufacturing model with learning effects," International Journal of Production Economics, Elsevier, vol. 131(1), pages 115-127, May.
    4. Khan, M. & Jaber, M.Y. & Guiffrida, A.L. & Zolfaghari, S., 2011. "A review of the extensions of a modified EOQ model for imperfect quality items," International Journal of Production Economics, Elsevier, vol. 132(1), pages 1-12, July.
    5. Hsu, Jia-Tzer & Hsu, Lie-Fern, 2013. "An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns," International Journal of Production Economics, Elsevier, vol. 143(1), pages 162-170.
    6. Tien-Yu Lin & Kuo-Lung Hou, 2015. "An imperfect quality economic order quantity with advanced receiving," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 23(2), pages 535-551, July.
    7. Harun Öztürk, 2019. "Modeling an inventory problem with random supply, inspection and machine breakdown," OPSEARCH, Springer;Operational Research Society of India, vol. 56(2), pages 497-527, June.
    8. Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
    9. Jaber, Mohamad Y. & Rosen, Marc A., 2008. "The economic order quantity repair and waste disposal model with entropy cost," European Journal of Operational Research, Elsevier, vol. 188(1), pages 109-120, July.
    10. Ullah, Mehran & Sarkar, Biswajit, 2020. "Recovery-channel selection in a hybrid manufacturing-remanufacturing production model with RFID and product quality," International Journal of Production Economics, Elsevier, vol. 219(C), pages 360-374.
    11. El Saadany, Ahmed M.A. & Jaber, Mohamad Y., 2011. "A production/remanufacture model with returns' subassemblies managed differently," International Journal of Production Economics, Elsevier, vol. 133(1), pages 119-126, September.
    12. Khan, Mehmood & Jaber, Mohamad Y. & Bonney, Maurice, 2011. "An economic order quantity (EOQ) for items with imperfect quality and inspection errors," International Journal of Production Economics, Elsevier, vol. 133(1), pages 113-118, September.
    13. Freimer, Michael & Thomas, Douglas & Tyworth, John, 2006. "The value of setup cost reduction and process improvement for the economic production quantity model with defects," European Journal of Operational Research, Elsevier, vol. 173(1), pages 241-251, August.
    14. Jaber, Mohamad Y. & El Saadany, Ahmed M.A., 2009. "The production, remanufacture and waste disposal model with lost sales," International Journal of Production Economics, Elsevier, vol. 120(1), pages 115-124, July.
    15. M-C Wu & L-C Huang & H-M Hsu & T-S Su, 2011. "Multiple lot-sizing decisions in a two-stage production with an interrupted geometric yield and non-rigid demand," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(6), pages 1075-1084, June.
    16. Lucas Dias Condeixa & Pierry Silva & Diego Moah & Brenda Farias & Adriana Leiras, 2022. "Evaluating cost impacts on reverse logistics using an Economic Order Quantity (EOQ) model with environmental and social considerations," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 30(3), pages 921-940, September.
    17. Lee, Sunghee & Kim, Daeki, 2014. "An optimal policy for a single-vendor single-buyer integrated production–distribution model with both deteriorating and defective items," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 161-170.
    18. Biswajit Sarkar & Mehran Ullah & Seok-Beom Choi, 2019. "Joint Inventory and Pricing Policy for an Online to Offline Closed-Loop Supply Chain Model with Random Defective Rate and Returnable Transport Items," Mathematics, MDPI, vol. 7(6), pages 1-20, June.
    19. El Saadany, Ahmed M.A. & Jaber, Mohamad Y. & Bonney, Maurice, 2013. "How many times to remanufacture?," International Journal of Production Economics, Elsevier, vol. 143(2), pages 598-604.
    20. Bimal Kumar Mawandiya & J. K. Jha & Jitesh J. Thakkar, 2020. "Optimal production-inventory policy for closed-loop supply chain with remanufacturing under random demand and return," Operational Research, Springer, vol. 20(3), pages 1623-1664, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:140:y:2012:i:2:p:922-933. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.