Pushing Quality Improvement Along Supply Chains
Author
Abstract
Suggested Citation
DOI: 10.1287/mnsc.1060.0634
Download full text from publisher
References listed on IDEAS
- Steven Nahmias & Kamran Moinzadeh, 1997. "Lot Sizing with Randomly Graded Yields," Operations Research, INFORMS, vol. 45(6), pages 974-989, December.
- Evan L. Porteus, 1990. "Note---The Impact of Inspection Delay on Process and Inspection Lot Sizing," Management Science, INFORMS, vol. 36(8), pages 999-1007, August.
- Hau L. Lee & Meir J. Rosenblatt, 1987. "Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System," Management Science, INFORMS, vol. 33(9), pages 1125-1136, September.
- Stanley Baiman & Paul E. Fischer & Madhav V. Rajan, 2000. "Information, Contracting, and Quality Costs," Management Science, INFORMS, vol. 46(6), pages 776-789, June.
- Wei Shi Lim, 2001. "Producer-Supplier Contracts with Incomplete Information," Management Science, INFORMS, vol. 47(5), pages 709-715, May.
- Srinivas Bollapragada & Thomas E. Morton, 1999. "Myopic Heuristics for the Random Yield Problem," Operations Research, INFORMS, vol. 47(5), pages 713-722, October.
- Yunzeng Wang & Yigal Gerchak, 1996. "Periodic Review Production Models with Variable Capacity, Random Yield, and Uncertain Demand," Management Science, INFORMS, vol. 42(1), pages 130-137, January.
- Diane J. Reyniers & Charles S. Tapiero, 1995. "The Delivery and Control of Quality in Supplier-Producer Contracts," Management Science, INFORMS, vol. 41(10), pages 1581-1589, October.
- George Tagaras & Hau L. Lee, 1996. "Economic Models for Vendor Evaluation with Quality Cost Analysis," Management Science, INFORMS, vol. 42(11), pages 1531-1543, November.
- P. Nandakumar & S. M. Datar & R. Akella, 1993. "Models for Measuring and Accounting for Cost of Conformance Quality," Management Science, INFORMS, vol. 39(1), pages 1-16, January.
- Hau L. Lee, 1992. "Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework," Management Science, INFORMS, vol. 38(9), pages 1314-1328, September.
- Candace Arai Yano & Hau L. Lee, 1995. "Lot Sizing with Random Yields: A Review," Operations Research, INFORMS, vol. 43(2), pages 311-334, April.
- Kumar Rajaram & Uday S. Karmarkar, 2002. "Product Cycling With Uncertain Yields: Analysis and Application to the Process Industry," Operations Research, INFORMS, vol. 50(4), pages 680-691, August.
- Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
- Abraham Grosfeld-Nir & Yigal Gerchak & Qi-Ming He, 2000. "Manufacturing to Order with Random Yield and Costly Inspection," Operations Research, INFORMS, vol. 48(5), pages 761-767, October.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Yang Dong & Kefeng Xu & Sining Song, 2014. "Contracting for Quality in a Multiple-Level Global Supply Chain," Working Papers 0205mss, College of Business, University of Texas at San Antonio.
- T W Sloan, 2004. "A periodic review production and maintenance model with random demand, deteriorating equipment, and binomial yield," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(6), pages 647-656, June.
- Wright, CM & Mehrez, A, 1998. "An Overview of Representative Research of the Relationships Between Quality and Inventory," Omega, Elsevier, vol. 26(1), pages 29-47, February.
- Li, Dong & Nagurney, Anna, 2015. "A general multitiered supply chain network model of quality competition with suppliers," International Journal of Production Economics, Elsevier, vol. 170(PA), pages 336-356.
- Lee, Chang Hwan & Rhee, Byong-Duk & Cheng, T.C.E., 2013. "Quality uncertainty and quality-compensation contract for supply chain coordination," European Journal of Operational Research, Elsevier, vol. 228(3), pages 582-591.
- Qing Li & Shaohui Zheng, 2006. "Joint Inventory Replenishment and Pricing Control for Systems with Uncertain Yield and Demand," Operations Research, INFORMS, vol. 54(4), pages 696-705, August.
- Shoshana Anily & Avraham Beja & Amit Mendel, 2002. "Optimal Lot Sizes with Geometric Production Yield and Rigid Demand," Operations Research, INFORMS, vol. 50(3), pages 424-432, June.
- Murat Kaya & Özalp Özer, 2009. "Quality risk in outsourcing: Noncontractible product quality and private quality cost information," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(7), pages 669-685, October.
- Mart, Turgut & Duran, Serhan & Bakal, İsmail Serdar, 2013. "Tactical inventory and backorder decisions for systems with predictable production yield," International Journal of Production Economics, Elsevier, vol. 143(2), pages 294-303.
- Xu, He, 2010. "Managing production and procurement through option contracts in supply chains with random yield," International Journal of Production Economics, Elsevier, vol. 126(2), pages 306-313, August.
- Gurnani, Haresh & Gerchak, Yigal, 2007. "Coordination in decentralized assembly systems with uncertain component yields," European Journal of Operational Research, Elsevier, vol. 176(3), pages 1559-1576, February.
- Shoshana Anily & Abraham Grosfeld-Nir, 2006. "An Optimal Lot-Sizing and Offline Inspection Policy in the Case of Nonrigid Demand," Operations Research, INFORMS, vol. 54(2), pages 311-323, April.
- Diwakar Gupta & William L. Cooper, 2005. "Stochastic Comparisons in Production Yield Management," Operations Research, INFORMS, vol. 53(2), pages 377-384, April.
- Stephen M. Gilbert & Hena M Bar, 1999. "The value of observing the condition of a deteriorating machine," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(7), pages 790-808, October.
- Peter Berling & Danja R. Sonntag, 2022. "Inventory control in production–inventory systems with random yield and rework: The unit‐tracking approach," Production and Operations Management, Production and Operations Management Society, vol. 31(6), pages 2628-2645, June.
- Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.
- Kulkarni, Shailesh S., 2008. "Loss-based quality costs and inventory planning: General models and insights," European Journal of Operational Research, Elsevier, vol. 188(2), pages 428-449, July.
- Abraham Grosfeld‐Nir & Eyal Cohen & Yigal Gerchak, 2007. "Production to order and off‐line inspection when the production process is partially observable," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(8), pages 845-858, December.
- Kutzner, Sarah C. & Kiesmüller, Gudrun P., 2013. "Optimal control of an inventory-production system with state-dependent random yield," European Journal of Operational Research, Elsevier, vol. 227(3), pages 444-452.
- Saurabh Bansal & Mahesh Nagarajan, 2017. "Product Portfolio Management with Production Flexibility in Agribusiness," Operations Research, INFORMS, vol. 65(4), pages 914-930, August.
More about this item
Keywords
quality cost; supply chain; quality improvement;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:53:y:2007:i:3:p:421-436. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.