IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v169y2006i1p65-80.html
   My bibliography  Save this article

Fuzzy mixture inventory model involving fuzzy random variable lead time demand and fuzzy total demand

Author

Listed:
  • Chang, Hung-Chi
  • Yao, Jing-Shing
  • Ouyang, Liang-Yuh

Abstract

No abstract is available for this item.

Suggested Citation

  • Chang, Hung-Chi & Yao, Jing-Shing & Ouyang, Liang-Yuh, 2006. "Fuzzy mixture inventory model involving fuzzy random variable lead time demand and fuzzy total demand," European Journal of Operational Research, Elsevier, vol. 169(1), pages 65-80, February.
  • Handle: RePEc:eee:ejores:v:169:y:2006:i:1:p:65-80
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(04)00387-X
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ouyang, Liang-Yuh & Chang, Hung-Chi, 2002. "A minimax distribution free procedure for mixed inventory models involving variable lead time with fuzzy lost sales," International Journal of Production Economics, Elsevier, vol. 76(1), pages 1-12, March.
    2. Chang, San-Chyi & Yao, Jing-Shing & Lee, Huey-Ming, 1998. "Economic reorder point for fuzzy backorder quantity," European Journal of Operational Research, Elsevier, vol. 109(1), pages 183-202, August.
    3. Vujosevic, Mirko & Petrovic, Dobrila & Petrovic, Radivoj, 1996. "EOQ formula when inventory cost is fuzzy," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 499-504, August.
    4. Yao, Jing-Shing & Su, Jin-Shieh, 2000. "Fuzzy inventory with backorder for fuzzy total demand based on interval-valued fuzzy set," European Journal of Operational Research, Elsevier, vol. 124(2), pages 390-408, July.
    5. Ishii, Hiroaki & Konno, Tutomu, 1998. "A stochastic inventory problem with fuzzy shortage cost," European Journal of Operational Research, Elsevier, vol. 106(1), pages 90-94, April.
    6. Lee, Huey-Ming & Yao, Jing-Shing, 1998. "Economic production quantity for fuzzy demand quantity, and fuzzy production quantity," European Journal of Operational Research, Elsevier, vol. 109(1), pages 203-211, August.
    7. Roy, T.K. & Maiti, M., 1997. "A fuzzy EOQ model with demand-dependent unit cost under limited storage capacity," European Journal of Operational Research, Elsevier, vol. 99(2), pages 425-432, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Javad Sadeghi & Seyed Taghi Akhavan Niaki & Mohammad Reza Malekian & Saeid Sadeghi, 2016. "Optimising multi-item economic production quantity model with trapezoidal fuzzy demand and backordering: two tuned meta-heuristics," European Journal of Industrial Engineering, Inderscience Enterprises Ltd, vol. 10(2), pages 170-195.
    2. Oshmita Dey, 2019. "A fuzzy random integrated inventory model with imperfect production under optimal vendor investment," Operational Research, Springer, vol. 19(1), pages 101-115, March.
    3. Muhammad Tayyab & Biswajit Sarkar & Bernardo Nugroho Yahya, 2018. "Imperfect Multi-Stage Lean Manufacturing System with Rework under Fuzzy Demand," Mathematics, MDPI, vol. 7(1), pages 1-18, December.
    4. Li, Yina & Xu, Xuejun & Zhao, Xiande & Yeung, Jeff Hoi Yan & Ye, Fei, 2012. "Supply chain coordination with controllable lead time and asymmetric information," European Journal of Operational Research, Elsevier, vol. 217(1), pages 108-119.
    5. Neeraj Kumar & Sanjey Kumar, 2017. "An inventory model for deteriorating items with partial backlogging using linear demand in fuzzy environment," Cogent Business & Management, Taylor & Francis Journals, vol. 4(1), pages 1307687-130, January.
    6. Dey, Oshmita & Chakraborty, Debjani, 2011. "A fuzzy random continuous review inventory system," International Journal of Production Economics, Elsevier, vol. 132(1), pages 101-106, July.
    7. Ravi Shankar Kumar & M. K. Tiwari & A. Goswami, 2016. "Two-echelon fuzzy stochastic supply chain for the manufacturer–buyer integrated production–inventory system," Journal of Intelligent Manufacturing, Springer, vol. 27(4), pages 875-888, August.
    8. Dey, Oshmita & Chakraborty, Debjani, 2009. "Fuzzy periodic review system with fuzzy random variable demand," European Journal of Operational Research, Elsevier, vol. 198(1), pages 113-120, October.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Wu, Kweimei & Yao, Jing-Shing, 2003. "Fuzzy inventory with backorder for fuzzy order quantity and fuzzy shortage quantity," European Journal of Operational Research, Elsevier, vol. 150(2), pages 320-352, October.
    2. Yao, Jing-Shing & Chiang, Jershan, 2003. "Inventory without backorder with fuzzy total cost and fuzzy storing cost defuzzified by centroid and signed distance," European Journal of Operational Research, Elsevier, vol. 148(2), pages 401-409, July.
    3. Chang, Ping-Teng & Yao, Ming-Jong & Huang, Shih-Fen & Chen, Chia-Tsung, 2006. "A genetic algorithm for solving a fuzzy economic lot-size scheduling problem," International Journal of Production Economics, Elsevier, vol. 102(2), pages 265-288, August.
    4. Chen, Shih-Pin & Ho, Yann-Horng, 2011. "Analysis of the newsboy problem with fuzzy demands and incremental discounts," International Journal of Production Economics, Elsevier, vol. 129(1), pages 169-177, January.
    5. Maiti, Manas Kumar, 2008. "Fuzzy inventory model with two warehouses under possibility measure on fuzzy goal," European Journal of Operational Research, Elsevier, vol. 188(3), pages 746-774, August.
    6. Björk, Kaj-Mikael, 2012. "A multi-item fuzzy economic production quantity problem with a finite production rate," International Journal of Production Economics, Elsevier, vol. 135(2), pages 702-707.
    7. Vijayan, T. & Kumaran, M., 2008. "Inventory models with a mixture of backorders and lost sales under fuzzy cost," European Journal of Operational Research, Elsevier, vol. 189(1), pages 105-119, August.
    8. Chakrabortty, Susovan & Pal, Madhumangal & Nayak, Prasun Kumar, 2013. "Intuitionistic fuzzy optimization technique for Pareto optimal solution of manufacturing inventory models with shortages," European Journal of Operational Research, Elsevier, vol. 228(2), pages 381-387.
    9. Yao, Jing-Shing & Ouyang, Liang-Yuh & Chang, Hung-Chi, 2003. "Models for a fuzzy inventory of two replaceable merchandises without backorder based on the signed distance of fuzzy sets," European Journal of Operational Research, Elsevier, vol. 150(3), pages 601-616, November.
    10. Rong, M. & Mahapatra, N.K. & Maiti, M., 2008. "A two warehouse inventory model for a deteriorating item with partially/fully backlogged shortage and fuzzy lead time," European Journal of Operational Research, Elsevier, vol. 189(1), pages 59-75, August.
    11. Henry Inegbedion* & Sunday Eze & Abiola Asaleye & Adedoyin Lawal, 2019. "Inventory Management and Organisational Efficiency," The Journal of Social Sciences Research, Academic Research Publishing Group, vol. 5(3), pages 756-763, 03-2019.
    12. Mandeep Mittal & Mahesh Kumar Jayaswal & Vijay Kumar, 2022. "Effect of learning on the optimal ordering policy of inventory model for deteriorating items with shortages and trade-credit financing," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(2), pages 914-924, June.
    13. Ouyang, Liang-Yuh & Chang, Hung-Chi, 2002. "A minimax distribution free procedure for mixed inventory models involving variable lead time with fuzzy lost sales," International Journal of Production Economics, Elsevier, vol. 76(1), pages 1-12, March.
    14. YazgI Tütüncü, G. & Aköz, Onur & ApaydIn, Aysen & Petrovic, Dobrila, 2008. "Continuous review inventory control in the presence of fuzzy costs," International Journal of Production Economics, Elsevier, vol. 113(2), pages 775-784, June.
    15. Neeraj Kumar & Sanjey Kumar, 2017. "An inventory model for deteriorating items with partial backlogging using linear demand in fuzzy environment," Cogent Business & Management, Taylor & Francis Journals, vol. 4(1), pages 1307687-130, January.
    16. Yao, Jing-Shing & Su, Jin-Shieh, 2000. "Fuzzy inventory with backorder for fuzzy total demand based on interval-valued fuzzy set," European Journal of Operational Research, Elsevier, vol. 124(2), pages 390-408, July.
    17. Ghatee, Mehdi & Hashemi, S. Mehdi, 2009. "Traffic assignment model with fuzzy level of travel demand: An efficient algorithm based on quasi-Logit formulas," European Journal of Operational Research, Elsevier, vol. 194(2), pages 432-451, April.
    18. P. Majumder & U. K. Bera & M. Maiti, 2020. "An EPQ model of substitutable products under trade credit policy with stock dependent and random substitution," OPSEARCH, Springer;Operational Research Society of India, vol. 57(4), pages 1205-1243, December.
    19. João M. C. Sousa & Rodrigo Luís & Rui Mirra Santos & Luís Mendonça & Susana M. Vieira, 2024. "Fuzzy Multi-Item Newsvendor Problem: An Application to Inventory Management," Mathematics, MDPI, vol. 12(11), pages 1-18, May.
    20. Ryu, Kwangyeol & Yücesan, Enver, 2010. "A fuzzy newsvendor approach to supply chain coordination," European Journal of Operational Research, Elsevier, vol. 200(2), pages 421-438, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:169:y:2006:i:1:p:65-80. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.