IDEAS home Printed from https://ideas.repec.org/a/spr/joinma/v27y2016i4d10.1007_s10845-014-0921-8.html
   My bibliography  Save this article

Two-echelon fuzzy stochastic supply chain for the manufacturer–buyer integrated production–inventory system

Author

Listed:
  • Ravi Shankar Kumar

    (Indian Institute of Technology)

  • M. K. Tiwari

    (Indian Institute of Technology)

  • A. Goswami

    (Indian Institute of Technology)

Abstract

This paper deals with two-echelon integrated procurement production model for the manufacturer and the buyer integrated inventory system. The manufacturer procures raw material from outside suppliers (not a part of supply chain) then proceed to convert it as finished product, and finally delivers to the buyer, who faces imprecise and uncertain, called fuzzy random demand of customers. The manufacturer and the buyer work under joint channel, in which a centralized decision maker makes all decisions to optimize the joint total relevant cost (JTRC) of entire supply chain. In this account, in one production cycle of the manufacturer we determine an optimal multi-ordering policy for the buyer. To be part of this, we first derive the JTRC in stochastic framework, and then extend it in fuzzy stochastic environment. In order to scalarize the fuzzy stochastic JTRC, we use an evaluation method wherein randomness is estimated by probabilistic expectation and fuzziness is estimated by possibilistic mean based on possibility evaluation measure. To derive the optimal policies for both parties, an algorithm is proposed. A numerical illustration addresses the situations of paddy procurement, conversion to rice and fulfillment of uncertain demand of rice. Furthermore, sensitivity of parameters is examined to illustrate the model and algorithm.

Suggested Citation

  • Ravi Shankar Kumar & M. K. Tiwari & A. Goswami, 2016. "Two-echelon fuzzy stochastic supply chain for the manufacturer–buyer integrated production–inventory system," Journal of Intelligent Manufacturing, Springer, vol. 27(4), pages 875-888, August.
  • Handle: RePEc:spr:joinma:v:27:y:2016:i:4:d:10.1007_s10845-014-0921-8
    DOI: 10.1007/s10845-014-0921-8
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10845-014-0921-8
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10845-014-0921-8?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ben-Daya, Mohammed & As’ad, Rami & Seliaman, Mohammed, 2013. "An integrated production inventory model with raw material replenishment considerations in a three layer supply chain," International Journal of Production Economics, Elsevier, vol. 143(1), pages 53-61.
    2. Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2007. "An integrated vendor-buyer inventory model with quality improvement and lead time reduction," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 349-358, July.
    3. Shapiro, Arnold F., 2009. "Fuzzy random variables," Insurance: Mathematics and Economics, Elsevier, vol. 44(2), pages 307-314, April.
    4. Dey, Oshmita & Chakraborty, Debjani, 2011. "A fuzzy random continuous review inventory system," International Journal of Production Economics, Elsevier, vol. 132(1), pages 101-106, July.
    5. Lokesh Nagar & Pankaj Dutta & Karuna Jain, 2014. "An integrated supply chain model for new products with imprecise production and supply under scenario dependent fuzzy random demand," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(5), pages 873-887, May.
    6. Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2004. "Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time," International Journal of Production Economics, Elsevier, vol. 92(3), pages 255-266, December.
    7. Birendra K. Mishra & Srinivasan Raghunathan, 2004. "Retailer- vs. Vendor-Managed Inventory and Brand Competition," Management Science, INFORMS, vol. 50(4), pages 445-457, April.
    8. Chang, Hung-Chi & Yao, Jing-Shing & Ouyang, Liang-Yuh, 2006. "Fuzzy mixture inventory model involving fuzzy random variable lead time demand and fuzzy total demand," European Journal of Operational Research, Elsevier, vol. 169(1), pages 65-80, February.
    9. Editors, 2014. "International Journal of Systems Science," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 1-1, December.
    10. Dey, Oshmita & Chakraborty, Debjani, 2009. "Fuzzy periodic review system with fuzzy random variable demand," European Journal of Operational Research, Elsevier, vol. 198(1), pages 113-120, October.
    11. Yu, Yugang & Wang, Zheng & Liang, Liang, 2012. "A vendor managed inventory supply chain with deteriorating raw materials and products," International Journal of Production Economics, Elsevier, vol. 136(2), pages 266-274.
    12. Lee, Wenyih, 2005. "A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering," Omega, Elsevier, vol. 33(2), pages 163-174, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Utama, Dana Marsetiya & Santoso, Imam & Hendrawan, Yusuf & Dania, Wike Agustin Prima, 2022. "Integrated procurement-production inventory model in supply chain: A systematic review," Operations Research Perspectives, Elsevier, vol. 9(C).
    2. Bikash Koli Dey & Hyesung Seok, 2024. "Intelligent inventory management with autonomation and service strategy," Journal of Intelligent Manufacturing, Springer, vol. 35(1), pages 307-330, January.
    3. Anderson Rogério Faia Pinto & Marcelo Seido Nagano, 2020. "Genetic algorithms applied to integration and optimization of billing and picking processes," Journal of Intelligent Manufacturing, Springer, vol. 31(3), pages 641-659, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Oshmita Dey, 2019. "A fuzzy random integrated inventory model with imperfect production under optimal vendor investment," Operational Research, Springer, vol. 19(1), pages 101-115, March.
    2. Li, Yina & Xu, Xuejun & Zhao, Xiande & Yeung, Jeff Hoi Yan & Ye, Fei, 2012. "Supply chain coordination with controllable lead time and asymmetric information," European Journal of Operational Research, Elsevier, vol. 217(1), pages 108-119.
    3. Utama, Dana Marsetiya & Santoso, Imam & Hendrawan, Yusuf & Dania, Wike Agustin Prima, 2022. "Integrated procurement-production inventory model in supply chain: A systematic review," Operations Research Perspectives, Elsevier, vol. 9(C).
    4. Rad, Reza Hosseini & Razmi, Jafar & Sangari, Mohamad Sadegh & Ebrahimi, Zahra Fallah, 2014. "Optimizing an integrated vendor-managed inventory system for a single-vendor two-buyer supply chain with determining weighting factor for vendor׳s ordering cost," International Journal of Production Economics, Elsevier, vol. 153(C), pages 295-308.
    5. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    6. Sajadieh, Mohsen S. & Fallahnezhad, Mohammad Saber & Khosravi, Maryam, 2013. "A joint optimal policy for a multiple-suppliers multiple-manufacturers multiple-retailers system," International Journal of Production Economics, Elsevier, vol. 146(2), pages 738-744.
    7. Taleizadeh, Ata Allah & Shokr, Iman & Konstantaras, Ioannis & VafaeiNejad, Mahyar, 2020. "Stock replenishment policies for a vendor-managed inventory in a retailing system," Journal of Retailing and Consumer Services, Elsevier, vol. 55(C).
    8. Dey, Oshmita & Chakraborty, Debjani, 2011. "A fuzzy random continuous review inventory system," International Journal of Production Economics, Elsevier, vol. 132(1), pages 101-106, July.
    9. Sainathan, Arvind & Groenevelt, Harry, 2019. "Vendor managed inventory contracts – coordinating the supply chain while looking from the vendor’s perspective," European Journal of Operational Research, Elsevier, vol. 272(1), pages 249-260.
    10. Anuraag Gutgutia & J. K. Jha, 2018. "A closed-form solution for the distribution free continuous review integrated inventory model," Operational Research, Springer, vol. 18(1), pages 159-186, April.
    11. S. Sarkar & B. C. Giri, 2020. "A vendor–buyer integrated inventory system with variable lead time and uncertain market demand," Operational Research, Springer, vol. 20(1), pages 491-515, March.
    12. M. Ganesh Kumar & R. Uthayakumar, 2017. "An integrated single vendor–buyer inventory model for imperfect production process with stochastic demand in controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1041-1054, November.
    13. S. M. Shahidul Islam & Mohammad Abdul Hoque, 2017. "A joint economic lot size model for a supplier-manufacturer-retailers supply chain of an agricultural product," OPSEARCH, Springer;Operational Research Society of India, vol. 54(4), pages 868-885, December.
    14. Islam, S.M. Shahidul & Hoque, Md. Abdul & Hamzah, Norhayati, 2017. "Single-supplier single-manufacturer multi-retailer consignment policy for retailers’ generalized demand distributions," International Journal of Production Economics, Elsevier, vol. 184(C), pages 157-167.
    15. Ben-Daya, M. & Darwish, M. & Ertogral, K., 2008. "The joint economic lot sizing problem: Review and extensions," European Journal of Operational Research, Elsevier, vol. 185(2), pages 726-742, March.
    16. Ik Sun Lee, 2016. "Production and shipment policy under dynamic demand in the supply chain environments," International Journal of Applied Management Science, Inderscience Enterprises Ltd, vol. 8(1), pages 1-19.
    17. M. Vijayashree & R. Uthayakumar, 2016. "Two-echelon supply chain inventory model with controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 7(1), pages 112-125, December.
    18. K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
    19. Sumon Sarkar & Sunil Tiwari & B. C. Giri, 2022. "Impact of uncertain demand and lead-time reduction on two-echelon supply chain," Annals of Operations Research, Springer, vol. 315(2), pages 2027-2055, August.
    20. Z X Chen & B R Sarker, 2010. "Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(11), pages 1654-1666, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:joinma:v:27:y:2016:i:4:d:10.1007_s10845-014-0921-8. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.