Fuzzy inventory with backorder for fuzzy total demand based on interval-valued fuzzy set
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Chang, San-Chyi & Yao, Jing-Shing & Lee, Huey-Ming, 1998. "Economic reorder point for fuzzy backorder quantity," European Journal of Operational Research, Elsevier, vol. 109(1), pages 183-202, August.
- Lee, Huey-Ming & Yao, Jing-Shing, 1998. "Economic production quantity for fuzzy demand quantity, and fuzzy production quantity," European Journal of Operational Research, Elsevier, vol. 109(1), pages 203-211, August.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Yao, Jing-Shing & Chiang, Jershan, 2003. "Inventory without backorder with fuzzy total cost and fuzzy storing cost defuzzified by centroid and signed distance," European Journal of Operational Research, Elsevier, vol. 148(2), pages 401-409, July.
- Vijayan, T. & Kumaran, M., 2008. "Inventory models with a mixture of backorders and lost sales under fuzzy cost," European Journal of Operational Research, Elsevier, vol. 189(1), pages 105-119, August.
- Maiti, Manas Kumar, 2008. "Fuzzy inventory model with two warehouses under possibility measure on fuzzy goal," European Journal of Operational Research, Elsevier, vol. 188(3), pages 746-774, August.
- Chang, Hung-Chi & Yao, Jing-Shing & Ouyang, Liang-Yuh, 2006. "Fuzzy mixture inventory model involving fuzzy random variable lead time demand and fuzzy total demand," European Journal of Operational Research, Elsevier, vol. 169(1), pages 65-80, February.
- Yoshida, Yuji, 2003. "The valuation of European options in uncertain environment," European Journal of Operational Research, Elsevier, vol. 145(1), pages 221-229, February.
- YazgI Tütüncü, G. & Aköz, Onur & ApaydIn, Aysen & Petrovic, Dobrila, 2008. "Continuous review inventory control in the presence of fuzzy costs," International Journal of Production Economics, Elsevier, vol. 113(2), pages 775-784, June.
- Wu, Kweimei & Yao, Jing-Shing, 2003. "Fuzzy inventory with backorder for fuzzy order quantity and fuzzy shortage quantity," European Journal of Operational Research, Elsevier, vol. 150(2), pages 320-352, October.
- Chang, Ping-Teng & Yao, Ming-Jong & Huang, Shih-Fen & Chen, Chia-Tsung, 2006. "A genetic algorithm for solving a fuzzy economic lot-size scheduling problem," International Journal of Production Economics, Elsevier, vol. 102(2), pages 265-288, August.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Rong, M. & Mahapatra, N.K. & Maiti, M., 2008. "A two warehouse inventory model for a deteriorating item with partially/fully backlogged shortage and fuzzy lead time," European Journal of Operational Research, Elsevier, vol. 189(1), pages 59-75, August.
- Yao, Jing-Shing & Chiang, Jershan, 2003. "Inventory without backorder with fuzzy total cost and fuzzy storing cost defuzzified by centroid and signed distance," European Journal of Operational Research, Elsevier, vol. 148(2), pages 401-409, July.
- Björk, Kaj-Mikael, 2012. "A multi-item fuzzy economic production quantity problem with a finite production rate," International Journal of Production Economics, Elsevier, vol. 135(2), pages 702-707.
- Mandeep Mittal & Mahesh Kumar Jayaswal & Vijay Kumar, 2022. "Effect of learning on the optimal ordering policy of inventory model for deteriorating items with shortages and trade-credit financing," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(2), pages 914-924, June.
- Chang, Hung-Chi & Yao, Jing-Shing & Ouyang, Liang-Yuh, 2006. "Fuzzy mixture inventory model involving fuzzy random variable lead time demand and fuzzy total demand," European Journal of Operational Research, Elsevier, vol. 169(1), pages 65-80, February.
- Chen, Shih-Pin & Ho, Yann-Horng, 2011. "Analysis of the newsboy problem with fuzzy demands and incremental discounts," International Journal of Production Economics, Elsevier, vol. 129(1), pages 169-177, January.
- Wu, Kweimei & Yao, Jing-Shing, 2003. "Fuzzy inventory with backorder for fuzzy order quantity and fuzzy shortage quantity," European Journal of Operational Research, Elsevier, vol. 150(2), pages 320-352, October.
- Maiti, Manas Kumar, 2008. "Fuzzy inventory model with two warehouses under possibility measure on fuzzy goal," European Journal of Operational Research, Elsevier, vol. 188(3), pages 746-774, August.
- Xie, Ying & Petrovic, Dobrila & Burnham, Keith, 2006. "A heuristic procedure for the two-level control of serial supply chains under fuzzy customer demand," International Journal of Production Economics, Elsevier, vol. 102(1), pages 37-50, July.
- Javad Sadeghi & Seyed Taghi Akhavan Niaki & Mohammad Reza Malekian & Saeid Sadeghi, 2016. "Optimising multi-item economic production quantity model with trapezoidal fuzzy demand and backordering: two tuned meta-heuristics," European Journal of Industrial Engineering, Inderscience Enterprises Ltd, vol. 10(2), pages 170-195.
- Chang, Ping-Teng & Yao, Ming-Jong & Huang, Shih-Fen & Chen, Chia-Tsung, 2006. "A genetic algorithm for solving a fuzzy economic lot-size scheduling problem," International Journal of Production Economics, Elsevier, vol. 102(2), pages 265-288, August.
- Chen, Shan Huo & Chang, Shu Man, 2008. "Optimization of fuzzy production inventory model with unrepairable defective products," International Journal of Production Economics, Elsevier, vol. 113(2), pages 887-894, June.
- Ouyang, Liang-Yuh & Chang, Hung-Chi, 2002. "A minimax distribution free procedure for mixed inventory models involving variable lead time with fuzzy lost sales," International Journal of Production Economics, Elsevier, vol. 76(1), pages 1-12, March.
- Neeraj Kumar & Sanjey Kumar, 2017. "An inventory model for deteriorating items with partial backlogging using linear demand in fuzzy environment," Cogent Business & Management, Taylor & Francis Journals, vol. 4(1), pages 1307687-130, January.
- R. Patro & Mitali M. Nayak & M. Acharya, 2019. "An EOQ model for fuzzy defective rate with allowable proportionate discount," OPSEARCH, Springer;Operational Research Society of India, vol. 56(1), pages 191-215, March.
- Lidia Vesa & Marcel Ioan Boloş & Claudia Diana Sabău-Popa, 2021. "Inventory Decision In Vuca World Using Economic Logic Quantity," Annals of Faculty of Economics, University of Oradea, Faculty of Economics, vol. 1(1), pages 251-267, July.
- Amalesh Kumar Manna & Leopoldo Eduardo Cárdenas-Barrón & Jayanta Kumar Dey & Shyamal Kumar Mondal & Ali Akbar Shaikh & Armando Céspedes-Mota & Gerardo Treviño-Garza, 2022. "A Fuzzy Imperfect Production Inventory Model Based on Fuzzy Differential and Fuzzy Integral Method," JRFM, MDPI, vol. 15(6), pages 1-19, May.
- Nima Kazemi & Salwa Hanim Abdul-Rashid & Ehsan Shekarian & Eleonora Bottani & Roberto Montanari, 2016. "A fuzzy lot-sizing problem with two-stage composite human learning," International Journal of Production Research, Taylor & Francis Journals, vol. 54(16), pages 5010-5025, August.
- Lee, Huey-Ming & Yao, Jing-Shing, 1998. "Economic production quantity for fuzzy demand quantity, and fuzzy production quantity," European Journal of Operational Research, Elsevier, vol. 109(1), pages 203-211, August.
- Ghatee, Mehdi & Hashemi, S. Mehdi, 2009. "Traffic assignment model with fuzzy level of travel demand: An efficient algorithm based on quasi-Logit formulas," European Journal of Operational Research, Elsevier, vol. 194(2), pages 432-451, April.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:124:y:2000:i:2:p:390-408. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.