IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v153y2004i3p534-543.html
   My bibliography  Save this article

Minimizing the makespan for the flow shop scheduling problem with availability constraints

Author

Listed:
  • Aggoune, Riad

Abstract

No abstract is available for this item.

Suggested Citation

  • Aggoune, Riad, 2004. "Minimizing the makespan for the flow shop scheduling problem with availability constraints," European Journal of Operational Research, Elsevier, vol. 153(3), pages 534-543, March.
  • Handle: RePEc:eee:ejores:v:153:y:2004:i:3:p:534-543
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(03)00261-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Herbert G. Campbell & Richard A. Dudek & Milton L. Smith, 1970. "A Heuristic Algorithm for the n Job, m Machine Sequencing Problem," Management Science, INFORMS, vol. 16(10), pages 630-637, June.
    2. Lee, Chung-Yee, 1999. "Two-machine flowshop scheduling with availability constraints," European Journal of Operational Research, Elsevier, vol. 114(2), pages 420-429, April.
    3. Schmidt, Gunter, 2000. "Scheduling with limited machine availability," European Journal of Operational Research, Elsevier, vol. 121(1), pages 1-15, February.
    4. Blazewicz, Jacek & Breit, Joachim & Formanowicz, Piotr & Kubiak, Wieslaw & Schmidt, Günter, 2001. "Heuristic algorithms for the two-machine flowshop with limited machine availability," Omega, Elsevier, vol. 29(6), pages 599-608, December.
    5. Kubiak, Wieslaw & Blazewicz, Jacek & Formanowicz, Piotr & Breit, Joachim & Schmidt, Gunter, 2002. "Two-machine flow shops with limited machine availability," European Journal of Operational Research, Elsevier, vol. 136(3), pages 528-540, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Tamssaouet, Karim & Dauzère-Pérès, Stéphane & Knopp, Sebastian & Bitar, Abdoul & Yugma, Claude, 2022. "Multiobjective optimization for complex flexible job-shop scheduling problems," European Journal of Operational Research, Elsevier, vol. 296(1), pages 87-100.
    2. Kacem, Imed & Chu, Chengbin, 2008. "Efficient branch-and-bound algorithm for minimizing the weighted sum of completion times on a single machine with one availability constraint," International Journal of Production Economics, Elsevier, vol. 112(1), pages 138-150, March.
    3. Seyed Habib A. Rahmati & Abbas Ahmadi & Kannan Govindan, 2018. "A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach," Annals of Operations Research, Springer, vol. 269(1), pages 583-621, October.
    4. Fatima Benbouzid-Si Tayeb & Karima Benatchba & Abd-Essalam Messiaid, 2018. "Game theory-based integration of scheduling with flexible and periodic maintenance planning in the permutation flowshop sequencing problem," Operational Research, Springer, vol. 18(1), pages 221-255, April.
    5. Wahiba Jomaa & Mansour Eddaly & Bassem Jarboui, 2021. "Variable neighborhood search algorithms for the permutation flowshop scheduling problem with the preventive maintenance," Operational Research, Springer, vol. 21(4), pages 2525-2542, December.
    6. Do, Phuc & Vu, Hai Canh & Barros, Anne & Bérenguer, Christophe, 2015. "Maintenance grouping for multi-component systems with availability constraints and limited maintenance teams," Reliability Engineering and System Safety, Elsevier, vol. 142(C), pages 56-67.
    7. Boccia, Maurizio & Masone, Adriano & Sterle, Claudio & Murino, Teresa, 2023. "The parallel AGV scheduling problem with battery constraints: A new formulation and a matheuristic approach," European Journal of Operational Research, Elsevier, vol. 307(2), pages 590-603.
    8. Weiwei Cui & Biao Lu, 2020. "A Bi-Objective Approach to Minimize Makespan and Energy Consumption in Flow Shops with Peak Demand Constraint," Sustainability, MDPI, vol. 12(10), pages 1-22, May.
    9. Rossit, Daniel Alejandro & Tohmé, Fernando & Frutos, Mariano, 2018. "The Non-Permutation Flow-Shop scheduling problem: A literature review," Omega, Elsevier, vol. 77(C), pages 143-153.
    10. Drótos, Márton & Erdos, Gábor & Kis, Tamás, 2009. "Computing lower and upper bounds for a large-scale industrial job shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 197(1), pages 296-306, August.
    11. Behrooz Shahbazi & Seyed Habib A. Rahmati, 2021. "Developing a Flexible Manufacturing Control System Considering Mixed Uncertain Predictive Maintenance Model: a Simulation-Based Optimization Approach," SN Operations Research Forum, Springer, vol. 2(4), pages 1-43, December.
    12. Lili Zuo & Zhenxia Sun & Lingfa Lu & Liqi Zhang, 2019. "Single-Machine Scheduling with Rejection and an Operator Non-Availability Interval," Mathematics, MDPI, vol. 7(8), pages 1-8, July.
    13. Aggoune, Riad & Portmann, Marie-Claude, 2006. "Flow shop scheduling problem with limited machine availability: A heuristic approach," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 4-15, February.
    14. Jodlbauer, Herbert, 2006. "An approach for integrated scheduling and lot-sizing," European Journal of Operational Research, Elsevier, vol. 172(2), pages 386-400, July.
    15. Burdett, R.L. & Kozan, E., 2009. "Techniques for inserting additional trains into existing timetables," Transportation Research Part B: Methodological, Elsevier, vol. 43(8-9), pages 821-836, September.
    16. Olivier Guyon & Pierre Lemaire & Éric Pinson & David Rivreau, 2014. "Solving an integrated job-shop problem with human resource constraints," Annals of Operations Research, Springer, vol. 213(1), pages 147-171, February.
    17. Absi, Nabil & van den Heuvel, Wilco & Dauzère-Pérès, Stéphane, 2024. "Complexity analysis of integrated dynamic lot sizing and maintenance planning problems," European Journal of Operational Research, Elsevier, vol. 318(1), pages 100-109.
    18. Joaquín Bautista-Valhondo & Rocío Alfaro-Pozo, 2020. "Mixed integer linear programming models for Flow Shop Scheduling with a demand plan of job types," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 28(1), pages 5-23, March.
    19. Javad Seif & Mohammad Dehghanimohammadabadi & Andrew Junfang Yu, 2020. "Integrated preventive maintenance and flow shop scheduling under uncertainty," Flexible Services and Manufacturing Journal, Springer, vol. 32(4), pages 852-887, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Aggoune, Riad & Portmann, Marie-Claude, 2006. "Flow shop scheduling problem with limited machine availability: A heuristic approach," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 4-15, February.
    2. Seyed Habib A. Rahmati & Abbas Ahmadi & Kannan Govindan, 2018. "A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach," Annals of Operations Research, Springer, vol. 269(1), pages 583-621, October.
    3. Shijin Wang & Ming Liu, 2016. "Two-machine flow shop scheduling integrated with preventive maintenance planning," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(3), pages 672-690, February.
    4. Allaoui, H. & Lamouri, S. & Artiba, A. & Aghezzaf, E., 2008. "Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan," International Journal of Production Economics, Elsevier, vol. 112(1), pages 161-167, March.
    5. Chen, Wen-Jinn, 2009. "Minimizing number of tardy jobs on a single machine subject to periodic maintenance," Omega, Elsevier, vol. 37(3), pages 591-599, June.
    6. Detienne, Boris, 2014. "A mixed integer linear programming approach to minimize the number of late jobs with and without machine availability constraints," European Journal of Operational Research, Elsevier, vol. 235(3), pages 540-552.
    7. Allaoui, H. & Artiba, A. & Elmaghraby, S.E. & Riane, F., 2006. "Scheduling of a two-machine flowshop with availability constraints on the first machine," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 16-27, February.
    8. M. A. Kubzin & V. A. Strusevich, 2006. "Planning Machine Maintenance in Two-Machine Shop Scheduling," Operations Research, INFORMS, vol. 54(4), pages 789-800, August.
    9. Hnaien, Faicel & Yalaoui, Farouk & Mhadhbi, Ahmed, 2015. "Makespan minimization on a two-machine flowshop with an availability constraint on the first machine," International Journal of Production Economics, Elsevier, vol. 164(C), pages 95-104.
    10. Fatima Benbouzid-Si Tayeb & Karima Benatchba & Abd-Essalam Messiaid, 2018. "Game theory-based integration of scheduling with flexible and periodic maintenance planning in the permutation flowshop sequencing problem," Operational Research, Springer, vol. 18(1), pages 221-255, April.
    11. C.T. Ng & Mikhail Y. Kovalyov, 2004. "An FPTAS for scheduling a two‐machine flowshop with one unavailability interval," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(3), pages 307-315, April.
    12. Ali Salmasnia & Danial Mirabadi-Dastjerd, 2017. "Joint production and preventive maintenance scheduling for a single degraded machine by considering machine failures," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 25(3), pages 544-578, October.
    13. Mostafa Khatami & Seyed Hessameddin Zegordi, 2017. "Coordinative production and maintenance scheduling problem with flexible maintenance time intervals," Journal of Intelligent Manufacturing, Springer, vol. 28(4), pages 857-867, April.
    14. Drótos, Márton & Erdos, Gábor & Kis, Tamás, 2009. "Computing lower and upper bounds for a large-scale industrial job shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 197(1), pages 296-306, August.
    15. Mosheiov, Gur & Sarig, Assaf & Strusevich, Vitaly A & Mosheiff, Jonathan, 2018. "Two-machine flow shop and open shop scheduling problems with a single maintenance window," European Journal of Operational Research, Elsevier, vol. 271(2), pages 388-400.
    16. Mellouli, Racem & Sadfi, Chrif & Chu, Chengbin & Kacem, Imed, 2009. "Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times," European Journal of Operational Research, Elsevier, vol. 197(3), pages 1150-1165, September.
    17. Zribi, N. & El Kamel, A. & Borne, P., 2008. "Minimizing the makespan for the MPM job-shop with availability constraints," International Journal of Production Economics, Elsevier, vol. 112(1), pages 151-160, March.
    18. Liao, Ching-Jong & Shyur, Der-Lin & Lin, Chien-Hung, 2005. "Makespan minimization for two parallel machines with an availability constraint," European Journal of Operational Research, Elsevier, vol. 160(2), pages 445-456, January.
    19. Kerem Bülbül & Safia Kedad-Sidhoum & Halil Şen, 2019. "Single-machine common due date total earliness/tardiness scheduling with machine unavailability," Journal of Scheduling, Springer, vol. 22(5), pages 543-565, October.
    20. Hatem Hadda, 2017. "Approximation results for the two-machine job shop under limited machine availability," OPSEARCH, Springer;Operational Research Society of India, vol. 54(3), pages 651-662, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:153:y:2004:i:3:p:534-543. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.