Two-machine flow shop and open shop scheduling problems with a single maintenance window
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2018.04.019
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- C.T. Ng & Mikhail Y. Kovalyov, 2004. "An FPTAS for scheduling a two‐machine flowshop with one unavailability interval," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(3), pages 307-315, April.
- J. Breit & G. Schmidt & V. A. Strusevich, 2003. "Non-preemptive two-machine open shop scheduling with non-availability constraints," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 57(2), pages 217-234, May.
- Lee, Chung-Yee & Lin, Chen-Sin, 2001. "Single-machine scheduling with maintenance and repair rate-modifying activities," European Journal of Operational Research, Elsevier, vol. 135(3), pages 493-513, December.
- Lee, Chung-Yee, 1999. "Two-machine flowshop scheduling with availability constraints," European Journal of Operational Research, Elsevier, vol. 114(2), pages 420-429, April.
- M.A. Kubzin & V.A. Strusevich & J. Breit & G. Schmidt, 2006. "Polynomial‐time approximation schemes for two‐machine open shop scheduling with nonavailability constraints," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(1), pages 16-23, February.
- G Mosheiov & J B Sidney, 2010. "Scheduling a deteriorating maintenance activity on a single machine," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(5), pages 882-887, May.
- J S Chen, 2006. "Single-machine scheduling with flexible and periodic maintenance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(6), pages 703-710, June.
- M. A. Kubzin & V. A. Strusevich, 2006. "Planning Machine Maintenance in Two-Machine Shop Scheduling," Operations Research, INFORMS, vol. 54(4), pages 789-800, August.
- Chen, Jen-Shiang, 2008. "Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan," European Journal of Operational Research, Elsevier, vol. 190(1), pages 90-102, October.
- Lee, C. -Y. & Leon, V. J., 2001. "Machine scheduling with a rate-modifying activity," European Journal of Operational Research, Elsevier, vol. 128(1), pages 119-128, January.
- Xu, Dehua & Yin, Yunqiang & Li, Hongxing, 2009. "A note on "scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan"," European Journal of Operational Research, Elsevier, vol. 197(2), pages 825-827, September.
- S. M. Johnson, 1954. "Optimal two‐ and three‐stage production schedules with setup times included," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 1(1), pages 61-68, March.
- Bo Chen & Vitaly A. Strusevich, 1993. "Approximation Algorithms for Three-Machine Open Shop Scheduling," INFORMS Journal on Computing, INFORMS, vol. 5(3), pages 321-326, August.
- Kubiak, Wieslaw & Blazewicz, Jacek & Formanowicz, Piotr & Breit, Joachim & Schmidt, Gunter, 2002. "Two-machine flow shops with limited machine availability," European Journal of Operational Research, Elsevier, vol. 136(3), pages 528-540, February.
- Kabir Rustogi & Vitaly A Strusevich, 2015. "Single machine scheduling with time-dependent linear deterioration and rate-modifying maintenance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 66(3), pages 500-515, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Lin, Ran & Wang, Jun-Qiang & Oulamara, Ammar, 2023. "Online scheduling on parallel-batch machines with periodic availability constraints and job delivery," Omega, Elsevier, vol. 116(C).
- Jin Qian & Haiyan Han, 2022. "Improved algorithms for proportionate flow shop scheduling with due-window assignment," Annals of Operations Research, Springer, vol. 309(1), pages 249-258, February.
- Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
- Yuan Yuan & Yan Lan & Ning Ding & Xin Han, 2022. "A PTAS for non-resumable open shop scheduling with an availability constraint," Journal of Combinatorial Optimization, Springer, vol. 43(2), pages 350-362, March.
- Castro, Pedro M. & Harjunkoski, Iiro & Grossmann, Ignacio E., 2019. "Discrete and continuous-time formulations for dealing with break periods: Preemptive and non-preemptive scheduling," European Journal of Operational Research, Elsevier, vol. 278(2), pages 563-577.
- Zikai Zhang & Qiuhua Tang, 2022. "Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics," Flexible Services and Manufacturing Journal, Springer, vol. 34(1), pages 156-203, March.
- Ahmadian, Mohammad Mahdi & Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2021. "Four decades of research on the open-shop scheduling problem to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 295(2), pages 399-426.
- Lin, Ran & Wang, Jun-Qiang & Liu, Zhixin & Xu, Jun, 2023. "Best possible algorithms for online scheduling on identical batch machines with periodic pulse interruptions," European Journal of Operational Research, Elsevier, vol. 309(1), pages 53-64.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Yuan Yuan & Yan Lan & Ning Ding & Xin Han, 2022. "A PTAS for non-resumable open shop scheduling with an availability constraint," Journal of Combinatorial Optimization, Springer, vol. 43(2), pages 350-362, March.
- C N Potts & V A Strusevich, 2009. "Fifty years of scheduling: a survey of milestones," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 41-68, May.
- Ahmadian, Mohammad Mahdi & Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2021. "Four decades of research on the open-shop scheduling problem to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 295(2), pages 399-426.
- Shi-Sheng Li & Ren-Xia Chen, 2017. "Scheduling with Rejection and a Deteriorating Maintenance Activity on a Single Machine," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(02), pages 1-17, April.
- Javad Seif & Mohammad Dehghanimohammadabadi & Andrew Junfang Yu, 2020. "Integrated preventive maintenance and flow shop scheduling under uncertainty," Flexible Services and Manufacturing Journal, Springer, vol. 32(4), pages 852-887, December.
- Wang, Ting & Baldacci, Roberto & Lim, Andrew & Hu, Qian, 2018. "A branch-and-price algorithm for scheduling of deteriorating jobs and flexible periodic maintenance on a single machine," European Journal of Operational Research, Elsevier, vol. 271(3), pages 826-838.
- Kim, Hyunjoon & Kim, Byung-In, 2022. "Optimal sequence for single server scheduling incorporating a rate-modifying activity under job-dependent linear deterioration," European Journal of Operational Research, Elsevier, vol. 298(2), pages 439-450.
- Seyed Habib A. Rahmati & Abbas Ahmadi & Kannan Govindan, 2018. "A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach," Annals of Operations Research, Springer, vol. 269(1), pages 583-621, October.
- Xinyu Sun & Tao Liu & Xin-Na Geng & Yang Hu & Jing-Xiao Xu, 2023. "Optimization of scheduling problems with deterioration effects and an optional maintenance activity," Journal of Scheduling, Springer, vol. 26(3), pages 251-266, June.
- Hoyningen-Huene, Wiebke von, 2015. "Heuristics for an Integrated Maintenance and Production Scheduling Problem on Parallel Machines with Stochastic Failures and Non-Resumable Jobs," EconStor Preprints 112746, ZBW - Leibniz Information Centre for Economics.
- von Hoyningen-Huene, W. & Kiesmüller, G.P., 2015. "Evaluation of the expected makespan of a set of non-resumable jobs on parallel machines with stochastic failures," European Journal of Operational Research, Elsevier, vol. 240(2), pages 439-446.
- Shijin Wang & Ming Liu, 2016. "Two-machine flow shop scheduling integrated with preventive maintenance planning," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(3), pages 672-690, February.
- G Mosheiov & J B Sidney, 2010. "Scheduling a deteriorating maintenance activity on a single machine," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(5), pages 882-887, May.
- Hui Zhu & Min Li & Zhangjin Zhou & Yun You, 2016. "Due-window assignment and scheduling with general position-dependent processing times involving a deteriorating and compressible maintenance activity," International Journal of Production Research, Taylor & Francis Journals, vol. 54(12), pages 3475-3490, June.
- J-J Wang & J-B Wang & F Liu, 2011. "Parallel machines scheduling with a deteriorating maintenance activity," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(10), pages 1898-1902, October.
- Kabir Rustogi & Vitaly A. Strusevich, 2017. "Single machine scheduling with a generalized job-dependent cumulative effect," Journal of Scheduling, Springer, vol. 20(6), pages 583-592, December.
- Stanisław Gawiejnowicz, 2020. "A review of four decades of time-dependent scheduling: main results, new topics, and open problems," Journal of Scheduling, Springer, vol. 23(1), pages 3-47, February.
- Nesello, Vitor & Subramanian, Anand & Battarra, Maria & Laporte, Gilbert, 2018. "Exact solution of the single-machine scheduling problem with periodic maintenances and sequence-dependent setup times," European Journal of Operational Research, Elsevier, vol. 266(2), pages 498-507.
- Rustogi, Kabir & Strusevich, Vitaly A., 2012. "Single machine scheduling with general positional deterioration and rate-modifying maintenance," Omega, Elsevier, vol. 40(6), pages 791-804.
- Janiak, Adam & Janiak, Władysław A. & Krysiak, Tomasz & Kwiatkowski, Tomasz, 2015. "A survey on scheduling problems with due windows," European Journal of Operational Research, Elsevier, vol. 242(2), pages 347-357.
More about this item
Keywords
Scheduling; Flow shop; Open shop; Machine maintenance start window; Approximation algorithm;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:271:y:2018:i:2:p:388-400. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.