A two-stage decision procedure for monitoring processes with low fraction nonconforming
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Ben-Daya, M. & Rahim, M. A., 2000. "Effect of maintenance on the economic design of -control chart," European Journal of Operational Research, Elsevier, vol. 120(1), pages 131-143, January.
- Wu, Zhang & Zhang, Xiaolan & Yeo, Song Huat, 2001. "Design of the sum-of-conforming-run-length control charts," European Journal of Operational Research, Elsevier, vol. 132(1), pages 187-196, July.
- Elart Collani, 1989. "Economically optimalc- andnp-control charts," Metrika: International Journal for Theoretical and Applied Statistics, Springer, vol. 36(1), pages 215-232, December.
- Waldmann, Karl-Heinz, 1996. "Design of double CUSUM quality control schemes," European Journal of Operational Research, Elsevier, vol. 95(3), pages 641-648, December.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Bersimis, Sotiris & Koutras, Markos V. & Maravelakis, Petros E., 2014. "A compound control chart for monitoring and controlling high quality processes," European Journal of Operational Research, Elsevier, vol. 233(3), pages 595-603.
- Zhang, Cai Wen & Xie, Min & Goh, Thong Ngee, 2008. "Economic design of cumulative count of conforming charts under inspection by samples," International Journal of Production Economics, Elsevier, vol. 111(1), pages 93-104, January.
- Wang, Hsiuying & Huwang, Longcheen & Yu, Jeng Hung, 2015. "Multivariate control charts based on the James–Stein estimator," European Journal of Operational Research, Elsevier, vol. 246(1), pages 119-127.
- Nataliya Chukhrova & Arne Johannssen, 2020. "Monitoring of high-yield and periodical processes in health care," Health Care Management Science, Springer, vol. 23(4), pages 619-639, December.
- Zhang C. W. & Xie M. & Goh T. N., 2005. "On Cumulative Conforming Type of Control Charts for High Quality Processes Under Sampling Inspection," Stochastics and Quality Control, De Gruyter, vol. 20(2), pages 205-222, January.
- Hsing-Ming Chang & James C. Fu, 2022. "On Distribution and Average Run Length of a Two-Stage Control Process," Methodology and Computing in Applied Probability, Springer, vol. 24(4), pages 2723-2742, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Xiang, Yisha, 2013. "Joint optimization of X¯ control chart and preventive maintenance policies: A discrete-time Markov chain approach," European Journal of Operational Research, Elsevier, vol. 229(2), pages 382-390.
- Cheng, Guoqing & Li, Ling, 2020. "Joint optimization of production, quality control and maintenance for serial-parallel multistage production systems," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
- Bersimis, Sotiris & Koutras, Markos V. & Maravelakis, Petros E., 2014. "A compound control chart for monitoring and controlling high quality processes," European Journal of Operational Research, Elsevier, vol. 233(3), pages 595-603.
- Boumallessa, Zeineb & Chouikhi, Houssam & Elleuch, Mounir & Bentaher, Hatem, 2023. "Modeling and optimizing the maintenance schedule using dynamic quality and machine condition monitors in an unreliable single production system," Reliability Engineering and System Safety, Elsevier, vol. 235(C).
- Mahadik Shashibhushan B. & Shirke Digambar T., 2007. "Economic Design of A Modified Variable Sample Size and Sampling Interval Chart," Stochastics and Quality Control, De Gruyter, vol. 22(2), pages 273-293, January.
- Panagiotidou, Sofia & Nenes, George, 2009. "An economically designed, integrated quality and maintenance model using an adaptive Shewhart chart," Reliability Engineering and System Safety, Elsevier, vol. 94(3), pages 732-741.
- Zhang C. W. & Xie M. & Goh T. N., 2005. "On Cumulative Conforming Type of Control Charts for High Quality Processes Under Sampling Inspection," Stochastics and Quality Control, De Gruyter, vol. 20(2), pages 205-222, January.
- Tambe, Pravin P. & Kulkarni, Makarand S., 2022. "A reliability based integrated model of maintenance planning with quality control and production decision for improving operational performance," Reliability Engineering and System Safety, Elsevier, vol. 226(C).
- Hajji, A. & Mhada, F. & Gharbi, A. & Pellerin, R. & Malhamé, R., 2011. "Integrated product specifications and productivity decision making in unreliable manufacturing systems," International Journal of Production Economics, Elsevier, vol. 129(1), pages 32-42, January.
- Willem Albers, 2011. "Control charts for health care monitoring under overdispersion," Metrika: International Journal for Theoretical and Applied Statistics, Springer, vol. 74(1), pages 67-83, July.
- Ho, Linda Lee & Quinino, Roberto C., 2012. "Integrating on-line process control and imperfect corrective maintenance: An economical design," European Journal of Operational Research, Elsevier, vol. 222(2), pages 253-262.
- Deloux, E. & Castanier, B. & Bérenguer, C., 2009. "Predictive maintenance policy for a gradually deteriorating system subject to stress," Reliability Engineering and System Safety, Elsevier, vol. 94(2), pages 418-431.
- M. A. Pasha & M. Bameni Moghadam & M. A. Rahim, 2020. "Effects of non-normal quality data on the integrated model of imperfect maintenance, early replacement, and economic design of $${\bar{X}}$$ X ¯ -control charts," Operational Research, Springer, vol. 20(4), pages 2519-2536, December.
- Dhouib, K. & Gharbi, A. & Ben Aziza, M.N., 2012. "Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell," International Journal of Production Economics, Elsevier, vol. 137(1), pages 126-136.
- Bouslah, B. & Gharbi, A. & Pellerin, R., 2016. "Joint economic design of production, continuous sampling inspection and preventive maintenance of a deteriorating production system," International Journal of Production Economics, Elsevier, vol. 173(C), pages 184-198.
- Fakher, Hossein Beheshti & Nourelfath, Mustapha & Gendreau, Michel, 2018. "Integrating production, maintenance and quality: A multi-period multi-product profit-maximization model," Reliability Engineering and System Safety, Elsevier, vol. 170(C), pages 191-201.
- Liu, Yafen & He, Zhen & Shu, Lianjie & Wu, Zhang, 2009. "Statistical computation and analyses for attribute events," Computational Statistics & Data Analysis, Elsevier, vol. 53(9), pages 3412-3425, July.
- Rajesh Saha & Abdullahil Azeem & Kazi Wahadul Hasan & Syed Mithun Ali & Sanjoy Kumar Paul, 2021. "Integrated economic design of quality control and maintenance management: Implications for managing manufacturing process," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 12(2), pages 263-280, April.
- Wu, Zhang & Luo, Hua & Zhang, Xiaolan, 2006. "Optimal np control chart with curtailment," European Journal of Operational Research, Elsevier, vol. 174(3), pages 1723-1741, November.
- Zhou, Wenhui & Zheng, Zhibin & Xie, Wei, 2017. "A control-chart-based queueing approach for service facility maintenance with energy-delay tradeoff," European Journal of Operational Research, Elsevier, vol. 261(2), pages 613-625.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:150:y:2003:i:2:p:420-436. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.