Multi-plant production planning in capacitated self-configuring two-stage serial systems
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Emil Zavadlav & John O. McClain & L. Joseph Thomas, 1996. "Self-Buffering, Self-Balancing, Self-Flushing Production Lines," Management Science, INFORMS, vol. 42(8), pages 1151-1164, August.
- Kuik, Roelof & Salomon, Marc & van Wassenhove, Luk N., 1994. "Batching decisions: structure and models," European Journal of Operational Research, Elsevier, vol. 75(2), pages 243-263, June.
- John J. Bartholdi & Donald D. Eisenstein, 1996. "A Production Line that Balances Itself," Operations Research, INFORMS, vol. 44(1), pages 21-34, February.
- Fumero, Francesca & Vercellis, Carlo, 1997. "Integrating distribution, machine assignment and lot-sizing via Lagrangean relaxation," International Journal of Production Economics, Elsevier, vol. 49(1), pages 45-54, March.
- Chandra, Pankaj & Fisher, Marshall L., 1994. "Coordination of production and distribution planning," European Journal of Operational Research, Elsevier, vol. 72(3), pages 503-517, February.
- Thomas, Douglas J. & Griffin, Paul M., 1996. "Coordinated supply chain management," European Journal of Operational Research, Elsevier, vol. 94(1), pages 1-15, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Wen-Tsung Ho & Jason Chao-Hsien Pan & Yu-Cheng Hsiao, 2012. "Optimizing Multi-stage Production for an Assembly-Type Supply Chain with Unequal Sized Batch Shipments," Journal of Optimization Theory and Applications, Springer, vol. 153(2), pages 513-531, May.
- Hsiao, Yu-Cheng & Lin, Yi & Huang, Yun-Kuei, 2010. "Optimal multi-stage logistic and inventory policies with production bottleneck in a serial supply chain," International Journal of Production Economics, Elsevier, vol. 124(2), pages 408-413, April.
- Seok, Hyesung & Nof, Shimon Y., 2014. "Dynamic coalition reformation for adaptive demand and capacity sharing," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 136-146.
- Chung, S.H. & Lau, H.C.W. & Choy, K.L. & Ho, G.T.S. & Tse, Y.K., 2010. "Application of genetic approach for advanced planning in multi-factory environment," International Journal of Production Economics, Elsevier, vol. 127(2), pages 300-308, October.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Sônia Poltroniere & Kelly Poldi & Franklina Toledo & Marcos Arenales, 2008. "A coupling cutting stock-lot sizing problem in the paper industry," Annals of Operations Research, Springer, vol. 157(1), pages 91-104, January.
- Kai-Leung Yung & Jiafu Tang & Andrew W. H. Ip & Dingwei Wang, 2006. "Heuristics for Joint Decisions in Production, Transportation, and Order Quantity," Transportation Science, INFORMS, vol. 40(1), pages 99-116, February.
- Sigrún Andradóttir & Hayriye Ayhan & Douglas G. Down, 2001. "Server Assignment Policies for Maximizing the Steady-State Throughput of Finite Queueing Systems," Management Science, INFORMS, vol. 47(10), pages 1421-1439, October.
- Stan van Hoesel & H. Edwin Romeijn & Dolores Romero Morales & Albert P. M. Wagelmans, 2005. "Integrated Lot Sizing in Serial Supply Chains with Production Capacities," Management Science, INFORMS, vol. 51(11), pages 1706-1719, November.
- Wallace J. Hopp & Eylem Tekin & Mark P. Van Oyen, 2004. "Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers," Management Science, INFORMS, vol. 50(1), pages 83-98, January.
- Hein, Fanny & Almeder, Christian, 2016. "Quantitative insights into the integrated supply vehicle routing and production planning problem," International Journal of Production Economics, Elsevier, vol. 177(C), pages 66-76.
- Sigrún Andradóttir & Hayriye Ayhan & Douglas G. Down, 2007. "Compensating for Failures with Flexible Servers," Operations Research, INFORMS, vol. 55(4), pages 753-768, August.
- Zakaria Chekoubi & Wajdi Trabelsi & Nathalie Sauer & Ilias Majdouline, 2022. "The Integrated Production-Inventory-Routing Problem with Reverse Logistics and Remanufacturing: A Two-Phase Decomposition Heuristic," Sustainability, MDPI, vol. 14(20), pages 1-30, October.
- Anton J. Kleywegt & Vijay S. Nori & Martin W. P. Savelsbergh, 2002. "The Stochastic Inventory Routing Problem with Direct Deliveries," Transportation Science, INFORMS, vol. 36(1), pages 94-118, February.
- van Hoesel, C.P.M. & Romeijn, H.E. & Romero Morales, M.D. & Wagelmans, A., 2002. "Polynomial time algorithms for some multi-level lot-sizing problems with production capacities," Research Memorandum 018, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
- Ahumada, Omar & Villalobos, J. Rene, 2009. "Application of planning models in the agri-food supply chain: A review," European Journal of Operational Research, Elsevier, vol. 196(1), pages 1-20, July.
- Erdem Eskigun & Reha Uzsoy & Paul V. Preckel & George Beaujon & Subramanian Krishnan & Jeffrey D. Tew, 2007. "Outbound supply chain network design with mode selection and lead time considerations," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(3), pages 282-300, April.
- van Hoesel, S. & Romeijn, H.E. & Romero Morales, D. & Wagelmans, A.P.M., 2002. "Polynomial Time Algorithms For Some Multi-Level Lot-Sizing Problems With Production Capacities," ERIM Report Series Research in Management ERS-2002-59-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- John O. McClain & Kenneth L. Schultz & L. Joseph Thomas, 2000. "Management of Worksharing Systems," Manufacturing & Service Operations Management, INFORMS, vol. 2(1), pages 49-67, July.
- John J. Bartholdi & Leonid A. Bunimovich & Donald D. Eisenstein, 1999. "Dynamics of Two- and Three-Worker “Bucket Brigade” Production Lines," Operations Research, INFORMS, vol. 47(3), pages 488-491, June.
- Sennott, Linn I. & Van Oyen, Mark P. & Iravani, Seyed M.R., 2006. "Optimal dynamic assignment of a flexible worker on an open production line with specialists," European Journal of Operational Research, Elsevier, vol. 170(2), pages 541-566, April.
- Maloni, Michael J. & Benton, W.C., 1997. "Supply chain partnerships: Opportunities for operations research," European Journal of Operational Research, Elsevier, vol. 101(3), pages 419-429, September.
- Luca Bertazzi & Simona Cherubini, 2013. "An inventory-transportation system with stochastic demand," Computational Management Science, Springer, vol. 10(1), pages 1-20, February.
- Li, Yantong & Chu, Feng & Chu, Chengbin & Zhu, Zhanguo, 2019. "An efficient three-level heuristic for the large-scaled multi-product production routing problem with outsourcing," European Journal of Operational Research, Elsevier, vol. 272(3), pages 914-927.
- John J. Bartholdi & Donald D. Eisenstein & Robert D. Foley, 2001. "Performance of Bucket Brigades When Work Is Stochastic," Operations Research, INFORMS, vol. 49(5), pages 710-719, October.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:119:y:1999:i:2:p:451-460. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.