IDEAS home Printed from https://ideas.repec.org/a/inm/ormnsc/v42y1996i8p1151-1164.html
   My bibliography  Save this article

Self-Buffering, Self-Balancing, Self-Flushing Production Lines

Author

Listed:
  • Emil Zavadlav

    (University of Ljubljana, Ljubljana, Slovenija)

  • John O. McClain

    (S. C. Johnson Graduate School of Management, Cornell University, Ithaca, New York 14853)

  • L. Joseph Thomas

    (S. C. Johnson Graduate School of Management, Cornell University, Ithaca, New York 14853)

Abstract

This research addresses a system of flexible worker assignments in a setting where there are more workers than machines. When organized using this system, a production line balances itself by shifting the workloads continuously and automatically in response to changes in the state of the system. The system is, in effect, buffering itself against variation by altering the work assignments on the fly. This allows the system to operate with very low levels of work-in-process inventory (WIP). In this paper, the workers (rather than machines) are the factor that limits the rate of output. We also assume that the line has a "U" shape, but many of the results do not depend on this topology. An industrial example is described. The system has some interesting and counter-intuitive properties which we demonstrate under a variety of circumstances through an exploratory approach that uses both Markovian and simulation models. Several different policies are compared under conditions of processing time uncertainty. We demonstrate that a flexible assignment system can outperform fixed assignments in a variety of circumstances. Of particular interest is the near absence of balance delay, even when the tasks cannot be divided equally among the workers.

Suggested Citation

  • Emil Zavadlav & John O. McClain & L. Joseph Thomas, 1996. "Self-Buffering, Self-Balancing, Self-Flushing Production Lines," Management Science, INFORMS, vol. 42(8), pages 1151-1164, August.
  • Handle: RePEc:inm:ormnsc:v:42:y:1996:i:8:p:1151-1164
    DOI: 10.1287/mnsc.42.8.1151
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/mnsc.42.8.1151
    Download Restriction: no

    File URL: https://libkey.io/10.1287/mnsc.42.8.1151?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Gregory Dobson & Tolga Tezcan & Vera Tilson, 2013. "Optimal Workflow Decisions for Investigators in Systems with Interruptions," Management Science, INFORMS, vol. 59(5), pages 1125-1141, May.
    2. Koichi Nakade, 2017. "Effect of worker sequence on cycle time in a U-shaped line with chase mode," International Journal of Production Research, Taylor & Francis Journals, vol. 55(10), pages 2752-2763, May.
    3. Down, Douglas G. & Karakostas, George, 2008. "Maximizing throughput in queueing networks with limited flexibility," European Journal of Operational Research, Elsevier, vol. 187(1), pages 98-112, May.
    4. Sigrún Andradóttir & Hayriye Ayhan & Douglas G. Down, 2001. "Server Assignment Policies for Maximizing the Steady-State Throughput of Finite Queueing Systems," Management Science, INFORMS, vol. 47(10), pages 1421-1439, October.
    5. Suresh Chand & Ting Zeng, 2001. "A Comparison of U-Line and Straight-Line Performances Under Stochastic Task Times," Manufacturing & Service Operations Management, INFORMS, vol. 3(2), pages 138-150, January.
    6. Vercellis, Carlo, 1999. "Multi-plant production planning in capacitated self-configuring two-stage serial systems," European Journal of Operational Research, Elsevier, vol. 119(2), pages 451-460, December.
    7. John O. McClain & Kenneth L. Schultz & L. Joseph Thomas, 2000. "Management of Worksharing Systems," Manufacturing & Service Operations Management, INFORMS, vol. 2(1), pages 49-67, July.
    8. John J. Bartholdi & Leonid A. Bunimovich & Donald D. Eisenstein, 1999. "Dynamics of Two- and Three-Worker “Bucket Brigade” Production Lines," Operations Research, INFORMS, vol. 47(3), pages 488-491, June.
    9. Sunder Kekre & Uday S. Rao & Jayashankar M. Swaminathan & Jun Zhang, 2003. "Reconfiguring a Remanufacturing Line at Visteon, Mexico," Interfaces, INFORMS, vol. 33(6), pages 30-43, December.
    10. S.M.R. Iravani & J.A. Buzacott & M.J.M. Posner, 2005. "A robust policy for serial agile production systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(1), pages 58-73, February.
    11. Sennott, Linn I. & Van Oyen, Mark P. & Iravani, Seyed M.R., 2006. "Optimal dynamic assignment of a flexible worker on an open production line with specialists," European Journal of Operational Research, Elsevier, vol. 170(2), pages 541-566, April.
    12. Sigrún Andradóttir & Hayriye Ayhan & Douglas G. Down, 2007. "Compensating for Failures with Flexible Servers," Operations Research, INFORMS, vol. 55(4), pages 753-768, August.
    13. Nakade, Koichi & Ohno, Katsuhisa, 2003. "Separate and carousel type allocations of workers in a U-shaped production line," European Journal of Operational Research, Elsevier, vol. 145(2), pages 403-424, March.
    14. John J. Bartholdi & Donald D. Eisenstein & Robert D. Foley, 2001. "Performance of Bucket Brigades When Work Is Stochastic," Operations Research, INFORMS, vol. 49(5), pages 710-719, October.
    15. Sigrún Andradóttir & Hayriye Ayhan, 2005. "Throughput Maximization for Tandem Lines with Two Stations and Flexible Servers," Operations Research, INFORMS, vol. 53(3), pages 516-531, June.
    16. Wallace J. Hopp & Eylem Tekin & Mark P. Van Oyen, 2004. "Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers," Management Science, INFORMS, vol. 50(1), pages 83-98, January.
    17. Achal Bassamboo & Ramandeep S. Randhawa & Jan A. Van Mieghem, 2012. "A Little Flexibility Is All You Need: On the Asymptotic Value of Flexible Capacity in Parallel Queuing Systems," Operations Research, INFORMS, vol. 60(6), pages 1423-1435, December.
    18. Wallace J. Hopp & Seyed M. R. Iravani & Biying Shou, 2005. "Serial Agile Production Systems with Automation," Operations Research, INFORMS, vol. 53(5), pages 852-866, October.
    19. Richard L. Daniels & Joseph B. Mazzola & Dailun Shi, 2004. "Flow Shop Scheduling with Partial Resource Flexibility," Management Science, INFORMS, vol. 50(5), pages 658-669, May.
    20. Ramesh Arumugam & Maria Mayorga & Kevin Taaffe, 2009. "Inventory based allocation policies for flexible servers in serial systems," Annals of Operations Research, Springer, vol. 172(1), pages 1-23, November.
    21. John Boudreau & Wallace Hopp & John O. McClain & L. Joseph Thomas, 2003. "On the Interface Between Operations and Human Resources Management," Manufacturing & Service Operations Management, INFORMS, vol. 5(3), pages 179-202, September.
    22. Eylem Tekin & Wallace J. Hopp & Mark P. Van Oyen, 2002. "Benefits of Skill Chaining in Production Lines with Cross-Trained Workers: An Extended Abstract," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 17-20.
    23. Qin Chen & ShiLong Liao & ZhongZhen Wu & ShuPing Yi, 2016. "Comparative analysis of the performance of a novel U-shaped ‘chasing-overtaking’ production line," International Journal of Production Research, Taylor & Francis Journals, vol. 54(12), pages 3677-3690, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:42:y:1996:i:8:p:1151-1164. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.