Resource levelling for projects with schedule-dependent time windows
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Erik Demeulemeester, 1995. "Minimizing Resource Availability Costs in Time-Limited Project Networks," Management Science, INFORMS, vol. 41(10), pages 1590-1598, October.
- Bandelloni, M. & Tucci, M. & Rinaldi, R., 1994. "Optimal resource leveling using non-serial dyanamic programming," European Journal of Operational Research, Elsevier, vol. 78(2), pages 162-177, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- André Schnabel & Carolin Kellenbrink & Stefan Helber, 2018.
"Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints,"
Business Research, Springer;German Academic Association for Business Research, vol. 11(2), pages 329-356, September.
- Schnabel, André & Kellenbrink, Carolin & Helber, Stefan, 2017. "Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints," Hannover Economic Papers (HEP) dp-593, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
- Atan, Tankut & Eren, Elif, 2018. "Optimal project duration for resource leveling," European Journal of Operational Research, Elsevier, vol. 266(2), pages 508-520.
- Hongbo Li & Linwen Zheng & Hanyu Zhu, 2023. "Resource leveling in projects with flexible structures," Annals of Operations Research, Springer, vol. 321(1), pages 311-342, February.
- Bordley, Robert F. & Keisler, Jeffrey M. & Logan, Tom M., 2019. "Managing projects with uncertain deadlines," European Journal of Operational Research, Elsevier, vol. 274(1), pages 291-302.
- Cappanera, Paola & Visintin, Filippo & Banditori, Carlo, 2014. "Comparing resource balancing criteria in master surgical scheduling: A combined optimisation-simulation approach," International Journal of Production Economics, Elsevier, vol. 158(C), pages 179-196.
- Kreter, Stefan & Schutt, Andreas & Stuckey, Peter J. & Zimmermann, Jürgen, 2018. "Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems," European Journal of Operational Research, Elsevier, vol. 266(2), pages 472-486.
- C-C Hsu & D S Kim, 2005. "A new heuristic for the multi-mode resource investment problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(4), pages 406-413, April.
- Yuvraj Gajpal & Ashraf Elazouni, 2015. "Enhanced heuristic for finance-based scheduling of construction projects," Construction Management and Economics, Taylor & Francis Journals, vol. 33(7), pages 531-553, July.
- Drótos, Márton & Kis, Tamás, 2011. "Resource leveling in a machine environment," European Journal of Operational Research, Elsevier, vol. 212(1), pages 12-21, July.
- Neumann, K. & Zimmermann, J., 2000. "Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints," European Journal of Operational Research, Elsevier, vol. 127(2), pages 425-443, December.
- Lena Sophie Wohlert & Jürgen Zimmermann, 2024. "Resource overload problems with tardiness penalty: structural properties and solution approaches," Annals of Operations Research, Springer, vol. 338(1), pages 151-172, July.
- Cédric Verbeeck & Vincent Peteghem & Mario Vanhoucke & Pieter Vansteenwegen & El-Houssaine Aghezzaf, 2017. "A metaheuristic solution approach for the time-constrained project scheduling problem," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(2), pages 353-371, March.
- Neumann, K. & Schwindt, C. & Zimmermann, J., 2003. "Order-based neighborhoods for project scheduling with nonregular objective functions," European Journal of Operational Research, Elsevier, vol. 149(2), pages 325-343, September.
- Karen Puttkammer & Rainer Kleber & Tobias Schulz & Karl Inderfurth, 2011. "Simultane Maschinenbelegungs- und Personaleinsatzplanung in KMUs anhand eines Fallbeispiels aus der Druckereibranche," FEMM Working Papers 110010, Otto-von-Guericke University Magdeburg, Faculty of Economics and Management.
- Marta Gomes & Luís Cavique & Isabel Themido, 2006. "The crew timetabling problem: An extension of the crew scheduling problem," Annals of Operations Research, Springer, vol. 144(1), pages 111-132, April.
- Sawik, Tadeusz, 2007. "A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1060-1075, August.
- Rainer Kolisch & Christian Heimerl, 2012. "An efficient metaheuristic for integrated scheduling and staffing IT projects based on a generalized minimum cost flow network," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(2), pages 111-127, March.
- Hongbo Li & Erik Demeulemeester, 2016. "A genetic algorithm for the robust resource leveling problem," Journal of Scheduling, Springer, vol. 19(1), pages 43-60, February.
- Gahm, Christian & Dünnwald, Bastian & Sahamie, Ramin, 2014. "A multi-criteria master production scheduling approach for special purpose machinery," International Journal of Production Economics, Elsevier, vol. 149(C), pages 89-101.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Cédric Verbeeck & Vincent Peteghem & Mario Vanhoucke & Pieter Vansteenwegen & El-Houssaine Aghezzaf, 2017. "A metaheuristic solution approach for the time-constrained project scheduling problem," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(2), pages 353-371, March.
- Qingyou Yan & Qian Zhang & Xin Zou, 2016. "A Cost Optimization Model for Multiresource Leveling Problem without Project Duration Constraint," Discrete Dynamics in Nature and Society, Hindawi, vol. 2016, pages 1-8, July.
- Brucker, Peter & Drexl, Andreas & Mohring, Rolf & Neumann, Klaus & Pesch, Erwin, 1999. "Resource-constrained project scheduling: Notation, classification, models, and methods," European Journal of Operational Research, Elsevier, vol. 112(1), pages 3-41, January.
- Neumann, K. & Zimmermann, J., 2000. "Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints," European Journal of Operational Research, Elsevier, vol. 127(2), pages 425-443, December.
- Kolisch, R. & Padman, R., 2001.
"An integrated survey of deterministic project scheduling,"
Omega, Elsevier, vol. 29(3), pages 249-272, June.
- Kolisch, Rainer & Padman, R., 2001. "An integrated survey of deterministic project scheduling," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 8114, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
- Neumann, K. & Schwindt, C. & Zimmermann, J., 2003. "Order-based neighborhoods for project scheduling with nonregular objective functions," European Journal of Operational Research, Elsevier, vol. 149(2), pages 325-343, September.
- Yamashita, Denise Sato & Armentano, Vinicius Amaral & Laguna, Manuel, 2006. "Scatter search for project scheduling with resource availability cost," European Journal of Operational Research, Elsevier, vol. 169(2), pages 623-637, March.
- Beşikci, Umut & Bilge, Ümit & Ulusoy, Gündüz, 2015. "Multi-mode resource constrained multi-project scheduling and resource portfolio problem," European Journal of Operational Research, Elsevier, vol. 240(1), pages 22-31.
- Hartmann, Sönke & Briskorn, Dirk, 2010. "A survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 207(1), pages 1-14, November.
- Zhu, Xia & Ruiz, Rubén & Li, Shiyu & Li, Xiaoping, 2017. "An effective heuristic for project scheduling with resource availability cost," European Journal of Operational Research, Elsevier, vol. 257(3), pages 746-762.
- Hongbo Li & Linwen Zheng & Hanyu Zhu, 2023. "Resource leveling in projects with flexible structures," Annals of Operations Research, Springer, vol. 321(1), pages 311-342, February.
- Kreter, Stefan & Schutt, Andreas & Stuckey, Peter J. & Zimmermann, Jürgen, 2018. "Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems," European Journal of Operational Research, Elsevier, vol. 266(2), pages 472-486.
- Xiaoyu Ji & Kai Yao, 2017. "Uncertain project scheduling problem with resource constraints," Journal of Intelligent Manufacturing, Springer, vol. 28(3), pages 575-580, March.
- Nicole Megow & Rolf H. Möhring & Jens Schulz, 2011. "Decision Support and Optimization in Shutdown and Turnaround Scheduling," INFORMS Journal on Computing, INFORMS, vol. 23(2), pages 189-204, May.
- Aria Shahsavar & Nima Zoraghi & Babak Abbasi, 2018. "Integration of resource investment problem with quantity discount problem in material ordering for minimizing resource costs of projects," Operational Research, Springer, vol. 18(2), pages 315-342, July.
- Marta Gomes & Luís Cavique & Isabel Themido, 2006. "The crew timetabling problem: An extension of the crew scheduling problem," Annals of Operations Research, Springer, vol. 144(1), pages 111-132, April.
- Shadrokh, Shahram & Kianfar, Fereydoon, 2007. "A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty," European Journal of Operational Research, Elsevier, vol. 181(1), pages 86-101, August.
- Tamara Borreguero Sanchidrián & Tom Portoleau & Christian Artigues & Alvaro García Sánchez & Miguel Ortega Mier & Pierre Lopez, 2024. "Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective," Annals of Operations Research, Springer, vol. 338(1), pages 13-40, July.
- Guopeng Song & Tamás Kis & Roel Leus, 2021. "Polyhedral Results and Branch-and-Cut for the Resource Loading Problem," INFORMS Journal on Computing, INFORMS, vol. 33(1), pages 105-119, January.
- Portoleau, Tom & Artigues, Christian & Guillaume, Romain, 2024. "Robust decision trees for the multi-mode project scheduling problem with a resource investment objective and uncertain activity duration," European Journal of Operational Research, Elsevier, vol. 312(2), pages 525-540.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:117:y:1999:i:3:p:591-605. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.