Random lead times and expedited orders in (Q,r) inventory systems
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Robert S. Kaplan, 1970. "A Dynamic Inventory Model with Stochastic Lead Times," Management Science, INFORMS, vol. 16(7), pages 491-507, March.
- Ranga V. Ramasesh & J. Keith Ord & Jack C. Hayya & Andrew Pan, 1991. "Sole Versus Dual Sourcing in Stochastic Lead-Time (s, Q) Inventory Models," Management Science, INFORMS, vol. 37(4), pages 428-443, April.
- Gerchak, Yigal & Parlar, Mahmut, 1991. "Investing in reducing lead-time randomness in continuous-review inventory models," Engineering Costs and Production Economics, Elsevier, vol. 21(2), pages 191-197, May.
- Kamran Moinzadeh & Steven Nahmias, 1988. "A Continuous Review Model for an Inventory System with Two Supply Modes," Management Science, INFORMS, vol. 34(6), pages 761-773, June.
- Paul Zipkin, 1986. "Inventory Service-Level Measures: Convexity and Approximation," Management Science, INFORMS, vol. 32(8), pages 975-981, August.
- Jing-Sheng Song & Paul Zipkin, 1993. "Inventory Control in a Fluctuating Demand Environment," Operations Research, INFORMS, vol. 41(2), pages 351-370, April.
- David Zalkind, 1978. "Order-Level Inventory Systems with Independent Stochastic Leadtimes," Management Science, INFORMS, vol. 24(13), pages 1384-1392, September.
- Friedman, Moshe F., 1984. "On a stochastic extension of the EOQ formula," European Journal of Operational Research, Elsevier, vol. 17(1), pages 125-127, July.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Chiang, Chi, 2010. "An order expediting policy for continuous review systems with manufacturing lead-time," European Journal of Operational Research, Elsevier, vol. 203(2), pages 526-531, June.
- Vanteddu, Gangaraju & Chinnam, Ratna Babu & Gushikin, Oleg, 2011. "Supply chain focus dependent supplier selection problem," International Journal of Production Economics, Elsevier, vol. 129(1), pages 204-216, January.
- Chaharsooghi, S. Kamal & Heydari, Jafar, 2010. "LT variance or LT mean reduction in supply chain management: Which one has a higher impact on SC performance?," International Journal of Production Economics, Elsevier, vol. 124(2), pages 475-481, April.
- Louly, Mohamed-Aly & Dolgui, Alexandre, 2011. "Optimal time phasing and periodicity for MRP with POQ policy," International Journal of Production Economics, Elsevier, vol. 131(1), pages 76-86, May.
- Ryu, Si Wook & Lee, Kyung Keun, 2003. "A stochastic inventory model of dual sourced supply chain with lead-time reduction," International Journal of Production Economics, Elsevier, vol. 81(1), pages 513-524, January.
- Ben-Ammar, Oussama & Bettayeb, Belgacem & Dolgui, Alexandre, 2019. "Optimization of multi-period supply planning under stochastic lead times and a dynamic demand," International Journal of Production Economics, Elsevier, vol. 218(C), pages 106-117.
- Cakanyildirim, Metin & Bookbinder, James H. & Gerchak, Yigal, 2000. "Continuous review inventory models where random lead time depends on lot size and reserved capacity," International Journal of Production Economics, Elsevier, vol. 68(3), pages 217-228, December.
- Bertazzi, Luca & Mogre, Riccardo, 2018. "Dynamic expediting of an urgent order with uncertain progress," European Journal of Operational Research, Elsevier, vol. 267(1), pages 78-85.
- Aditya Jain & Harry Groenevelt & Nils Rudi, 2010. "Continuous Review Inventory Model with Dynamic Choice of Two Freight Modes with Fixed Costs," Manufacturing & Service Operations Management, INFORMS, vol. 12(1), pages 120-139, August.
- Riezebos, Jan, 2006. "Inventory order crossovers," International Journal of Production Economics, Elsevier, vol. 104(2), pages 666-675, December.
- Tempelmeier, Horst & Bantel, Oliver, 2015. "Integrated optimization of safety stock and transportation capacity," European Journal of Operational Research, Elsevier, vol. 247(1), pages 101-112.
- Kim, Taebok & Glock, Christoph H. & Kwon, Yongjang, 2014. "A closed-loop supply chain for deteriorating products under stochastic container return times," Omega, Elsevier, vol. 43(C), pages 30-40.
- Scheller-Wolf, Alan & Tayur, Sridhar, 2009. "Risk sharing in supply chains using order bands--Analytical results and managerial insights," International Journal of Production Economics, Elsevier, vol. 121(2), pages 715-727, October.
- P. Majumder & U. K. Bera & M. Maiti, 2020. "An EPQ model of substitutable products under trade credit policy with stock dependent and random substitution," OPSEARCH, Springer;Operational Research Society of India, vol. 57(4), pages 1205-1243, December.
- Louly, Mohamed-Aly Ould & Dolgui, Alexandre, 2009. "Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm," European Journal of Operational Research, Elsevier, vol. 199(3), pages 723-731, December.
- Hon‐Shiang Lau & Amy Hing‐Ling Lau, 2003. "Nonrobustness of the normal approximation of lead‐time demand in a (Q, R) system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(2), pages 149-166, March.
- Fang, Xin & Zhang, Cheng & Robb, David J. & Blackburn, Joseph D., 2013. "Decision support for lead time and demand variability reduction," Omega, Elsevier, vol. 41(2), pages 390-396.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Riezebos, Jan & Zhu, Stuart X., 2020. "Inventory control with seasonality of lead times," Omega, Elsevier, vol. 92(C).
- Riezebos, Jan, 2006. "Inventory order crossovers," International Journal of Production Economics, Elsevier, vol. 104(2), pages 666-675, December.
- Hayya, Jack C. & Bagchi, Uttarayan & Kim, Jeon G. & Sun, Daewon, 2008. "On static stochastic order crossover," International Journal of Production Economics, Elsevier, vol. 114(1), pages 404-413, July.
- Cakanyildirim, Metin & Bookbinder, James H. & Gerchak, Yigal, 2000. "Continuous review inventory models where random lead time depends on lot size and reserved capacity," International Journal of Production Economics, Elsevier, vol. 68(3), pages 217-228, December.
- Chatfield, Dean C. & Pritchard, Alan M., 2018. "Crossover aware base stock decisions for service-driven systems," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 114(C), pages 312-330.
- Lawrence W. Robinson & James R. Bradley & L. Joseph Thomas, 2001. "Consequences of Order Crossover Under Order-Up-To Inventory Policies," Manufacturing & Service Operations Management, INFORMS, vol. 3(3), pages 175-188, September.
- Alain Bensoussan & Lama Moussawi-Haidar & Metin Çakanyıldırım, 2010. "Inventory control with an order-time constraint: optimality, uniqueness and significance," Annals of Operations Research, Springer, vol. 181(1), pages 603-640, December.
- Ryu, Si Wook & Lee, Kyung Keun, 2003. "A stochastic inventory model of dual sourced supply chain with lead-time reduction," International Journal of Production Economics, Elsevier, vol. 81(1), pages 513-524, January.
- Lee, Jun-Yeon & Schwarz, Leroy B., 2007. "Leadtime reduction in a (Q,r) inventory system: An agency perspective," International Journal of Production Economics, Elsevier, vol. 105(1), pages 204-212, January.
- Thomas Wensing & Heinrich Kuhn, 2015. "Analysis of production and inventory systems when orders may cross over," Annals of Operations Research, Springer, vol. 231(1), pages 265-281, August.
- Xin X. He & Susan H. Xu & J. Keith Ord & Jack C. Hayya, 1998. "An Inventory Model with Order Crossover," Operations Research, INFORMS, vol. 46(3-supplem), pages 112-119, June.
- Svoboda, Josef & Minner, Stefan & Yao, Man, 2021. "Typology and literature review on multiple supplier inventory control models," European Journal of Operational Research, Elsevier, vol. 293(1), pages 1-23.
- Victor Martínez-de-Albéniz & Alejandro Lago, 2010. "Myopic Inventory Policies Using Individual Customer Arrival Information," Manufacturing & Service Operations Management, INFORMS, vol. 12(4), pages 663-672, May.
- Louly, Mohamed-Aly Ould & Dolgui, Alexandre, 2009. "Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm," European Journal of Operational Research, Elsevier, vol. 199(3), pages 723-731, December.
- Alp Muharremoglu & Nan Yang, 2010. "Inventory Management with an Exogenous Supply Process," Operations Research, INFORMS, vol. 58(1), pages 111-129, February.
- Pérez, Cinthia & Geunes, Joseph, 2014. "A (Q,R) inventory replenishment model with two delivery modes," European Journal of Operational Research, Elsevier, vol. 237(2), pages 528-545.
- Achin Srivastav & Sunil Agrawal, 2020. "Multi-objective optimization of mixture inventory system experiencing order crossover," Annals of Operations Research, Springer, vol. 290(1), pages 943-960, July.
- Disney, Stephen M. & Maltz, Arnold & Wang, Xun & Warburton, Roger D.H., 2016. "Inventory management for stochastic lead times with order crossovers," European Journal of Operational Research, Elsevier, vol. 248(2), pages 473-486.
- Martinez de Albeniz, Victor & Lago, Alejandro, 2007. "Myopic inventory policies using individual customer arrival information," IESE Research Papers D/719, IESE Business School.
- Minner, Stefan, 2003. "Multiple-supplier inventory models in supply chain management: A review," International Journal of Production Economics, Elsevier, vol. 81(1), pages 265-279, January.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:115:y:1999:i:2:p:300-313. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.