IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v267y2018i1p78-85.html
   My bibliography  Save this article

Dynamic expediting of an urgent order with uncertain progress

Author

Listed:
  • Bertazzi, Luca
  • Mogre, Riccardo

Abstract

A supplier manages an urgent order with uncertain progress for which her client has set a deadline for its completion. The supplier observes in real time the order progress and chooses dynamically the effort level, such as manpower level, to expedite the order. Her problem is to identify expediting policies to minimise her expected cost, given by two costs in trade-off with each other: an effort level cost and a one-time penalty cost for late completion of the order. We formulate this problem using a discrete stochastic dynamic programming framework and obtain an optimal expediting policy for it.By conducting a worst-case analysis, we show that decreasing the level of flexibility, interpreted as the supplier’s ability to update effort levels more often, may lead to a large increase in the costs of managing the order. We refine the problem formulation by modelling the case in which the supplier takes into account the negative effects of late order completion on her client using a penalty cost charged every period the order is delayed. We find an optimal policy for this case, by solving two dynamic programming problems sequentially. For both problems, we show that in presence of certain assumptions, there is an optimal expediting policy for which effort levels are non-increasing in the order progress. Finally, using a simulation study based on a car seat assembly case, we compare the performance of the two policies.

Suggested Citation

  • Bertazzi, Luca & Mogre, Riccardo, 2018. "Dynamic expediting of an urgent order with uncertain progress," European Journal of Operational Research, Elsevier, vol. 267(1), pages 78-85.
  • Handle: RePEc:eee:ejores:v:267:y:2018:i:1:p:78-85
    DOI: 10.1016/j.ejor.2017.11.012
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221717310238
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2017.11.012?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Chevalier, Philippe & Lamas, Alejandro & Lu, Liang & Mlinar, Tanja, 2015. "Revenue management for operations with urgent orders," European Journal of Operational Research, Elsevier, vol. 240(2), pages 476-487.
    2. Bookbinder, James H. & Cakanyildirim, Metin, 1999. "Random lead times and expedited orders in (Q,r) inventory systems," European Journal of Operational Research, Elsevier, vol. 115(2), pages 300-313, June.
    3. Berling, Peter & Martinez de Albeniz, Victor, 2011. "Optimal expediting decisions in a continuous-stage serial supply chain," IESE Research Papers D/906, IESE Business School.
    4. Eric Logan Huggins & Tava Lennon Olsen, 2003. "Supply Chain Management with Guaranteed Delivery," Management Science, INFORMS, vol. 49(9), pages 1154-1167, September.
    5. David G. Lawson & Evan L. Porteus, 2000. "Multistage Inventory Management with Expediting," Operations Research, INFORMS, vol. 48(6), pages 878-893, December.
    6. Sabri Çelik & Costis Maglaras, 2008. "Dynamic Pricing and Lead-Time Quotation for a Multiclass Make-to-Order Queue," Management Science, INFORMS, vol. 54(6), pages 1132-1146, June.
    7. Chiang, Chi, 2010. "An order expediting policy for continuous review systems with manufacturing lead-time," European Journal of Operational Research, Elsevier, vol. 203(2), pages 526-531, June.
    8. Gallego, Guillermo & Jin, Yue & Muriel, Ana & Zhang, Ge & Yildiz, V. Taylan, 2007. "Optimal ordering policies with convertible lead times," European Journal of Operational Research, Elsevier, vol. 176(2), pages 892-910, January.
    9. Bregman, Robert L., 2009. "A heuristic procedure for solving the dynamic probabilistic project expediting problem," European Journal of Operational Research, Elsevier, vol. 192(1), pages 125-137, January.
    10. Fu, Ke & Xu, Jiayan & Miao, Zhaowei, 2013. "Newsvendor with multiple options of expediting," European Journal of Operational Research, Elsevier, vol. 226(1), pages 94-99.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Svoboda, Josef & Minner, Stefan & Yao, Man, 2021. "Typology and literature review on multiple supplier inventory control models," European Journal of Operational Research, Elsevier, vol. 293(1), pages 1-23.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Svoboda, Josef & Minner, Stefan & Yao, Man, 2021. "Typology and literature review on multiple supplier inventory control models," European Journal of Operational Research, Elsevier, vol. 293(1), pages 1-23.
    2. Höller, Simon J. & Özsen, Raik & Thonemann, Ulrich W., 2020. "Determining optimal parameters for expediting policies under service level constraints," European Journal of Operational Research, Elsevier, vol. 281(2), pages 274-285.
    3. Klosterhalfen, Steffen T. & Willems, Sean P. & Dittmar, Daniel, 2023. "Safety stock placement in supply chains with expediting," European Journal of Operational Research, Elsevier, vol. 307(2), pages 745-757.
    4. Chiang, Chi, 2010. "An order expediting policy for continuous review systems with manufacturing lead-time," European Journal of Operational Research, Elsevier, vol. 203(2), pages 526-531, June.
    5. Raik Özsen & Ulrich W. Thonemann, 2015. "Determining Optimal Parameters for Expediting Policies," Manufacturing & Service Operations Management, INFORMS, vol. 17(1), pages 120-133, February.
    6. Aditya Jain & Harry Groenevelt & Nils Rudi, 2010. "Continuous Review Inventory Model with Dynamic Choice of Two Freight Modes with Fixed Costs," Manufacturing & Service Operations Management, INFORMS, vol. 12(1), pages 120-139, August.
    7. Tempelmeier, Horst & Bantel, Oliver, 2015. "Integrated optimization of safety stock and transportation capacity," European Journal of Operational Research, Elsevier, vol. 247(1), pages 101-112.
    8. Metin Çakanyildirim & Sirong Luo, 2017. "Stochastic inventory system with lead time flexibility: offered by a manufacturer/transporter," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(12), pages 1533-1552, December.
    9. Fu, Ke & Xu, Jiayan & Miao, Zhaowei, 2013. "Newsvendor with multiple options of expediting," European Journal of Operational Research, Elsevier, vol. 226(1), pages 94-99.
    10. Klosterhalfen, Steffen T. & Dittmar, Daniel & Minner, Stefan, 2013. "An integrated guaranteed- and stochastic-service approach to inventory optimization in supply chains," European Journal of Operational Research, Elsevier, vol. 231(1), pages 109-119.
    11. Hua, N. Grace & Willems, Sean P., 2016. "Optimally configuring a two-stage serial line supply chain under the guaranteed service model," International Journal of Production Economics, Elsevier, vol. 181(PA), pages 98-106.
    12. Aouam, Tarik & Kumar, Kunal, 2019. "On the effect of overtime and subcontracting on supply chain safety stocks," Omega, Elsevier, vol. 89(C), pages 1-20.
    13. Ankur Goel & Genaro J. Gutierrez, 2011. "Multiechelon Procurement and Distribution Policies for Traded Commodities," Management Science, INFORMS, vol. 57(12), pages 2228-2244, December.
    14. Zahraei, Seyed Mehdi & Teo, Chee-Chong, 2017. "Optimizing a supply network with production smoothing, freight expediting and safety stocks: An analysis of tactical trade-offs," European Journal of Operational Research, Elsevier, vol. 262(1), pages 75-88.
    15. Peter Berling & Victor Martínez-de-Albéniz, 2016. "Dynamic Speed Optimization in Supply Chains with Stochastic Demand," Transportation Science, INFORMS, vol. 50(3), pages 1114-1127, August.
    16. Ben-Ammar, Oussama & Bettayeb, Belgacem & Dolgui, Alexandre, 2019. "Optimization of multi-period supply planning under stochastic lead times and a dynamic demand," International Journal of Production Economics, Elsevier, vol. 218(C), pages 106-117.
    17. van Asperen, E. & Dekker, R., 2010. "Flexibility in Port Selection: A Quantitative Approach Using Floating Stocks," Econometric Institute Research Papers EI 2009-44, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    18. Seitz, Alexander & Grunow, Martin & Akkerman, Renzo, 2020. "Data driven supply allocation to individual customers considering forecast bias," International Journal of Production Economics, Elsevier, vol. 227(C).
    19. P. Majumder & U. K. Bera & M. Maiti, 2020. "An EPQ model of substitutable products under trade credit policy with stock dependent and random substitution," OPSEARCH, Springer;Operational Research Society of India, vol. 57(4), pages 1205-1243, December.
    20. Amir Rastpour & Armann Ingolfsson & Bora Kolfal, 2020. "Modeling Yellow and Red Alert Durations for Ambulance Systems," Production and Operations Management, Production and Operations Management Society, vol. 29(8), pages 1972-1991, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:267:y:2018:i:1:p:78-85. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.