IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v86y1995i1p4-31.html
   My bibliography  Save this article

Hierarchical structures in organisations: A conceptual framework

Author

Listed:
  • Schneewei[beta], Christoph

Abstract

No abstract is available for this item.

Suggested Citation

  • Schneewei[beta], Christoph, 1995. "Hierarchical structures in organisations: A conceptual framework," European Journal of Operational Research, Elsevier, vol. 86(1), pages 4-31, October.
  • Handle: RePEc:eee:ejores:v:86:y:1995:i:1:p:4-31
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0377-2217(95)00058-X
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Gabriel R. Bitran & Elizabeth A. Haas & Arnoldo C. Hax, 1981. "Hierarchical Production Planning: A Single Stage System," Operations Research, INFORMS, vol. 29(4), pages 717-743, August.
    2. Pesenti, Raffaele, 1995. "Hierarchical resource planning for shipping companies," European Journal of Operational Research, Elsevier, vol. 86(1), pages 91-102, October.
    3. Gfrerer, Helmut & Zapfel, Gunther, 1995. "Hierarchical model for production planning in the case of uncertain demand," European Journal of Operational Research, Elsevier, vol. 86(1), pages 142-161, October.
    4. George B. Dantzig & Philip Wolfe, 1960. "Decomposition Principle for Linear Programs," Operations Research, INFORMS, vol. 8(1), pages 101-111, February.
    5. Sohner, Volkmar & Schneeweiss, Christoph, 1995. "Hierarchically integrated lot size optimization," European Journal of Operational Research, Elsevier, vol. 86(1), pages 73-90, October.
    6. Fai[beta]t, J. & Schneewei[beta], Ch. & Wolf, F., 1991. "A hierarchically structured decision-support-system for demand-oriented shift planning," International Journal of Production Economics, Elsevier, vol. 23(1-3), pages 89-98, October.
    7. Goedhart, Marc H. & Spronk, Jaap, 1995. "An interactive heuristic for financial planning in decentralized organizations," European Journal of Operational Research, Elsevier, vol. 86(1), pages 162-175, October.
    8. Stephen C. Graves, 1982. "Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems," Management Science, INFORMS, vol. 28(3), pages 260-275, March.
    9. Schneeweiss, Ch., 1987. "On a formalisation of the process of quantitative model building," European Journal of Operational Research, Elsevier, vol. 29(1), pages 24-41, April.
    10. Carravilla, Maria Antonia & de Sousa, Jorge Pinho, 1995. "Hierarchical production planning in a make-to-order company: A case study," European Journal of Operational Research, Elsevier, vol. 86(1), pages 43-56, October.
    11. Corbett, Charles J. & Debets, Frank J.C. & Van Wassenhove, Luk N., 1995. "Decentralization of responsibility for site decontamination projects: A budget allocation approach," European Journal of Operational Research, Elsevier, vol. 86(1), pages 103-119, October.
    12. Wild, Bernhard & Schneewei, Christoph, 1993. "Manpower capacity planning -- A hierarchical approach," International Journal of Production Economics, Elsevier, vol. 30(1), pages 95-106, July.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Xue, Guisen & Felix Offodile, O. & Zhou, Hong & Troutt, Marvin D., 2011. "Integrated production planning with sequence-dependent family setup times," International Journal of Production Economics, Elsevier, vol. 131(2), pages 674-681, June.
    2. Cros, M. J. & Duru, M. & Garcia, F. & Martin-Clouaire, R., 2004. "Simulating management strategies: the rotational grazing example," Agricultural Systems, Elsevier, vol. 80(1), pages 23-42, April.
    3. Schneeweiss, Ch. & Schneider, H., 1999. "Measuring and designing flexibility as a generalized service degree," European Journal of Operational Research, Elsevier, vol. 112(1), pages 98-106, January.
    4. Paulli, Jan, 1995. "A hierarchical approach for the FMS scheduling problem," European Journal of Operational Research, Elsevier, vol. 86(1), pages 32-42, October.
    5. Farahani, Poorya & Grunow, Martin & Akkerman, Renzo, 2013. "Design and operations planning of municipal foodservice systems," International Journal of Production Economics, Elsevier, vol. 144(1), pages 383-396.
    6. R. Vetschera, 1998. "The Value of Preference Information in Agency Relationships," Working Papers ir98107, International Institute for Applied Systems Analysis.
    7. Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
    8. Wernz, Christian & Deshmukh, Abhijit, 2012. "Unifying temporal and organizational scales in multiscale decision-making," European Journal of Operational Research, Elsevier, vol. 223(3), pages 739-751.
    9. Ozdamar, Linet & Bozyel, M. Ali & Birbil, S. Ilker, 1998. "A hierarchical decision support system for production planning (with case study)," European Journal of Operational Research, Elsevier, vol. 104(3), pages 403-422, February.
    10. Selcuk, B. & Fransoo, J.C. & De Kok, A.G., 2006. "The effect of updating lead times on the performance of hierarchical planning systems," International Journal of Production Economics, Elsevier, vol. 104(2), pages 427-440, December.
    11. Goedhart, Marc H. & Spronk, Jaap, 1995. "An interactive heuristic for financial planning in decentralized organizations," European Journal of Operational Research, Elsevier, vol. 86(1), pages 162-175, October.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Tom Vogel & Bernardo Almada-Lobo & Christian Almeder, 2017. "Integrated versus hierarchical approach to aggregate production planning and master production scheduling," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 193-229, January.
    2. Vicens, E. & Alemany, M. E. & Andres, C. & Guarch, J. J., 2001. "A design and application methodology for hierarchical production planning decision support systems in an enterprise integration context," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 5-20, December.
    3. Schneeweiss, Christoph, 2003. "Distributed decision making--a unified approach," European Journal of Operational Research, Elsevier, vol. 150(2), pages 237-252, October.
    4. Barbarosoglu, Gulay & Ozgur, Demet, 1999. "Hierarchical design of an integrated production and 2-echelon distribution system," European Journal of Operational Research, Elsevier, vol. 118(3), pages 464-484, November.
    5. Samaddar, Subhashish & Rabinowitz, Gad & Zhang, Guoqiang Peter, 2005. "An experimental analysis of solution performance in a resource sharing and scheduling problem," European Journal of Operational Research, Elsevier, vol. 165(1), pages 139-156, August.
    6. Pesenti, Raffaele, 1995. "Hierarchical resource planning for shipping companies," European Journal of Operational Research, Elsevier, vol. 86(1), pages 91-102, October.
    7. Huang, Hai-Jun & Xu, Gang, 1998. "Aggregate scheduling and network solving of multi-stage and multi-item manufacturing systems," European Journal of Operational Research, Elsevier, vol. 105(1), pages 52-65, February.
    8. Xue, Guisen & Felix Offodile, O. & Zhou, Hong & Troutt, Marvin D., 2011. "Integrated production planning with sequence-dependent family setup times," International Journal of Production Economics, Elsevier, vol. 131(2), pages 674-681, June.
    9. Jaya Singhal & Kalyan Singhal, 2008. "A Noniterative Algorithm for the Linear-Quadratic Profit-Maximization Model for Smoothing Multiproduct Production," INFORMS Journal on Computing, INFORMS, vol. 20(2), pages 169-178, May.
    10. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    11. Tian, Feng & Willems, Sean P. & Kempf, Karl G., 2011. "An iterative approach to item-level tactical production and inventory planning," International Journal of Production Economics, Elsevier, vol. 133(1), pages 439-450, September.
    12. Wu, Lingxiao & Wang, Shuaian & Laporte, Gilbert, 2021. "The Robust Bulk Ship Routing Problem with Batched Cargo Selection," Transportation Research Part B: Methodological, Elsevier, vol. 143(C), pages 124-159.
    13. Ozdamar, Linet & Bozyel, M. Ali & Birbil, S. Ilker, 1998. "A hierarchical decision support system for production planning (with case study)," European Journal of Operational Research, Elsevier, vol. 104(3), pages 403-422, February.
    14. A. Ruszczynski, 1993. "Regularized Decomposition of Stochastic Programs: Algorithmic Techniques and Numerical Results," Working Papers wp93021, International Institute for Applied Systems Analysis.
    15. Ethem Çanakoğlu & İbrahim Muter & Tevfik Aytekin, 2021. "Integrating Individual and Aggregate Diversity in Top- N Recommendation," INFORMS Journal on Computing, INFORMS, vol. 33(1), pages 300-318, January.
    16. Ogbe, Emmanuel & Li, Xiang, 2017. "A new cross decomposition method for stochastic mixed-integer linear programming," European Journal of Operational Research, Elsevier, vol. 256(2), pages 487-499.
    17. Sankaran, Jayaram K., 1995. "Column generation applied to linear programs in course registration," European Journal of Operational Research, Elsevier, vol. 87(2), pages 328-342, December.
    18. Metrane, Abdelmoutalib & Soumis, François & Elhallaoui, Issmail, 2010. "Column generation decomposition with the degenerate constraints in the subproblem," European Journal of Operational Research, Elsevier, vol. 207(1), pages 37-44, November.
    19. Belanger, Nicolas & Desaulniers, Guy & Soumis, Francois & Desrosiers, Jacques, 2006. "Periodic airline fleet assignment with time windows, spacing constraints, and time dependent revenues," European Journal of Operational Research, Elsevier, vol. 175(3), pages 1754-1766, December.
    20. Gahm, Christian & Uzunoglu, Aykut & Wahl, Stefan & Ganschinietz, Chantal & Tuma, Axel, 2022. "Applying machine learning for the anticipation of complex nesting solutions in hierarchical production planning," European Journal of Operational Research, Elsevier, vol. 296(3), pages 819-836.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:86:y:1995:i:1:p:4-31. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.