IDEAS home Printed from https://ideas.repec.org/a/bjc/journl/v05y2018i10p72-86.html
   My bibliography  Save this article

Using Artificial Neural Networks to Model Cost Overruns in Real Estate Projects

Author

Listed:
  • Kareem Mohammad Mahmoud Mostafa

    (Civil Engineering Program, Faculty of Engineering and Material Sciences, The German University In Cairo, Cairo, Egypt)

  • Dr. Ayman Hamdy Nassar

    (Civil Engineering Program, Faculty of Engineering and Material Sciences, The German University In Cairo, Cairo, Egypt)

Abstract

Cost overrun is one of the most important problems and risks that encounter Real Estate projects success, since it reduces the contractor’s profit and sometimes lead to enormous losses, and leaving the project in great troubles. Construction cost is one of the peak criteria of success for a real estate project throughout its lifecycle and is of high concern to those who are involved in the real estate industry. All real estate projects, regardless of their size, complexity are saddled by targets and uncertainties. Mostly in developing countries real estate projects are characterized by overruns in cost. Cost overruns occur in every real estate project while the magnitude varies significantly from project to project. This leads to severe need of addressing the acute issue of cost overrun. Throughout this research we tried to gather and analyze the main factors which cause cost overruns in real estate projects. According to past researches the factors determining percentage overrun include the financial condition of the owner , the cash flow of the contractor, material cost increase, competition at tender stage, fluctuation in the currency that payments will be made by, the project size, delays in design approval, quantity variations, the detailed degree of the drawings used for estimating the budget, , material estimate accuracy, quality requirements being hard to reach, design changes, location of the project with respect to vendors, time needed for decisions to be made, what was known about the project at tender stage, the client’s characteristics, unknown geological conditions, ignorance and lack of knowledge of the parties, suitability of the project schedule to the project, conflict among participants in the project, design complexity, scope change by the owner, incompatible advanced payment, the prequalification of the contractor, workload in the project, the contract type , whether the parties agreed on dispute settlement procedure or not, the inspection and testing procedures , whether the site was properly managed or not , the adequacy of the equipment used in the project, the adequacy of the safety procedures followed, the experience of the contractor in similar projects, site access ease by the contractor, the effectiveness of the planning and scheduling , the availability of equipment, delay in arrival of material, shortage of labors, whether the labors used were skilled or not, the adequacy of the method of construction, the decreased productivity of labors and equipment, the availability of cost control engineers assigned for the project, the category of the contractor and finally the method of procurement. Two Questionnaires were created to determine the probability and impact of each factor and hence rank the factors according to Relative importance index besides determining the percentage overrun each factor could cause according to practitioners in the field of real estate. Not to mention, data of real projects which encountered overruns were included. Using Artificial Neural networks which is a branch of Artificial Intelligence, a model was developed including the 43 factors which can predict the percentage overrun for real estate project. The model was later tested by one of the projects and the variance between the actual overrun and the predicted overrun was calculated.

Suggested Citation

  • Kareem Mohammad Mahmoud Mostafa & Dr. Ayman Hamdy Nassar, 2018. "Using Artificial Neural Networks to Model Cost Overruns in Real Estate Projects," International Journal of Research and Scientific Innovation, International Journal of Research and Scientific Innovation (IJRSI), vol. 5(10), pages 72-86, October.
  • Handle: RePEc:bjc:journl:v:05:y:2018:i:10:p:72-86
    as

    Download full text from publisher

    File URL: https://www.rsisinternational.org/journals/ijrsi/digital-library/volume-5-issue-10/72-86.pdf
    Download Restriction: no

    File URL: https://rsisinternational.org/virtual-library/papers/using-artificial-neural-networks-to-model-cost-overruns-in-real-estate-projects/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Yakubu Adisa Olawale & Ming Sun, 2010. "Cost and time control of construction projects: inhibiting factors and mitigating measures in practice," Construction Management and Economics, Taylor & Francis Journals, vol. 28(5), pages 509-526.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Nyoni, Thabani, 2019. "Cost overrun factors in construction industry: a case of Zimbabwe," MPRA Paper 96788, University Library of Munich, Germany.
    2. Petter Osmundsen & Kristin Helen Roll, 2016. "Rig Rates and Drilling Speed: Reinforcing Effects," CESifo Working Paper Series 5895, CESifo.
    3. Patrick Uwineza & Jean de Dieu Dushimimana, 2022. "Project Management Practices And Effectiveness Of Private Radio Station’S Projects A Case Of Selected Projects Of Energy Radio, In Musanze District, Rwanda (2017-2020)," Working papers 2022-42-08, Voice of Research.
    4. Jin Woo Won & Wooyong Jung & Seung Heon Han & Sungmin Yun & Bonsang Koo, 2019. "What Enables a High-Risk Project to Yield High Return from a Construction Contractor’s Perspective?," Sustainability, MDPI, vol. 11(21), pages 1-17, October.
    5. Byung-Yun Son & Eul-Bum Lee, 2019. "Using Text Mining to Estimate Schedule Delay Risk of 13 Offshore Oil and Gas EPC Case Studies During the Bidding Process," Energies, MDPI, vol. 12(10), pages 1-25, May.
    6. Zakari Mustapha & Benjamin Boahene Akomah & Samuel Kwame Ansah, 2023. "Construction Projects Success: Time, Cost, Quality and Safety," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 7(9), pages 680-688, September.
    7. Shahab Shoar & Nicholas Chileshe, 2021. "Exploring the Causes of Design Changes in Building Construction Projects: An Interpretive Structural Modeling Approach," Sustainability, MDPI, vol. 13(17), pages 1-23, August.
    8. Giuliano Marella & Valentina Antoniucci, 2019. "Time Overrun in Public Works—Evidence from North-East Italy," Sustainability, MDPI, vol. 11(24), pages 1-17, December.
    9. Shenzhe Jiang & Junjie Xia & Jiajun Xu & Jianye Yan, 2023. "A theory of National Development Bank: long-term investment and the agency problem," Economic Theory, Springer;Society for the Advancement of Economic Theory (SAET), vol. 76(3), pages 995-1024, October.
    10. Francisco Pinheiro Catalão & Carlos Oliveira Cruz & Joaquim Miranda Sarmento, 2023. "The entanglement of time and cost deviations in public projects," Annals of Public and Cooperative Economics, Wiley Blackwell, vol. 94(1), pages 241-272, March.
    11. Øglend, Atle & Osmundsen, Petter & Lorentzen, Sindre, 2016. "Cost Overrun at the Norwegian Continental Shelf: The element of surprise," UiS Working Papers in Economics and Finance 2016/3, University of Stavanger.
    12. Myung-Hun Kim & Eul-Bum Lee & Han-Suk Choi, 2019. "A Forecast and Mitigation Model of Construction Performance by Assessing Detailed Engineering Maturity at Key Milestones for Offshore EPC Mega-Projects," Sustainability, MDPI, vol. 11(5), pages 1-21, February.
    13. repec:eur:ejfejr:49 is not listed on IDEAS
    14. Temitope Seun Omotayo & Bankole Awuzie & Valerie Kenechukwu Obi & Saheed Ajayi & Lovelin Ifeoma Obi & Oluyomi Osobajo & Adekunle Oke, 2022. "The System Dynamics Analysis of Cost Overrun Causations in UK Rail Projects in a COVID-19 Epidemic Era," SAGE Open, , vol. 12(2), pages 21582440221, May.
    15. Hemanta Doloi & Anil Sawhney & K.C. Iyer, 2012. "Structural equation model for investigating factors affecting delay in Indian construction projects," Construction Management and Economics, Taylor & Francis Journals, vol. 30(10), pages 869-884, October.
    16. repec:eur:ejfejr:4 is not listed on IDEAS

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bjc:journl:v:05:y:2018:i:10:p:72-86. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Renu Malsaria (email available below). General contact details of provider: https://rsisinternational.org/journals/ijrsi/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.