Construction Projects Success: Time, Cost, Quality and Safety

Author

Listed:
  • Zakari Mustapha

    (Department of Construction Technology and Management, School of Built and Natural Environment, Cape Coast Technical University, Cape Coast. Ghana.)

  • Benjamin Boahene Akomah

    (Department of Construction Technology and Management, School of Built and Natural Environment, Cape Coast Technical University, Cape Coast. Ghana.)

  • Samuel Kwame Ansah

    (Department of Construction Technology and Management, School of Built and Natural Environment, Cape Coast Technical University, Cape Coast. Ghana.)

Abstract

The construction industry is complex, and its success depends on time, cost, and project quality. The study sought to investigate construction project success in relation to time, cost, quality, and safety on construction projects in the Ashanti Regions of Ghana. A structured questionnaire was administered among construction professionals (architects, contractors, engineers, and quantity surveyors) within the study area. The findings showed delays in payments of works executed, forceful layoff, and suspension of construction works adversely affected construction time. The construction project cost was attributed to delays in payment to contractors, poor client cash flow, and high cost of plant and equipment. Quality of work was ascribed to poor coordination among workers and frequent absenteeism of skilled workers. It was concluded that governments should provide financial support to construction companies to clear backlogs of unpaid debts to workers. Clients should liaise with contractors to reschedule uncompleted projects (payment plans and added time for the completion of works). Construction companies should provide adequate personal protective equipment (PPE) to minimise on-site health-related hazards.

Suggested Citation

  • Zakari Mustapha & Benjamin Boahene Akomah & Samuel Kwame Ansah, 2023. "Construction Projects Success: Time, Cost, Quality and Safety," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 7(9), pages 680-688, September.
  • Handle: RePEc:bcp:journl:v:7:y:2023:i:9:p:680-688
    as

    Download full text from publisher

    File URL: https://www.rsisinternational.org/journals/ijriss/Digital-Library/volume-7-issue-9/680-688.pdf
    Download Restriction: no

    File URL: https://www.rsisinternational.org/journals/ijriss/articles/construction-projects-success-time-cost-quality-and-safety/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Nkechi Owoo & Monica P. Lambon-Quayefio, 2018. "The role of the construction sector in Ghana," WIDER Working Paper Series wp-2018-119, World Institute for Development Economic Research (UNU-WIDER).
    2. Yakubu Adisa Olawale & Ming Sun, 2010. "Cost and time control of construction projects: inhibiting factors and mitigating measures in practice," Construction Management and Economics, Taylor & Francis Journals, vol. 28(5), pages 509-526.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Shenzhe Jiang & Junjie Xia & Jiajun Xu & Jianye Yan, 2023. "A theory of National Development Bank: long-term investment and the agency problem," Economic Theory, Springer;Society for the Advancement of Economic Theory (SAET), vol. 76(3), pages 995-1024, October.
    2. Francisco Pinheiro Catalão & Carlos Oliveira Cruz & Joaquim Miranda Sarmento, 2023. "The entanglement of time and cost deviations in public projects," Annals of Public and Cooperative Economics, Wiley Blackwell, vol. 94(1), pages 241-272, March.
    3. Øglend, Atle & Osmundsen, Petter & Lorentzen, Sindre, 2016. "Cost Overrun at the Norwegian Continental Shelf: The element of surprise," UiS Working Papers in Economics and Finance 2016/3, University of Stavanger.
    4. Myung-Hun Kim & Eul-Bum Lee & Han-Suk Choi, 2019. "A Forecast and Mitigation Model of Construction Performance by Assessing Detailed Engineering Maturity at Key Milestones for Offshore EPC Mega-Projects," Sustainability, MDPI, vol. 11(5), pages 1-21, February.
    5. repec:eur:ejfejr:49 is not listed on IDEAS
    6. Martina Kirchberger, 2018. "The role of the construction sector," WIDER Working Paper Series wp-2018-146, World Institute for Development Economic Research (UNU-WIDER).
    7. Nyoni, Thabani, 2019. "Cost overrun factors in construction industry: a case of Zimbabwe," MPRA Paper 96788, University Library of Munich, Germany.
    8. Petter Osmundsen & Kristin Helen Roll, 2016. "Rig Rates and Drilling Speed: Reinforcing Effects," CESifo Working Paper Series 5895, CESifo.
    9. Temitope Seun Omotayo & Bankole Awuzie & Valerie Kenechukwu Obi & Saheed Ajayi & Lovelin Ifeoma Obi & Oluyomi Osobajo & Adekunle Oke, 2022. "The System Dynamics Analysis of Cost Overrun Causations in UK Rail Projects in a COVID-19 Epidemic Era," SAGE Open, , vol. 12(2), pages 21582440221, May.
    10. Patrick Uwineza & Jean de Dieu Dushimimana, 2022. "Project Management Practices And Effectiveness Of Private Radio Station’S Projects A Case Of Selected Projects Of Energy Radio, In Musanze District, Rwanda (2017-2020)," Working papers 2022-42-08, Voice of Research.
    11. Jin Woo Won & Wooyong Jung & Seung Heon Han & Sungmin Yun & Bonsang Koo, 2019. "What Enables a High-Risk Project to Yield High Return from a Construction Contractor’s Perspective?," Sustainability, MDPI, vol. 11(21), pages 1-17, October.
    12. Kareem Mohammad Mahmoud Mostafa & Dr. Ayman Hamdy Nassar, 2018. "Using Artificial Neural Networks to Model Cost Overruns in Real Estate Projects," International Journal of Research and Scientific Innovation, International Journal of Research and Scientific Innovation (IJRSI), vol. 5(10), pages 72-86, October.
    13. Kasimu Ssenyange, 2023. "The Impact of Leadership Styles on Government Construction Project Success: A Structural Equation Modelling Approach," International Journal of Finance, Insurance and Risk Management, International Journal of Finance, Insurance and Risk Management, vol. 13(3), pages 50-75.
    14. Hemanta Doloi & Anil Sawhney & K.C. Iyer, 2012. "Structural equation model for investigating factors affecting delay in Indian construction projects," Construction Management and Economics, Taylor & Francis Journals, vol. 30(10), pages 869-884, October.
    15. repec:eur:ejfejr:4 is not listed on IDEAS
    16. Byung-Yun Son & Eul-Bum Lee, 2019. "Using Text Mining to Estimate Schedule Delay Risk of 13 Offshore Oil and Gas EPC Case Studies During the Bidding Process," Energies, MDPI, vol. 12(10), pages 1-25, May.
    17. Shahab Shoar & Nicholas Chileshe, 2021. "Exploring the Causes of Design Changes in Building Construction Projects: An Interpretive Structural Modeling Approach," Sustainability, MDPI, vol. 13(17), pages 1-23, August.
    18. Giuliano Marella & Valentina Antoniucci, 2019. "Time Overrun in Public Works—Evidence from North-East Italy," Sustainability, MDPI, vol. 11(24), pages 1-17, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bcp:journl:v:7:y:2023:i:9:p:680-688. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Dr. Pawan Verma (email available below). General contact details of provider: https://rsisinternational.org/journals/ijriss/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.