My bibliography
Save this item
Performance Analysis and Optimization of Assemble-to-Order Systems with Random Lead Times
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Boute, Robert N. & Disney, Stephen M. & Lambrecht, Marc R. & Van Houdt, Benny, 2007. "An integrated production and inventory model to dampen upstream demand variability in the supply chain," European Journal of Operational Research, Elsevier, vol. 178(1), pages 121-142, April.
- Lin, Cheng-Chang & Wu, Yi-Chen, 2013. "Optimal pricing for build-to-order supply chain design under price-dependent stochastic demand," Transportation Research Part B: Methodological, Elsevier, vol. 56(C), pages 31-49.
- Mustafa K. Doğru & Martin I. Reiman & Qiong Wang, 2010. "A Stochastic Programming Based Inventory Policy for Assemble-to-Order Systems with Application to the W Model," Operations Research, INFORMS, vol. 58(4-part-1), pages 849-864, August.
- Gao, Chunyan & Shen, Houcai & Cheng, T.C.E., 2010. "Order-fulfillment performance analysis of an assemble-to-order system with unreliable machines," International Journal of Production Economics, Elsevier, vol. 126(2), pages 341-349, August.
- Savas Dayanik & Jing-Sheng Song & Susan H. Xu, 2003. "The Effectiveness of Several Performance Bounds for Capacitated Production, Partial-Order-Service, Assemble-to-Order Systems," Manufacturing & Service Operations Management, INFORMS, vol. 5(3), pages 230-251, December.
- Güllü, Refik & Köksalan, Murat, 2013. "A model for performance evaluation and stock optimization in a kit management problem," International Journal of Production Economics, Elsevier, vol. 143(2), pages 527-535.
- Lin, Cheng-Chang & Wang, Tsai-Hsin, 2011. "Build-to-order supply chain network design under supply and demand uncertainties," Transportation Research Part B: Methodological, Elsevier, vol. 45(8), pages 1162-1176, September.
- van Jaarsveld, Willem & Dollevoet, Twan & Dekker, Rommert, 2015. "Improving spare parts inventory control at a repair shop," Omega, Elsevier, vol. 57(PB), pages 217-229.
- Mohebbi, E. & Choobineh, F., 2005. "The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty," Omega, Elsevier, vol. 33(6), pages 472-482, December.
- Dreyfuss, Michael & Giat, Yahel, 2017. "Optimal spares allocation to an exchangeable-item repair system with tolerable wait," European Journal of Operational Research, Elsevier, vol. 261(2), pages 584-594.
- Yingdong Lu & Jing-Sheng Song & Yao Zhao, 2010. "No-Holdback Allocation Rules for Continuous-Time Assemble-to-Order Systems," Operations Research, INFORMS, vol. 58(3), pages 691-705, June.
- Guo Li & Mengqi Liu & Xu Guan, 2017. "Diversity of payment contracts in a decentralized assembly system," Annals of Operations Research, Springer, vol. 257(1), pages 613-639, October.
- Li, Na & Zhang, Mike Tao & Deng, Shiming & Lee, Zu-Hsu & Zhang, Lawrence & Zheng, Li, 2007. "Single-station performance evaluation and improvement in semiconductor manufacturing: A graphical approach," International Journal of Production Economics, Elsevier, vol. 107(2), pages 397-403, June.
- Hoen, K.M.R. & Güllü, R. & van Houtum, G.J. & Vliegen, I.M.H., 2011. "A simple and accurate approximation for the order fill rates in lost-sales Assemble-to-Order systems," International Journal of Production Economics, Elsevier, vol. 133(1), pages 95-104, September.
- Yao Zhao, 2008. "Evaluation and Optimization of Installation Base-Stock Policies in Supply Chains with Compound Poisson Demand," Operations Research, INFORMS, vol. 56(2), pages 437-452, April.
- Michael Dreyfuss & Alan Stulman, 2018. "Waiting time distribution for an exchangeable item repair system with up to two failed components," Annals of Operations Research, Springer, vol. 261(1), pages 167-184, February.
- Woonghee Tim Huh & Ganesh Janakiraman, 2010. "Base‐stock policies in capacitated assembly systems: Convexity properties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 57(2), pages 109-118, March.
- Garg, D. & Narahari, Y. & Viswanadham, N., 2006. "Achieving sharp deliveries in supply chains through variance pool allocation," European Journal of Operational Research, Elsevier, vol. 171(1), pages 227-254, May.
- Cheung, Ki Ling & Song, Jing-Sheng & Zhang, Yue, 2017. "Cost reduction through operations reversal," European Journal of Operational Research, Elsevier, vol. 259(1), pages 100-112.
- Pan, Wenting & So, Kut C. & Xiao, Guang, 2022. "Benefits of backup sourcing for components in assembly systems under supply uncertainty," European Journal of Operational Research, Elsevier, vol. 302(1), pages 158-171.
- Kai Huang, 2014. "Benchmarking non-first-come-first-served component allocation in an assemble-to-order system," Annals of Operations Research, Springer, vol. 223(1), pages 217-237, December.
- Jie Chu & Kai Huang, 2020. "Integrating decisions with advance supply information in an assemble‐to‐order system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 67(1), pages 34-44, February.
- Yao Zhao & David Simchi-Levi, 2006. "Performance Analysis and Evaluation of Assemble-to-Order Systems with Stochastic Sequential Lead Times," Operations Research, INFORMS, vol. 54(4), pages 706-724, August.
- Xu Guan & Guo Li & Zhe Yin, 2016. "The implication of time-based payment contract in the decentralized assembly system," Annals of Operations Research, Springer, vol. 240(2), pages 641-659, May.
- Liu, Liming & Xu, He & Zhu, Stuart X., 2020. "Push verse pull: Inventory-leadtime tradeoff for managing system variability," European Journal of Operational Research, Elsevier, vol. 287(1), pages 119-132.
- Robert N. Boute & Marc R. Lambrecht & Benny Van Houdt, 2007. "Performance evaluation of a production/inventory system with periodic review and endogenous lead times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(4), pages 462-473, June.
- Jiri Chod & David Pyke & Nils Rudi, 2010. "The Value of Flexibility in Make-to-Order Systems: The Effect of Demand Correlation," Operations Research, INFORMS, vol. 58(4-part-1), pages 834-848, August.
- Albrecht, Martin, 2014. "Determining near optimal base-stock levels in two-stage general inventory systems," European Journal of Operational Research, Elsevier, vol. 232(2), pages 342-349.
- Feng Cheng* & Markus Ettl & Yingdong Lu & David D. Yao, 2012. "A Production–Inventory Model for a Push–Pull Manufacturing System with Capacity and Service Level Constraints," Production and Operations Management, Production and Operations Management Society, vol. 21(4), pages 668-681, July.
- Jing-Sheng Song & Yao Zhao, 2009. "The Value of Component Commonality in a Dynamic Inventory System with Lead Times," Manufacturing & Service Operations Management, INFORMS, vol. 11(3), pages 493-508, March.
- Jing-Sheng Song & Hanqin Zhang & Yumei Hou & Mingzheng Wang, 2010. "The Effect of Lead Time and Demand Uncertainties in ( r, q ) Inventory Systems," Operations Research, INFORMS, vol. 58(1), pages 68-80, February.
- Gregory A. DeCroix, 2013. "Inventory Management for an Assembly System Subject to Supply Disruptions," Management Science, INFORMS, vol. 59(9), pages 2079-2092, September.
- van Jaarsveld, W.L. & Dollevoet, T.A.B., 2011. "Spare parts inventory control for an aircraft component repair shop," Econometric Institute Research Papers EI2011-24, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Sandeep Jain & N. Raghavan, 2009. "A queuing approach for inventory planning with batch ordering in multi-echelon supply chains," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 17(1), pages 95-110, March.
- Sleptchenko, Andrei & Al Hanbali, Ahmad & Zijm, Henk, 2018. "Joint planning of service engineers and spare parts," European Journal of Operational Research, Elsevier, vol. 271(1), pages 97-108.
- Hernan Caceres & Dongchen Yu & Alexander Nikolaev, 2018. "Evaluating shortfall distributions in periodic inventory systems with stochastic endogenous demands and lead-times," Annals of Operations Research, Springer, vol. 271(2), pages 405-427, December.
- Wenting Pan & Kut C. So, 2010. "TECHNICAL NOTE---Optimal Product Pricing and Component Production Quantities for an Assembly System Under Supply Uncertainty," Operations Research, INFORMS, vol. 58(6), pages 1792-1797, December.
- Lijian Lu & Jing‐Sheng Song & Hanqin Zhang, 2015. "Optimal and asymptotically optimal policies for assemble‐to‐order n‐ and W‐systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(8), pages 617-645, December.
- Susan H. Xu & Zhaolin Li, 2007. "Managing a Single-Product Assemble-to-Order System with Technology Innovations," Management Science, INFORMS, vol. 53(9), pages 1467-1485, September.
- Gunasekaran, Angappa & Ngai, Eric W.T., 2009. "Modeling and analysis of build-to-order supply chains," European Journal of Operational Research, Elsevier, vol. 195(2), pages 319-334, June.
- Afshin Mansouri, S. & Gallear, David & Askariazad, Mohammad H., 2012. "Decision support for build-to-order supply chain management through multiobjective optimization," International Journal of Production Economics, Elsevier, vol. 135(1), pages 24-36.
- Willem van Jaarsveld & Alan Scheller-Wolf, 2015. "Optimization of Industrial-Scale Assemble-to-Order Systems," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 544-560, August.
- Sanajian, Nima & BalcIog[small tilde]lu, BarIs, 2009. "The impact of production time variability on make-to-stock queue performance," European Journal of Operational Research, Elsevier, vol. 194(3), pages 847-855, May.
- Albrecht, Martin, 2017. "Optimization of safety stocks in models with an order service level objective or constraint," European Journal of Operational Research, Elsevier, vol. 263(3), pages 900-909.
- Zhan Pang & Frank Y. Chen & Youyi Feng, 2012. "Technical Note---A Note on the Structure of Joint Inventory-Pricing Control with Leadtimes," Operations Research, INFORMS, vol. 60(3), pages 581-587, June.
- Karaarslan, A.G. & Kiesmüller, G.P. & de Kok, A.G., 2013. "Analysis of an assemble-to-order system with different review periods," International Journal of Production Economics, Elsevier, vol. 143(2), pages 335-341.
- Yingdong Lu & Jing-Sheng Song, 2005. "Order-Based Cost Optimization in Assemble-to-Order Systems," Operations Research, INFORMS, vol. 53(1), pages 151-169, February.
- Cheng, T.C.E. & Gao, Chunyan & Shen, Houcai, 2011. "Production planning and inventory allocation of a single-product assemble-to-order system with failure-prone machines," International Journal of Production Economics, Elsevier, vol. 131(2), pages 604-617, June.
- Yingdong Lu, 2007. "Estimation of average backorders for an assemble‐to‐order system with random batch demands through extreme statistics," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(1), pages 33-45, February.
- Yingdong Lu & Jing-Sheng Song & David D. Yao, 2003. "Order Fill Rate, Leadtime Variability, and Advance Demand Information in an Assemble-to-Order System," Operations Research, INFORMS, vol. 51(2), pages 292-308, April.
- Alexandar Angelus & Evan L. Porteus, 2008. "An Asset Assembly Problem," Operations Research, INFORMS, vol. 56(3), pages 665-680, June.
- Dreyfuss, Michael & Giat, Yahel, 2019. "Allocating spares to maximize the window fill rate in a periodic review inventory system," International Journal of Production Economics, Elsevier, vol. 214(C), pages 151-162.