IDEAS home Printed from https://ideas.repec.org/a/spr/annopr/v240y2016i2d10.1007_s10479-014-1579-5.html
   My bibliography  Save this article

The implication of time-based payment contract in the decentralized assembly system

Author

Listed:
  • Xu Guan

    (Wuhan University)

  • Guo Li

    (Beijing Institute of Technology)

  • Zhe Yin

    (Huazhong University of Science and Technology)

Abstract

This paper investigates the impact of two time-based payment contracts in an assembly system that consists of one assembler and two suppliers, in which both suppliers’ production times are stochastic. The assembler initially chooses the contract type (delay payment contract vs on-time payment contract) and the buffer time, and two suppliers have to simultaneously determine their production lead times. We find that in equilibrium, both suppliers cut down their production lead times under the delay payment contract, and this makes them worse off than that under the on-time payment contract. Differently, the delay payment contract is the assembler’s dominant option. This is because by setting the buffer time, the assembler can significantly mitigate the possible delay risk caused by the suppliers’ decentralization under the delay payment contract. It also shows that the entire supply chain achieves the same service level under either the centralized condition or the decentralized condition, regardless of the applied payment contract type. Note that these results are robustness when we extend the model into the system containing N (N $$>$$ > 2) independent suppliers.

Suggested Citation

  • Xu Guan & Guo Li & Zhe Yin, 2016. "The implication of time-based payment contract in the decentralized assembly system," Annals of Operations Research, Springer, vol. 240(2), pages 641-659, May.
  • Handle: RePEc:spr:annopr:v:240:y:2016:i:2:d:10.1007_s10479-014-1579-5
    DOI: 10.1007/s10479-014-1579-5
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10479-014-1579-5
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10479-014-1579-5?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. J.J. Liu & H. Chen, 1999. "Optimal pacing in an assembly-based multi-stage production system," Annals of Operations Research, Springer, vol. 87(0), pages 87-101, April.
    2. Güler, M. Güray & Bilgiç, Taner, 2009. "On coordinating an assembly system under random yield and random demand," European Journal of Operational Research, Elsevier, vol. 196(1), pages 342-350, July.
    3. Guiffrida, Alfred L. & Nagi, Rakesh, 2006. "Cost characterizations of supply chain delivery performance," International Journal of Production Economics, Elsevier, vol. 102(1), pages 22-36, July.
    4. Leng, Mingming & Parlar, Mahmut, 2010. "Game-theoretic analyses of decentralized assembly supply chains: Non-cooperative equilibria vs. coordination with cost-sharing contracts," European Journal of Operational Research, Elsevier, vol. 204(1), pages 96-104, July.
    5. H. Dharma Kwon & Steven A. Lippman & Kevin F. McCardle & Christopher S. Tang, 2010. "Project Management Contracts with Delayed Payments," Manufacturing & Service Operations Management, INFORMS, vol. 12(4), pages 692-707, October.
    6. Yunzeng Wang & Yigal Gerchak, 2003. "Capacity Games in Assembly Systems with Uncertain Demand," Manufacturing & Service Operations Management, INFORMS, vol. 5(3), pages 252-267, January.
    7. Andy A. Tsay, 1999. "The Quantity Flexibility Contract and Supplier-Customer Incentives," Management Science, INFORMS, vol. 45(10), pages 1339-1358, October.
    8. Tang, Ou & Grubbstrom, Robert W., 2003. "The detailed coordination problem in a two-level assembly system with stochastic lead times," International Journal of Production Economics, Elsevier, vol. 81(1), pages 415-429, January.
    9. Ananth. V. Iyer & Mark E. Bergen, 1997. "Quick Response in Manufacturer-Retailer Channels," Management Science, INFORMS, vol. 43(4), pages 559-570, April.
    10. Gurnani, Haresh & Gerchak, Yigal, 2007. "Coordination in decentralized assembly systems with uncertain component yields," European Journal of Operational Research, Elsevier, vol. 176(3), pages 1559-1576, February.
    11. Xiao, Yongbo & Chen, Jian & Lee, Chung-Yee, 2010. "Optimal decisions for assemble-to-order systems with uncertain assembly capacity," International Journal of Production Economics, Elsevier, vol. 123(1), pages 155-165, January.
    12. Yingdong Lu & Jing-Sheng Song & David D. Yao, 2003. "Order Fill Rate, Leadtime Variability, and Advance Demand Information in an Assemble-to-Order System," Operations Research, INFORMS, vol. 51(2), pages 292-308, April.
    13. Xingzheng Ai & Jing Chen & Jianhua Ma, 2012. "Contracting with demand uncertainty under supply chain competition," Annals of Operations Research, Springer, vol. 201(1), pages 17-38, December.
    14. Jing-Sheng Song & David D. Yao, 2002. "Performance Analysis and Optimization of Assemble-to-Order Systems with Random Lead Times," Operations Research, INFORMS, vol. 50(5), pages 889-903, October.
    15. James Blocher & Dilip Chhajed, 2008. "Minimizing customer order lead-time in a two-stage assembly supply chain," Annals of Operations Research, Springer, vol. 161(1), pages 25-52, July.
    16. Gérard P. Cachon & Martin A. Lariviere, 2005. "Supply Chain Coordination with Revenue-Sharing Contracts: Strengths and Limitations," Management Science, INFORMS, vol. 51(1), pages 30-44, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jiang, Zhong-Zhong & Feng, Guangqi & Yi, Zelong, 2021. "How should a capital-constrained servicizing manufacturer search for financing? The impact of supply chain leadership," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 145(C).
    2. Xu, Xinhan & Chen, Xiangfeng & Jia, Fu & Brown, Steve & Gong, Yu & Xu, Yifan, 2018. "Supply chain finance: A systematic literature review and bibliometric analysis," International Journal of Production Economics, Elsevier, vol. 204(C), pages 160-173.
    3. Jiasen Sun & Guo Li, 2020. "Designing a double auction mechanism for the re-allocation of emission permits," Annals of Operations Research, Springer, vol. 291(1), pages 847-874, August.
    4. Tao, Liangyan & Liu, Sifeng & Xie, Naiming & Javed, Saad Ahmed, 2021. "Optimal position of supply chain delivery window with risk-averse suppliers: A CVaR optimization approach," International Journal of Production Economics, Elsevier, vol. 232(C).
    5. Guo Li & Lin Li & Mengqi Liu & Suresh P. Sethi, 2020. "Impact of power structures in a subcontracting assembly system," Annals of Operations Research, Springer, vol. 291(1), pages 475-498, August.
    6. Bo He & Guo Li & Mengqi Liu, 2018. "Impacts of decision sequences on a random yield supply chain with a service level requirement," Annals of Operations Research, Springer, vol. 268(1), pages 469-495, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Guo Li & Mengqi Liu & Xu Guan, 2017. "Diversity of payment contracts in a decentralized assembly system," Annals of Operations Research, Springer, vol. 257(1), pages 613-639, October.
    2. Guo Li & Lin Li & Mengqi Liu & Suresh P. Sethi, 2020. "Impact of power structures in a subcontracting assembly system," Annals of Operations Research, Springer, vol. 291(1), pages 475-498, August.
    3. Guo Li & Hui Mao & Lei Xiao, 2017. "Impacts of Leader–Follower Structure on Pricing and Production Strategies in a Decentralized Assembly System," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(01), pages 1-24, February.
    4. Cai, Wenbo & Abdel-Malek, Layek & Hoseini, Babak & Rajaei Dehkordi, Sharareh, 2015. "Impact of flexible contracts on the performance of both retailer and supplier," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 429-444.
    5. Zhang, Dengfeng & de Matta, Renato & Lowe, Timothy J., 2010. "Channel coordination in a consignment contract," European Journal of Operational Research, Elsevier, vol. 207(2), pages 897-905, December.
    6. Sainathan, Arvind & Groenevelt, Harry, 2019. "Vendor managed inventory contracts – coordinating the supply chain while looking from the vendor’s perspective," European Journal of Operational Research, Elsevier, vol. 272(1), pages 249-260.
    7. Retsef Levi & Georgia Perakis & Cong Shi & Wei Sun, 2020. "Strategic Capacity Planning Problems in Revenue‐Sharing Joint Ventures," Production and Operations Management, Production and Operations Management Society, vol. 29(3), pages 664-687, March.
    8. Fei Ye & Qiang Lin & Yina Li, 2020. "Coordination for contract farming supply chain with stochastic yield and demand under CVaR criterion," Operational Research, Springer, vol. 20(1), pages 369-397, March.
    9. He, Yong & Zhao, Xuan & Krishnan, Harish & Jin, Shibo, 2022. "Cooperation among suppliers of complementary products in repeated interactions," International Journal of Production Economics, Elsevier, vol. 252(C).
    10. Saha, S. & Goyal, S.K., 2015. "Supply chain coordination contracts with inventory level and retail price dependent demand," International Journal of Production Economics, Elsevier, vol. 161(C), pages 140-152.
    11. Zhu, Stuart X., 2015. "Integration of capacity, pricing, and lead-time decisions in a decentralized supply chain," International Journal of Production Economics, Elsevier, vol. 164(C), pages 14-23.
    12. Yong He & Xuan Zhao, 2016. "Contracts and coordination: Supply chains with uncertain demand and supply," Naval Research Logistics (NRL), John Wiley & Sons, vol. 63(4), pages 305-319, June.
    13. Granot, Daniel & Yin, Shuya, 2007. "On sequential commitment in the price-dependent newsvendor model," European Journal of Operational Research, Elsevier, vol. 177(2), pages 939-968, March.
    14. Li, Xiang & Li, Yongjian & Cai, Xiaoqiang, 2013. "Double marginalization and coordination in the supply chain with uncertain supply," European Journal of Operational Research, Elsevier, vol. 226(2), pages 228-236.
    15. Pan, Wenting & So, Kut C. & Xiao, Guang, 2022. "Benefits of backup sourcing for components in assembly systems under supply uncertainty," European Journal of Operational Research, Elsevier, vol. 302(1), pages 158-171.
    16. Koussis, Nicos & Silaghi, Florina, 2023. "Revenue-sharing and volume flexibility in the supply chain," International Journal of Production Economics, Elsevier, vol. 261(C).
    17. Iida, Tetsuo, 2012. "Coordination of cooperative cost-reduction efforts in a supply chain partnership," European Journal of Operational Research, Elsevier, vol. 222(2), pages 180-190.
    18. Hu, Fei & Lim, Cheng-Chew & Lu, Zudi, 2013. "Coordination of supply chains with a flexible ordering policy under yield and demand uncertainty," International Journal of Production Economics, Elsevier, vol. 146(2), pages 686-693.
    19. Sabbaghi, Navid & Sheffi, Yossi & Tsitsiklis, John N., 2014. "Allocational flexibility in constrained supply chains," International Journal of Production Economics, Elsevier, vol. 153(C), pages 86-94.
    20. Caliskan Demirag, Ozgun & Xue, Weili & Wang, Jie, 2021. "Retailers’ Order Timing Strategies under Competition and Demand Uncertainty," Omega, Elsevier, vol. 101(C).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:240:y:2016:i:2:d:10.1007_s10479-014-1579-5. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.