IDEAS home Printed from https://ideas.repec.org/r/inm/oropre/v36y1988i2p229-241.html
   My bibliography  Save this item

The Role of Work-in-Process Inventory in Serial Production Lines

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Kenneth L. Schultz & David C. Juran & John W. Boudreau & John O. McClain & L. Joseph Thomas, 1998. "Modeling and Worker Motivation in JIT Production Systems," Management Science, INFORMS, vol. 44(12-Part-1), pages 1595-1607, December.
  2. Meller, Russell D. & Kim, David S., 1996. "The impact of preventive maintenance on system cost and buffer size," European Journal of Operational Research, Elsevier, vol. 95(3), pages 577-591, December.
  3. Chen-Yang Cheng & Shu-Fen Li & Chia-Leng Lee & Ranon Jientrakul & Chumpol Yuangyai, 2022. "A Comparative Study of Unbalanced Production Lines Using Simulation Modeling: A Case Study for Solar Silicon Manufacturing," Sustainability, MDPI, vol. 14(2), pages 1-15, January.
  4. Staley, Dan R. & Kim, David S., 2012. "Experimental results for the allocation of buffers in closed serial production lines," International Journal of Production Economics, Elsevier, vol. 137(2), pages 284-291.
  5. Bagchi, Tapan P. & Gupta, Jatinder N.D. & Sriskandarajah, Chelliah, 2006. "A review of TSP based approaches for flowshop scheduling," European Journal of Operational Research, Elsevier, vol. 169(3), pages 816-854, March.
  6. Sabry Shaaban & Rodrigo Romero-Silva, 2021. "Performance of merging lines with uneven buffer capacity allocation: the effects of unreliability under different inventory-related costs," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(4), pages 1253-1288, December.
  7. Lauren Xiaoyuan Lu & Jan A. Van Mieghem & R. Canan Savaskan, 2009. "Incentives for Quality Through Endogenous Routing," Manufacturing & Service Operations Management, INFORMS, vol. 11(2), pages 254-273, July.
  8. Maria Chiara Magnanini & Tullio Tolio, 2020. "Switching- and hedging- point policy for preventive maintenance with degrading machines: application to a two-machine line," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 241-271, June.
  9. Suliman, S. M. A., 2000. "A mathematical model for a buffered two-stage manufacturing cell with an unreliable transfer device," International Journal of Production Economics, Elsevier, vol. 63(1), pages 69-81, January.
  10. Opher Baron & Oded Berman & Dmitry Krass & Jianfu Wang, 2014. "Using Strategic Idleness to Improve Customer Service Experience in Service Networks," Operations Research, INFORMS, vol. 62(1), pages 123-140, February.
  11. Noa Zychlinski & Avishai Mandelbaum & Petar Momčilović, 2018. "Time-varying tandem queues with blocking: modeling, analysis, and operational insights via fluid models with reflection," Queueing Systems: Theory and Applications, Springer, vol. 89(1), pages 15-47, June.
  12. Chen, Jiaqiong & Askin, Ronald G., 2006. "Throughput maximization in serial production lines with worksharing," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 88-101, February.
  13. Christoph Müller & Martin Grunewald & Thomas S. Spengler, 2017. "Redundant configuration of automated flow lines based on “Industry 4.0”-technologies," Journal of Business Economics, Springer, vol. 87(7), pages 877-898, October.
  14. Romero-Silva, Rodrigo & Shaaban, Sabry & Marsillac, Erika & Laarraf, Zouhair, 2021. "The impact of unequal processing time variability on reliable and unreliable merging line performance," International Journal of Production Economics, Elsevier, vol. 235(C).
  15. Askin, Ronald G. & Chen, Jiaqiong, 2006. "Dynamic task assignment for throughput maximization with worksharing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 853-869, February.
  16. Kirkavak, Nureddin & Dincer, Cemal, 1999. "The general behavior of pull production systems: The allocation problems," European Journal of Operational Research, Elsevier, vol. 119(2), pages 479-494, December.
  17. Lan Luo & Charles L. Munson, 2022. "Game—Playing Goldratt’s Dice Game in Large Classes," INFORMS Transactions on Education, INFORMS, vol. 22(3), pages 195-215, May.
  18. Wallace J. Hopp & Eylem Tekin & Mark P. Van Oyen, 2004. "Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers," Management Science, INFORMS, vol. 50(1), pages 83-98, January.
  19. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2008. "Assembly line balancing: Which model to use when," International Journal of Production Economics, Elsevier, vol. 111(2), pages 509-528, February.
  20. Hadjinicola, George C. & Soteriou, Andreas C., 2003. "Reducing the cost of defects in multistage production systems: A budget allocation perspective," European Journal of Operational Research, Elsevier, vol. 145(3), pages 621-634, March.
  21. Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
  22. Cordon, Carlos, 1995. "Quality defaults and work-in-process inventory," European Journal of Operational Research, Elsevier, vol. 80(2), pages 240-251, January.
  23. Sunder Kekre & Uday S. Rao & Jayashankar M. Swaminathan & Jun Zhang, 2003. "Reconfiguring a Remanufacturing Line at Visteon, Mexico," Interfaces, INFORMS, vol. 33(6), pages 30-43, December.
  24. Payman Jula & Robert Leachman, 2008. "Coordinating decentralized local schedulers in complex supply chain manufacturing," Annals of Operations Research, Springer, vol. 161(1), pages 123-147, July.
  25. Erel, Erdal, 1998. "A study on production lines with discrete batch WIP inventory transfer," International Journal of Production Economics, Elsevier, vol. 55(1), pages 71-85, June.
  26. Theodor Freiheit & Wei Li, 2017. "The effect of work content imbalance and its interaction with scheduling method on sequential flow line performance," International Journal of Production Research, Taylor & Francis Journals, vol. 55(10), pages 2791-2805, May.
  27. Tang, Kwei & Gong, Linguo & Chang, Dong-Shang, 2003. "Optimal process control policies under a time-varying cost structure," European Journal of Operational Research, Elsevier, vol. 149(1), pages 197-210, August.
  28. Papadopoulos, H. T. & Vidalis, M. I., 2001. "Minimizing WIP inventory in reliable production lines," International Journal of Production Economics, Elsevier, vol. 70(2), pages 185-197, March.
  29. John Boudreau & Wallace Hopp & John O. McClain & L. Joseph Thomas, 2003. "On the Interface Between Operations and Human Resources Management," Manufacturing & Service Operations Management, INFORMS, vol. 5(3), pages 179-202, September.
  30. Lee, S. D. & Rung, J. M., 2000. "Production lot sizing in failure prone two-stage serial systems," European Journal of Operational Research, Elsevier, vol. 123(1), pages 42-60, May.
  31. Bertazzi, Luca, 2011. "Determining the optimal dimension of a work-in-process storage area," International Journal of Production Economics, Elsevier, vol. 131(2), pages 483-489, June.
  32. S. S. Panwalkar & Christos Koulamas, 2019. "The evolution of schematic representations of flow shop scheduling problems," Journal of Scheduling, Springer, vol. 22(4), pages 379-391, August.
  33. Betterton, Carl E. & Cox III, James F., 2009. "Espoused drum-buffer-rope flow control in serial lines: A comparative study of simulation models," International Journal of Production Economics, Elsevier, vol. 117(1), pages 66-79, January.
  34. Sachs, F.E. & Helber, S. & Kiesmüller, G.P., 2022. "Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning," European Journal of Operational Research, Elsevier, vol. 302(2), pages 544-559.
  35. Lutz, Christian M. & Roscoe Davis, K. & Sun, Minghe, 1998. "Determining buffer location and size in production lines using tabu search," European Journal of Operational Research, Elsevier, vol. 106(2-3), pages 301-316, April.
  36. Tiacci, Lorenzo, 2015. "Simultaneous balancing and buffer allocation decisions for the design of mixed-model assembly lines with parallel workstations and stochastic task times," International Journal of Production Economics, Elsevier, vol. 162(C), pages 201-215.
  37. Urban, Timothy L. & Chiang, Wen-Chyuan, 2016. "Designing energy-efficient serial production lines: The unpaced synchronous line-balancing problem," European Journal of Operational Research, Elsevier, vol. 248(3), pages 789-801.
  38. Andijani, A. A. & Anwarul, M., 1997. "Manufacturing blocking discipline: A multi-criterion approach for buffer allocations," International Journal of Production Economics, Elsevier, vol. 51(3), pages 155-163, September.
  39. Kalir, Adar A. & Sarin, Subhash C., 2009. "A method for reducing inter-departure time variability in serial production lines," International Journal of Production Economics, Elsevier, vol. 120(2), pages 340-347, August.
  40. Uday Venkatadri & Shentao Wang & Ashok Srinivasan, 2021. "A Model for Demand Planning in Supply Chains with Congestion Effects," Logistics, MDPI, vol. 5(1), pages 1-24, January.
  41. Hurley, Simon F. & Clay Whybark, D., 1999. "Inventory and capacity trade-offs in a manufacturing cell," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 203-212, March.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.