Production lot sizing in failure prone two-stage serial systems
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Leroy B. Schwarz & Linus Schrage, 1978. "Note--On Echelon Holding Costs," Management Science, INFORMS, vol. 24(8), pages 865-866, April.
- Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Lot Sizing with Machine Breakdowns," Management Science, INFORMS, vol. 38(1), pages 104-123, January.
- Panayotis Afentakis & Bezalel Gavish, 1986. "Optimal Lot-Sizing Algorithms for Complex Product Structures," Operations Research, INFORMS, vol. 34(2), pages 237-249, April.
- Jensen, Paul A. & Pakath, Ramakrishnan & Wilson, James R., 1991. "Optimal buffer inventories for multistage production systems with failures," European Journal of Operational Research, Elsevier, vol. 51(3), pages 313-326, April.
- Hong, Yushin & Seong, Deokhyun, 1993. "The analysis of an unreliable two-machine production line with random processing times," European Journal of Operational Research, Elsevier, vol. 68(2), pages 228-235, July.
- Panayotis Afentakis & Bezalel Gavish & Uday Karmarkar, 1984. "Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems," Management Science, INFORMS, vol. 30(2), pages 222-239, February.
- Derek Atkins & Maurice Queyranne & Daning Sun, 1992. "Lot Sizing Policies for Finite Production Rate Assembly Systems," Operations Research, INFORMS, vol. 40(1), pages 126-141, February.
- Heavey, C. & Papadopoulos, H. T. & Browne, J., 1993. "The throughput rate of multistation unreliable production lines," European Journal of Operational Research, Elsevier, vol. 68(1), pages 69-89, July.
- Richard Conway & William Maxwell & John O. McClain & L. Joseph Thomas, 1988. "The Role of Work-in-Process Inventory in Serial Production Lines," Operations Research, INFORMS, vol. 36(2), pages 229-241, April.
- Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Batching with Machine Breakdowns and Safety Stocks," Operations Research, INFORMS, vol. 40(5), pages 959-971, October.
- Robin O. Roundy & Daning Sun, 1994. "An Improved Algorithm for Finding Optimal Lot Sizing Policies for Finite Production Rate Assembly Systems," Operations Research, INFORMS, vol. 42(3), pages 562-565, June.
- Terry P. Harrison & Holly S. Lewis, 1996. "Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources," Management Science, INFORMS, vol. 42(1), pages 19-36, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Vickson, Raymond G. & Hassini, Elkafi, 2006. "Lot streaming for quality control in two-stage batch production," European Journal of Operational Research, Elsevier, vol. 170(3), pages 824-843, May.
- Shine-Der Lee & Chin-Ming Yang & Shu-Chuan Lan, 2016. "Economic lot sizing in a production system with random demand," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(5), pages 1142-1154, April.
- Liu, Xuejuan & Wang, Wenbin & Peng, Rui, 2015. "An integrated production, inventory and preventive maintenance model for a multi-product production system," Reliability Engineering and System Safety, Elsevier, vol. 137(C), pages 76-86.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
- Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Meller, Russell D. & Kim, David S., 1996. "The impact of preventive maintenance on system cost and buffer size," European Journal of Operational Research, Elsevier, vol. 95(3), pages 577-591, December.
- Sereshti, Narges & Adulyasak, Yossiri & Jans, Raf, 2024. "Managing flexibility in stochastic multi-level lot sizing problem with service level constraints," Omega, Elsevier, vol. 122(C).
- Mohebbi, E., 2008. "A note on a production control model for a facility with limited storage capacity in a random environment," European Journal of Operational Research, Elsevier, vol. 190(2), pages 562-570, October.
- Xiao, Yiyong & Kaku, Ikou & Zhao, Qiuhong & Zhang, Renqian, 2011. "A reduced variable neighborhood search algorithm for uncapacitated multilevel lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 214(2), pages 223-231, October.
- Chen, Chin-Tai & Yuan, John, 2004. "Transient throughput analysis for a series type system of machines in terms of alternating renewal processes," European Journal of Operational Research, Elsevier, vol. 155(1), pages 178-197, May.
- Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
- Anantaram Balakrishnan & Joseph Geunes, 2000. "Requirements Planning with Substitutions: Exploiting Bill-of-Materials Flexibility in Production Planning," Manufacturing & Service Operations Management, INFORMS, vol. 2(2), pages 166-185, January.
- Peymankar, Mahboobe & Dehghanian, Farzad & Ghiami, Yousef & Abolbashari, Mohammad Hassan, 2018. "The effects of contractual agreements on the economic production quantity model with machine breakdown," International Journal of Production Economics, Elsevier, vol. 201(C), pages 203-215.
- Papadopoulos, H. T. & Vidalis, M. I., 2001. "Minimizing WIP inventory in reliable production lines," International Journal of Production Economics, Elsevier, vol. 70(2), pages 185-197, March.
- Erenguc, S. Selcuk & Simpson, N. C. & Vakharia, Asoo J., 1999. "Integrated production/distribution planning in supply chains: An invited review," European Journal of Operational Research, Elsevier, vol. 115(2), pages 219-236, June.
- Hadjinicola, George C. & Soteriou, Andreas C., 2003. "Reducing the cost of defects in multistage production systems: A budget allocation perspective," European Journal of Operational Research, Elsevier, vol. 145(3), pages 621-634, March.
- Salameh, M. K. & Ghattas, R. E., 2001. "Optimal just-in-time buffer inventory for regular preventive maintenance," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 157-161, December.
- Jeang, Angus, 2012. "Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown," Omega, Elsevier, vol. 40(6), pages 774-781.
- Gonçalves, João N.C. & Sameiro Carvalho, M. & Cortez, Paulo, 2020. "Operations research models and methods for safety stock determination: A review," Operations Research Perspectives, Elsevier, vol. 7(C).
- Skouri, K. & Konstantaras, I. & Lagodimos, A.G. & Papachristos, S., 2014. "An EOQ model with backorders and rejection of defective supply batches," International Journal of Production Economics, Elsevier, vol. 155(C), pages 148-154.
- Chelbi, Anis & Rezg, Nidhal, 2006. "Analysis of a production/inventory system with randomly failing production unit subjected to a minimum required availability level," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 131-143, February.
- Giri, B. C. & Dohi, T., 2004. "Optimal lot sizing for an unreliable production system based on net present value approach," International Journal of Production Economics, Elsevier, vol. 92(2), pages 157-167, November.
- Viliam Makis, 1998. "Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(2), pages 165-186, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:123:y:2000:i:1:p:42-60. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.