IDEAS home Printed from https://ideas.repec.org/r/inm/oropre/v34y1986i1p91-104.html
   My bibliography  Save this item

Models for Design and Control of Stochastic, Multi-Item Batch Production Systems

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. James R. Bradley & Peter W. Glynn, 2002. "Managing Capacity and Inventory Jointly in Manufacturing Systems," Management Science, INFORMS, vol. 48(2), pages 273-288, February.
  2. Kuik, Roelof & Tielemans, Peter F. J., 1999. "Lead-time variability in a homogeneous queueing model of batching," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 435-441, March.
  3. Winands, E.M.M. & Adan, I.J.B.F. & van Houtum, G.J., 2011. "The stochastic economic lot scheduling problem: A survey," European Journal of Operational Research, Elsevier, vol. 210(1), pages 1-9, April.
  4. D. Beyer & S. P. Sethi & R. Sridhar, 2001. "Stochastic Multiproduct Inventory Models with Limited Storage," Journal of Optimization Theory and Applications, Springer, vol. 111(3), pages 553-588, December.
  5. Hau L. Lee & Kamran Moinzadeh, 1987. "Operating characteristics of a two‐echelon inventory system for repairable and consumable items under batch ordering and shipment policy," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(3), pages 365-380, June.
  6. Ki Ling Cheung & Warren H. Hausman, 2000. "An Exact Performance Evaluation for the Supplier in a Two-Echelon Inventory System," Operations Research, INFORMS, vol. 48(4), pages 646-653, August.
  7. Sushil, 2020. "Interpretive multi-criteria ranking of production systems with ordinal weights and transitive dominance relationships," Annals of Operations Research, Springer, vol. 290(1), pages 677-695, July.
  8. Van Nieuwenhuyse, Inneke & Vandaele, Nico & Rajaram, Kumar & Karmarkar, Uday S., 2007. "Buffer sizing in multi-product multi-reactor batch processes: Impact of allocation and campaign sizing policies," European Journal of Operational Research, Elsevier, vol. 179(2), pages 424-443, June.
  9. E. Carrizosa & E. Conde & M. Muñoz-Márquez, 1998. "Admission Policies in Loss Queueing Models with Heterogeneous Arrivals," Management Science, INFORMS, vol. 44(3), pages 311-320, March.
  10. Han Wu & Gerald Evans & Ki-Hwan Bae, 2016. "Production control in a complex production system using approximate dynamic programming," International Journal of Production Research, Taylor & Francis Journals, vol. 54(8), pages 2419-2432, April.
  11. Wilhelm, W. E. & Som, Pradip, 1998. "Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system," European Journal of Operational Research, Elsevier, vol. 108(1), pages 74-93, July.
  12. Seifbarghy, Mehdi & Jokar, Mohammad Reza Akbari, 2006. "Cost evaluation of a two-echelon inventory system with lost sales and approximately Poisson demand," International Journal of Production Economics, Elsevier, vol. 102(2), pages 244-254, August.
  13. Yao Zhao & Benjamin Melamed, 2006. "IPA Derivatives for Make-to-Stock Production-Inventory Systems with Backorders," Methodology and Computing in Applied Probability, Springer, vol. 8(2), pages 191-222, June.
  14. Brian T. Denton, 2009. "Practice Abstracts," Interfaces, INFORMS, vol. 39(6), pages 552-554, December.
  15. Lambrecht, Marc R. & Chen, Shaoxiang & Vandaele, Nico J., 1996. "A lot sizing model with queueing delays: The issue of safety time," European Journal of Operational Research, Elsevier, vol. 89(2), pages 269-276, March.
  16. Wagner, Michael & Smits, Sanne R., 2004. "A local search algorithm for the optimization of the stochastic economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 90(3), pages 391-402, August.
  17. Bo Li & Antonio Arreola‐Risa, 2021. "On minimizing downside risk in make‐to‐stock, risk‐averse firms," Naval Research Logistics (NRL), John Wiley & Sons, vol. 68(2), pages 199-213, March.
  18. Rong Yuan & Stephen C. Graves, 2016. "Setting optimal production lot sizes and planned lead times in a job shop," International Journal of Production Research, Taylor & Francis Journals, vol. 54(20), pages 6105-6120, October.
  19. Briskorn, Dirk & Zeise, Philipp & Packowski, Josef, 2016. "Quasi-fixed cyclic production schemes for multiple products with stochastic demand," European Journal of Operational Research, Elsevier, vol. 252(1), pages 156-169.
  20. Lopez de Haro, Santiago & Gershwin, Stanley B. & Rosenfield, Donald B., 2009. "Schedule evaluation in unstable manufacturing environments," International Journal of Production Economics, Elsevier, vol. 121(1), pages 183-194, September.
  21. S. Rajagopalan, 2002. "Make to Order or Make to Stock: Model and Application," Management Science, INFORMS, vol. 48(2), pages 241-256, February.
  22. Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
  23. Garn, Wolfgang & Aitken, James, 2015. "Agile factorial production for a single manufacturing line with multiple products," European Journal of Operational Research, Elsevier, vol. 245(3), pages 754-766.
  24. Kuik, Roelof & Tielemans, Peter F. J., 1997. "Setup utilization as a performance indicator in production planning and control," International Journal of Production Economics, Elsevier, vol. 49(2), pages 175-182, April.
  25. Kuik, Roelof & Tielemans, Peter F. J., 2004. "Expected time in system analysis of a single-machine multi-item processing center," European Journal of Operational Research, Elsevier, vol. 156(2), pages 287-304, July.
  26. Kuik, Roelof & Tielemans, Peter F. J., 1998. "Analysis of expected queueing delays for decision making in production planning," European Journal of Operational Research, Elsevier, vol. 110(3), pages 658-681, November.
  27. Lambrecht, Marc R. & Vandaele, Nico J., 1996. "A general approximation for the single product lot sizing model with queueing delays," European Journal of Operational Research, Elsevier, vol. 95(1), pages 73-88, November.
  28. Paul Glasserman & Yashan Wang, 1998. "Leadtime-Inventory Trade-Offs in Assemble-to-Order Systems," Operations Research, INFORMS, vol. 46(6), pages 858-871, December.
  29. Arreola-Risa, Antonio, 1996. "Integrated multi-item production-inventory systems," European Journal of Operational Research, Elsevier, vol. 89(2), pages 326-340, March.
  30. Thangam, A. & Uthayakumar, R., 2008. "A two-level supply chain with partial backordering and approximated Poisson demand," European Journal of Operational Research, Elsevier, vol. 187(1), pages 228-242, May.
  31. Brian Downs & Richard Metters & John Semple, 2001. "Managing Inventory with Multiple Products, Lags in Delivery, Resource Constraints, and Lost Sales: A Mathematical Programming Approach," Management Science, INFORMS, vol. 47(3), pages 464-479, March.
  32. Wu-Lin Chen, 2019. "Computing the Moments of Polling Models with Batch Poisson Arrivals by Transform Inversion," INFORMS Journal on Computing, INFORMS, vol. 31(3), pages 515-526, July.
  33. Tielemans, Peter F. J. & Kuik, Roelof, 1996. "An exploration of models that minimize leadtime through batching of arrived orders," European Journal of Operational Research, Elsevier, vol. 95(2), pages 374-389, December.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.