Practice Abstracts
Author
Abstract
Suggested Citation
DOI: 10.1287/inte.1090.0431
Download full text from publisher
References listed on IDEAS
- de Kok, A.G., 1991. "Basics of inventory management (Part 1) : Renewal theoretic background," Research Memorandum FEW 510, Tilburg University, School of Economics and Management.
- de Kok, A.G., 1991. "Basics of inventory management (Part 3) : The (b,Q)-model," Research Memorandum FEW 522, Tilburg University, School of Economics and Management.
- de Kok, A.G., 1991. "Basics of inventory management (Part 5) : The (R,b,Q)-model," Research Memorandum FEW 524, Tilburg University, School of Economics and Management.
- Paul H. Zipkin, 1986. "Models for Design and Control of Stochastic, Multi-Item Batch Production Systems," Operations Research, INFORMS, vol. 34(1), pages 91-104, February.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Janssen, Fred & de Kok, Ton, 1999. "A two-supplier inventory model," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 395-403, March.
- Roberto Rossi & S. Armagan Tarim & Ramesh Bollapragada, 2012. "Constraint-Based Local Search for Inventory Control Under Stochastic Demand and Lead Time," INFORMS Journal on Computing, INFORMS, vol. 24(1), pages 66-80, February.
- E. Carrizosa & E. Conde & M. Muñoz-Márquez, 1998. "Admission Policies in Loss Queueing Models with Heterogeneous Arrivals," Management Science, INFORMS, vol. 44(3), pages 311-320, March.
- Wilhelm, W. E. & Som, Pradip, 1998. "Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system," European Journal of Operational Research, Elsevier, vol. 108(1), pages 74-93, July.
- S. Rajagopalan, 2002. "Make to Order or Make to Stock: Model and Application," Management Science, INFORMS, vol. 48(2), pages 241-256, February.
- Paul Glasserman & Yashan Wang, 1998. "Leadtime-Inventory Trade-Offs in Assemble-to-Order Systems," Operations Research, INFORMS, vol. 46(6), pages 858-871, December.
- Arreola-Risa, Antonio, 1996. "Integrated multi-item production-inventory systems," European Journal of Operational Research, Elsevier, vol. 89(2), pages 326-340, March.
- Thangam, A. & Uthayakumar, R., 2008. "A two-level supply chain with partial backordering and approximated Poisson demand," European Journal of Operational Research, Elsevier, vol. 187(1), pages 228-242, May.
- Hau L. Lee & Kamran Moinzadeh, 1987. "Operating characteristics of a two‐echelon inventory system for repairable and consumable items under batch ordering and shipment policy," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(3), pages 365-380, June.
- Lopez de Haro, Santiago & Gershwin, Stanley B. & Rosenfield, Donald B., 2009. "Schedule evaluation in unstable manufacturing environments," International Journal of Production Economics, Elsevier, vol. 121(1), pages 183-194, September.
- Garn, Wolfgang & Aitken, James, 2015. "Agile factorial production for a single manufacturing line with multiple products," European Journal of Operational Research, Elsevier, vol. 245(3), pages 754-766.
- Kuik, Roelof & Tielemans, Peter F. J., 1997. "Setup utilization as a performance indicator in production planning and control," International Journal of Production Economics, Elsevier, vol. 49(2), pages 175-182, April.
- James R. Bradley & Peter W. Glynn, 2002. "Managing Capacity and Inventory Jointly in Manufacturing Systems," Management Science, INFORMS, vol. 48(2), pages 273-288, February.
- D. Beyer & S. P. Sethi & R. Sridhar, 2001. "Stochastic Multiproduct Inventory Models with Limited Storage," Journal of Optimization Theory and Applications, Springer, vol. 111(3), pages 553-588, December.
- Yao Zhao & Benjamin Melamed, 2006. "IPA Derivatives for Make-to-Stock Production-Inventory Systems with Backorders," Methodology and Computing in Applied Probability, Springer, vol. 8(2), pages 191-222, June.
- Lambrecht, Marc R. & Vandaele, Nico J., 1996. "A general approximation for the single product lot sizing model with queueing delays," European Journal of Operational Research, Elsevier, vol. 95(1), pages 73-88, November.
- Kuik, Roelof & Tielemans, Peter F. J., 1999. "Lead-time variability in a homogeneous queueing model of batching," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 435-441, March.
- Ki Ling Cheung & Warren H. Hausman, 2000. "An Exact Performance Evaluation for the Supplier in a Two-Echelon Inventory System," Operations Research, INFORMS, vol. 48(4), pages 646-653, August.
- Wagner, Michael & Smits, Sanne R., 2004. "A local search algorithm for the optimization of the stochastic economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 90(3), pages 391-402, August.
- Rong Yuan & Stephen C. Graves, 2016. "Setting optimal production lot sizes and planned lead times in a job shop," International Journal of Production Research, Taylor & Francis Journals, vol. 54(20), pages 6105-6120, October.
More about this item
Keywords
production scheduling; inventory planning; sequencing;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:orinte:v:39:y:2009:i:6:p:552-554. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.