IDEAS home Printed from https://ideas.repec.org/r/eee/proeco/v70y2001i3p289-292.html
   My bibliography  Save this item

The economic production quantity (EPQ) with shortage derived algebraically

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Wee, Hui-Ming & Wang, Wan-Tsu & Chung, Chun-Jen, 2009. "A modified method to compute economic order quantities without derivatives by cost-difference comparisons," European Journal of Operational Research, Elsevier, vol. 194(1), pages 336-338, April.
  2. Sarker, Bhaba R. & Rochanaluk, Ratkrit & Yi, Huizhi & Egbelu, Pius J., 2014. "An operational policy for a three-stage distributive supply chain system with retailers’ backorders," International Journal of Production Economics, Elsevier, vol. 156(C), pages 332-345.
  3. Chiu, Singa Wang, 2008. "Production lot size problem with failure in repair and backlogging derived without derivatives," European Journal of Operational Research, Elsevier, vol. 188(2), pages 610-615, July.
  4. Minner, Stefan, 2007. "A note on how to compute economic order quantities without derivatives by cost comparisons," International Journal of Production Economics, Elsevier, vol. 105(1), pages 293-296, January.
  5. Sarkar, Biswajit & Sarkar, Sumon, 2013. "An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand," Economic Modelling, Elsevier, vol. 30(C), pages 924-932.
  6. Francis Leung, Kit-Nam, 2008. "Technical note: A use of the complete squares method to solve and analyze a quadratic objective function with two decision variables exemplified via a deterministic inventory model with a mixture of b," International Journal of Production Economics, Elsevier, vol. 113(1), pages 275-281, May.
  7. Shine-Der Lee & Chin-Ming Yang & Shu-Chuan Lan, 2016. "Economic lot sizing in a production system with random demand," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(5), pages 1142-1154, April.
  8. Leung, Kit-Nam Francis, 2008. "Using the complete squares method to analyze a lot size model when the quantity backordered and the quantity received are both uncertain," European Journal of Operational Research, Elsevier, vol. 187(1), pages 19-30, May.
  9. Leung, Kit-Nam Francis, 2010. "Some comments on "A simple method to compute economic order quantities"," European Journal of Operational Research, Elsevier, vol. 201(3), pages 960-961, March.
  10. Lee, Shine-Der & Lan, Shu-Chuan, 2013. "Production lot sizing with a secondary outsourcing facility," International Journal of Production Economics, Elsevier, vol. 141(1), pages 414-424.
  11. Jason Chang, S.K. & Chuang, Jones P.C. & Chen, Hsiao-Jung, 2005. "Short comments on technical note--The EOQ and EPQ models with shortages derived without derivatives," International Journal of Production Economics, Elsevier, vol. 97(2), pages 241-243, August.
  12. Wee, Hui Ming & Chung, Chun Jen, 2007. "A note on the economic lot size of the integrated vendor-buyer inventory system derived without derivatives," European Journal of Operational Research, Elsevier, vol. 177(2), pages 1289-1293, March.
  13. Li, Jian & Wang, Shouyang & Cheng, T.C. Edwin, 2008. "Analysis of postponement strategy by EPQ-based models with planned backorders," Omega, Elsevier, vol. 36(5), pages 777-788, October.
  14. Ronald, Robert & Yang, Gino K. & Chu, Peter, 2004. "Technical note: The EOQ and EPQ models with shortages derived without derivatives," International Journal of Production Economics, Elsevier, vol. 92(2), pages 197-200, November.
  15. Chang, Hung-Chi & Ho, Chia-Huei, 2010. "Exact closed-form solutions for "optimal inventory model for items with imperfect quality and shortage backordering"," Omega, Elsevier, vol. 38(3-4), pages 233-237, June.
  16. Sphicas, Georghios P., 2014. "Generalized EOQ formula using a new parameter: Coefficient of backorder attractiveness," International Journal of Production Economics, Elsevier, vol. 155(C), pages 143-147.
  17. Chung, Chun Jen & Wee, Hui Ming, 2007. "Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives," European Journal of Operational Research, Elsevier, vol. 183(2), pages 933-943, December.
  18. Teunter, Ruud & Dekker, Rommert, 2008. "An easy derivation of the order level optimality condition for inventory systems with backordering," International Journal of Production Economics, Elsevier, vol. 114(1), pages 201-204, July.
  19. Amalesh Kumar Manna & Leopoldo Eduardo Cárdenas-Barrón & Barun Das & Ali Akbar Shaikh & Armando Céspedes-Mota & Gerardo Treviño-Garza, 2021. "An Imperfect Production Model for Breakable Multi-Item with Dynamic Demand and Learning Effect on Rework over Random Planning Horizon," JRFM, MDPI, vol. 14(12), pages 1-20, November.
  20. Amir Hossein Nobil & Amir Hosein Afshar Sedigh & Leopoldo Eduardo Cárdenas-Barrón, 2020. "A multiproduct single machine economic production quantity (EPQ) inventory model with discrete delivery order, joint production policy and budget constraints," Annals of Operations Research, Springer, vol. 286(1), pages 265-301, March.
  21. Juanjuan Qin & Xiaojian Bai & Liangjie Xia, 2015. "Sustainable Trade Credit and Replenishment Policies under the Cap-And-Trade and Carbon Tax Regulations," Sustainability, MDPI, vol. 7(12), pages 1-22, December.
  22. Sarkar, Biswajit & Sarkar, Sumon, 2013. "Variable deterioration and demand—An inventory model," Economic Modelling, Elsevier, vol. 31(C), pages 548-556.
  23. Teng, Jinn-Tsair, 2009. "A simple method to compute economic order quantities," European Journal of Operational Research, Elsevier, vol. 198(1), pages 351-353, October.
  24. Chung, Kun-Jen, 2009. ""A note on the economic lot size of the integrated vendor-buyer inventory system derived without derivatives": A comment," European Journal of Operational Research, Elsevier, vol. 198(3), pages 979-982, November.
  25. Egri, Péter & Váncza, József, 2012. "Channel coordination with the newsvendor model using asymmetric information," International Journal of Production Economics, Elsevier, vol. 135(1), pages 491-499.
  26. Luo, Xu-Ren & Chou, Chih-sheng, 2018. "Technical note: Solving inventory models by algebraic method," International Journal of Production Economics, Elsevier, vol. 200(C), pages 130-133.
  27. Sphicas, Georghios P., 2006. "EOQ and EPQ with linear and fixed backorder costs: Two cases identified and models analyzed without calculus," International Journal of Production Economics, Elsevier, vol. 100(1), pages 59-64, March.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.