Technical note: The EOQ and EPQ models with shortages derived without derivatives
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Wee, Hui-Ming, 1999. "Deteriorating inventory model with quantity discount, pricing and partial backordering," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 511-518, March.
- Chung, Kun-Jen & Huang, Yung-Fu, 2003. "The optimal cycle time for EPQ inventory model under permissible delay in payments," International Journal of Production Economics, Elsevier, vol. 84(3), pages 307-318, June.
- Cardenas-Barron, Leopoldo Eduardo, 2001. "The economic production quantity (EPQ) with shortage derived algebraically," International Journal of Production Economics, Elsevier, vol. 70(3), pages 289-292, April.
- Grubbstrom, Robert W. & Erdem, Asli, 1999. "The EOQ with backlogging derived without derivatives," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 529-530, March.
- Papachristos, S. & Skouri, K., 2003. "An inventory model with deteriorating items, quantity discount, pricing and time-dependent partial backlogging," International Journal of Production Economics, Elsevier, vol. 83(3), pages 247-256, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Leung, Kit-Nam Francis, 2010. "Some comments on "A simple method to compute economic order quantities"," European Journal of Operational Research, Elsevier, vol. 201(3), pages 960-961, March.
- Teng, Jinn-Tsair, 2009. "A simple method to compute economic order quantities," European Journal of Operational Research, Elsevier, vol. 198(1), pages 351-353, October.
- Chung, Kun-Jen, 2009. ""A note on the economic lot size of the integrated vendor-buyer inventory system derived without derivatives": A comment," European Journal of Operational Research, Elsevier, vol. 198(3), pages 979-982, November.
- Leung, Kit-Nam Francis, 2008. "Using the complete squares method to analyze a lot size model when the quantity backordered and the quantity received are both uncertain," European Journal of Operational Research, Elsevier, vol. 187(1), pages 19-30, May.
- Jason Chang, S.K. & Chuang, Jones P.C. & Chen, Hsiao-Jung, 2005. "Short comments on technical note--The EOQ and EPQ models with shortages derived without derivatives," International Journal of Production Economics, Elsevier, vol. 97(2), pages 241-243, August.
- Teunter, Ruud & Dekker, Rommert, 2008. "An easy derivation of the order level optimality condition for inventory systems with backordering," International Journal of Production Economics, Elsevier, vol. 114(1), pages 201-204, July.
- Wee, Hui-Ming & Wang, Wan-Tsu & Chung, Chun-Jen, 2009. "A modified method to compute economic order quantities without derivatives by cost-difference comparisons," European Journal of Operational Research, Elsevier, vol. 194(1), pages 336-338, April.
- San-José, Luis A. & Sicilia, Joaquín & García-Laguna, Juan, 2014. "Optimal lot size for a production–inventory system with partial backlogging and mixture of dispatching policies," International Journal of Production Economics, Elsevier, vol. 155(C), pages 194-203.
- Minner, Stefan, 2007. "A note on how to compute economic order quantities without derivatives by cost comparisons," International Journal of Production Economics, Elsevier, vol. 105(1), pages 293-296, January.
- Lee, Shine-Der & Lan, Shu-Chuan, 2013. "Production lot sizing with a secondary outsourcing facility," International Journal of Production Economics, Elsevier, vol. 141(1), pages 414-424.
- Li, Jian & Wang, Shouyang & Cheng, T.C. Edwin, 2008. "Analysis of postponement strategy by EPQ-based models with planned backorders," Omega, Elsevier, vol. 36(5), pages 777-788, October.
- Luo, Xu-Ren & Chou, Chih-sheng, 2018. "Technical note: Solving inventory models by algebraic method," International Journal of Production Economics, Elsevier, vol. 200(C), pages 130-133.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Leung, Kit-Nam Francis, 2010. "Some comments on "A simple method to compute economic order quantities"," European Journal of Operational Research, Elsevier, vol. 201(3), pages 960-961, March.
- Leung, Kit-Nam Francis, 2008. "Using the complete squares method to analyze a lot size model when the quantity backordered and the quantity received are both uncertain," European Journal of Operational Research, Elsevier, vol. 187(1), pages 19-30, May.
- Chiu, Singa Wang, 2008. "Production lot size problem with failure in repair and backlogging derived without derivatives," European Journal of Operational Research, Elsevier, vol. 188(2), pages 610-615, July.
- Roy, Arindam & kar, Samarjit & Maiti, Manoranjan, 2010. "A volume flexible production-policy for randomly deteriorating item with trended demand and shortages," International Journal of Production Economics, Elsevier, vol. 128(1), pages 188-199, November.
- Luo, Xu-Ren & Chou, Chih-sheng, 2018. "Technical note: Solving inventory models by algebraic method," International Journal of Production Economics, Elsevier, vol. 200(C), pages 130-133.
- Sphicas, Georghios P., 2014. "Generalized EOQ formula using a new parameter: Coefficient of backorder attractiveness," International Journal of Production Economics, Elsevier, vol. 155(C), pages 143-147.
- Teunter, Ruud & Dekker, Rommert, 2008. "An easy derivation of the order level optimality condition for inventory systems with backordering," International Journal of Production Economics, Elsevier, vol. 114(1), pages 201-204, July.
- Chung, Chun Jen & Wee, Hui Ming, 2007. "Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives," European Journal of Operational Research, Elsevier, vol. 183(2), pages 933-943, December.
- Lo, Sh-Tyan & Wee, Hui-Ming & Huang, Wen-Chang, 2007. "An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation," International Journal of Production Economics, Elsevier, vol. 106(1), pages 248-260, March.
- Taleizadeh, Ata Allah & Noori-daryan, Mahsa & Cárdenas-Barrón, Leopoldo Eduardo, 2015. "Joint optimization of price, replenishment frequency, replenishment cycle and production rate in vendor managed inventory system with deteriorating items," International Journal of Production Economics, Elsevier, vol. 159(C), pages 285-295.
- San José, L.A. & Sicilia, J. & Garcia-Laguna, J., 2006. "Analysis of an inventory system with exponential partial backordering," International Journal of Production Economics, Elsevier, vol. 100(1), pages 76-86, March.
- Debasis Das & Arindam Roy & Samarjit Kar, 2015. "A multi-warehouse partial backlogging inventory model for deteriorating items under inflation when a delay in payment is permissible," Annals of Operations Research, Springer, vol. 226(1), pages 133-162, March.
- Sarker, Bhaba R. & Rochanaluk, Ratkrit & Yi, Huizhi & Egbelu, Pius J., 2014. "An operational policy for a three-stage distributive supply chain system with retailers’ backorders," International Journal of Production Economics, Elsevier, vol. 156(C), pages 332-345.
- Jason Chang, S.K. & Chuang, Jones P.C. & Chen, Hsiao-Jung, 2005. "Short comments on technical note--The EOQ and EPQ models with shortages derived without derivatives," International Journal of Production Economics, Elsevier, vol. 97(2), pages 241-243, August.
- A.K. Bhunia & A.A. Shaikh & R.K. Gupta, 2015. "A study on two-warehouse partially backlogged deteriorating inventory models under inflation via particle swarm optimisation," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(6), pages 1036-1050, April.
- Minner, Stefan, 2007. "A note on how to compute economic order quantities without derivatives by cost comparisons," International Journal of Production Economics, Elsevier, vol. 105(1), pages 293-296, January.
- Teng, Jinn-Tsair, 2009. "A simple method to compute economic order quantities," European Journal of Operational Research, Elsevier, vol. 198(1), pages 351-353, October.
- Alım, Muzaffer & Beullens, Patrick, 2020. "Joint inventory and distribution strategy for online sales with a flexible delivery option," International Journal of Production Economics, Elsevier, vol. 222(C).
- Chung, Kun-Jen, 2009. ""A note on the economic lot size of the integrated vendor-buyer inventory system derived without derivatives": A comment," European Journal of Operational Research, Elsevier, vol. 198(3), pages 979-982, November.
- Teng, Jinn-Tsair & Ouyang, Liang-Yuh & Chen, Liang-Ho, 2007. "A comparison between two pricing and lot-sizing models with partial backlogging and deteriorated items," International Journal of Production Economics, Elsevier, vol. 105(1), pages 190-203, January.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:92:y:2004:i:2:p:197-200. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.