Economic lot sizing in a production system with random demand
Author
Abstract
Suggested Citation
DOI: 10.1080/00207721.2014.915354
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Pentico, David W. & Drake, Matthew J. & Toews, Carl, 2009. "The deterministic EPQ with partial backordering: A new approach," Omega, Elsevier, vol. 37(3), pages 624-636, June.
- Lee, S. D. & Rung, J. M., 2000. "Production lot sizing in failure prone two-stage serial systems," European Journal of Operational Research, Elsevier, vol. 123(1), pages 42-60, May.
- Eroglu, Abdullah & Ozdemir, Gultekin, 2007. "An economic order quantity model with defective items and shortages," International Journal of Production Economics, Elsevier, vol. 106(2), pages 544-549, April.
- Ben-Daya, M. & Hariga, M., 2004. "Integrated single vendor single buyer model with stochastic demand and variable lead time," International Journal of Production Economics, Elsevier, vol. 92(1), pages 75-80, November.
- Goyal, Suresh Kumar & Cardenas-Barron, Leopoldo Eduardo, 2002. "Note on: Economic production quantity model for items with imperfect quality - a practical approach," International Journal of Production Economics, Elsevier, vol. 77(1), pages 85-87, May.
- Stanley Gershwin & Bariş Tan & Michael Veatch, 2009. "Production control with backlog-dependent demand," IISE Transactions, Taylor & Francis Journals, vol. 41(6), pages 511-523.
- Hariga, Moncer A. & Benkherouf, Lakdere, 1994. "Optimal and heuristic inventory replenishment models for deteriorating items with exponential time-varying demand," European Journal of Operational Research, Elsevier, vol. 79(1), pages 123-137, November.
- Chiu, Singa Wang & Wang, Shan-Ling & Chiu, Yuan-Shyi Peter, 2007. "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns," European Journal of Operational Research, Elsevier, vol. 180(2), pages 664-676, July.
- Lee, Shine-Der & Lan, Shu-Chuan, 2013. "Production lot sizing with a secondary outsourcing facility," International Journal of Production Economics, Elsevier, vol. 141(1), pages 414-424.
- Jaber, M.Y. & Goyal, S.K. & Imran, M., 2008. "Economic production quantity model for items with imperfect quality subject to learning effects," International Journal of Production Economics, Elsevier, vol. 115(1), pages 143-150, September.
- Cardenas-Barron, Leopoldo Eduardo, 2001. "The economic production quantity (EPQ) with shortage derived algebraically," International Journal of Production Economics, Elsevier, vol. 70(3), pages 289-292, April.
- Salameh, M. K. & Jaber, M. Y., 2000. "Economic production quantity model for items with imperfect quality," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 59-64, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Mehmood Khan & Matloub Hussain & Leopoldo Eduardo Cárdenas-Barrón, 2017. "Learning and screening errors in an EPQ inventory model for supply chains with stochastic lead time demands," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4816-4832, August.
- Chang, Hung-Chi & Ho, Chia-Huei, 2010. "Exact closed-form solutions for "optimal inventory model for items with imperfect quality and shortage backordering"," Omega, Elsevier, vol. 38(3-4), pages 233-237, June.
- Sana, Shib Sankar, 2010. "An economic production lot size model in an imperfect production system," European Journal of Operational Research, Elsevier, vol. 201(1), pages 158-170, February.
- Skouri, K. & Konstantaras, I. & Lagodimos, A.G. & Papachristos, S., 2014. "An EOQ model with backorders and rejection of defective supply batches," International Journal of Production Economics, Elsevier, vol. 155(C), pages 148-154.
- Tien-Yu Lin & Kuo-Lung Hou, 2015. "An imperfect quality economic order quantity with advanced receiving," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 23(2), pages 535-551, July.
- Kevin Hsu, Wen-Kai & Yu, Hong-Fwu, 2009. "EOQ model for imperfective items under a one-time-only discount," Omega, Elsevier, vol. 37(5), pages 1018-1026, October.
- Taleizadeh, Ata Allah & Khanbaglo, Mahboobeh Perak Sari & Cárdenas-Barrón, Leopoldo Eduardo, 2016. "An EOQ inventory model with partial backordering and reparation of imperfect products," International Journal of Production Economics, Elsevier, vol. 182(C), pages 418-434.
- Khan, M. & Jaber, M.Y. & Wahab, M.I.M., 2010. "Economic order quantity model for items with imperfect quality with learning in inspection," International Journal of Production Economics, Elsevier, vol. 124(1), pages 87-96, March.
- Khan, M. & Jaber, M.Y. & Guiffrida, A.L. & Zolfaghari, S., 2011. "A review of the extensions of a modified EOQ model for imperfect quality items," International Journal of Production Economics, Elsevier, vol. 132(1), pages 1-12, July.
- Alamri, Adel A. & Syntetos, Aris A., 2018. "Beyond LIFO and FIFO: Exploring an Allocation-In-Fraction-Out (AIFO) policy in a two-warehouse inventory model," International Journal of Production Economics, Elsevier, vol. 206(C), pages 33-45.
- Tapan Kumar Datta, 2017. "Inventory system with defective products and investment opportunity for reducing defective proportion," Operational Research, Springer, vol. 17(1), pages 297-312, April.
- Ivan Darma Wangsa & Hui Ming Wee & Shih-Hsien Tseng, 2019. "A coordinated vendor–buyer system considering loss and damage claims, insurance cost and stochastic lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(3), pages 384-398, June.
- Nasr, Walid W. & Jaber, Mohamad Y., 2019. "Supplier development in a two-level lot sizing problem with non-conforming items and learning," International Journal of Production Economics, Elsevier, vol. 216(C), pages 349-363.
- Yassine, Ali & Maddah, Bacel & Salameh, Moueen, 2012. "Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model," International Journal of Production Economics, Elsevier, vol. 135(1), pages 345-352.
- Javad Asadkhani & Hadi Mokhtari & Saman Tahmasebpoor, 2022. "Optimal lot-sizing under learning effect in inspection errors with different types of imperfect quality items," Operational Research, Springer, vol. 22(3), pages 2631-2665, July.
- Jaber, Mohamad Y. & Zanoni, Simone & Zavanella, Lucio E., 2014. "Economic order quantity models for imperfect items with buy and repair options," International Journal of Production Economics, Elsevier, vol. 155(C), pages 126-131.
- Sudipta Sinha & Nikunja Mohan Modak & Shib Sankar Sana, 2020. "An entropic order quantity inventory model for quality assessment considering price sensitive demand," OPSEARCH, Springer;Operational Research Society of India, vol. 57(1), pages 88-103, March.
- Irfanullah Khan & Jihed Jemai & Han Lim & Biswajit Sarkar, 2019. "Effect of Electrical Energy on the Manufacturing Setup Cost Reduction, Transportation Discounts, and Process Quality Improvement in a Two-Echelon Supply Chain Management under a Service-Level Constrai," Energies, MDPI, vol. 12(19), pages 1-32, September.
- Hsu, Jia-Tzer & Hsu, Lie-Fern, 2013. "An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns," International Journal of Production Economics, Elsevier, vol. 143(1), pages 162-170.
- Sher, Mikhail M. & Kim, Seung-Lae & Banerjee, Avijit & Paz, Michael T., 2018. "A supply chain coordination mechanism for common items subject to failure in the electronics, defense, and medical industries," International Journal of Production Economics, Elsevier, vol. 203(C), pages 164-173.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tsysxx:v:47:y:2016:i:5:p:1142-1154. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TSYS20 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.