EOQ and EPQ with linear and fixed backorder costs: Two cases identified and models analyzed without calculus
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Grubbstrom, Robert W. & Erdem, Asli, 1999. "The EOQ with backlogging derived without derivatives," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 529-530, March.
- Cardenas-Barron, Leopoldo Eduardo, 2001. "The economic production quantity (EPQ) with shortage derived algebraically," International Journal of Production Economics, Elsevier, vol. 70(3), pages 289-292, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Wee, Hui-Ming & Wang, Wan-Tsu & Chung, Chun-Jen, 2009. "A modified method to compute economic order quantities without derivatives by cost-difference comparisons," European Journal of Operational Research, Elsevier, vol. 194(1), pages 336-338, April.
- Chia-Nan Wang & Thanh-Tuan Dang & Ngoc-Ai-Thy Nguyen, 2020. "A Computational Model for Determining Levels of Factors in Inventory Management Using Response Surface Methodology," Mathematics, MDPI, vol. 8(8), pages 1-23, July.
- Francis Leung, Kit-Nam, 2008. "Technical note: A use of the complete squares method to solve and analyze a quadratic objective function with two decision variables exemplified via a deterministic inventory model with a mixture of b," International Journal of Production Economics, Elsevier, vol. 113(1), pages 275-281, May.
- Leung, Kit-Nam Francis, 2008. "Using the complete squares method to analyze a lot size model when the quantity backordered and the quantity received are both uncertain," European Journal of Operational Research, Elsevier, vol. 187(1), pages 19-30, May.
- Leung, Kit-Nam Francis, 2010. "Some comments on "A simple method to compute economic order quantities"," European Journal of Operational Research, Elsevier, vol. 201(3), pages 960-961, March.
- Lee, Shine-Der & Lan, Shu-Chuan, 2013. "Production lot sizing with a secondary outsourcing facility," International Journal of Production Economics, Elsevier, vol. 141(1), pages 414-424.
- Sphicas, Georghios P., 2014. "Generalized EOQ formula using a new parameter: Coefficient of backorder attractiveness," International Journal of Production Economics, Elsevier, vol. 155(C), pages 143-147.
- Kulkarni, Shailesh S., 2008. "Loss-based quality costs and inventory planning: General models and insights," European Journal of Operational Research, Elsevier, vol. 188(2), pages 428-449, July.
- SPRINGAEL, Johan & CORNELISSENS, Trijntje, 2015. "On the counterintuitive behaviour of the economic order quantity in the presence of backorders," Working Papers 2015007, University of Antwerp, Faculty of Business and Economics.
- Teng, Jinn-Tsair, 2009. "A simple method to compute economic order quantities," European Journal of Operational Research, Elsevier, vol. 198(1), pages 351-353, October.
- Leung, Kit-Nam Francis, 2009. "A generalization of sensitivity of the inventory model with partial backorders," European Journal of Operational Research, Elsevier, vol. 196(2), pages 554-562, July.
- Hu, Wan-ting & Kim, Seung-Lae & Banerjee, Avijit, 2009. "An inventory model with partial backordering and unit backorder cost linearly increasing with the waiting time," European Journal of Operational Research, Elsevier, vol. 197(2), pages 581-587, September.
- Chung, Kun-Jen, 2009. ""A note on the economic lot size of the integrated vendor-buyer inventory system derived without derivatives": A comment," European Journal of Operational Research, Elsevier, vol. 198(3), pages 979-982, November.
- Heibatolah Sadeghi & Hêriş Golpîra & Faicel Hnaien & Cosimo Magazzino, 2023. "Pricing-inventory model with discrete demand and delivery orders," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 33(3), pages 119-139.
- Wee, Hui-Ming & Huang, Yen-Deng & Wang, Wan-Tsu & Cheng, Yung-Lung, 2014. "An EPQ model with partial backorders considering two backordering costs," Applied Mathematics and Computation, Elsevier, vol. 232(C), pages 898-907.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Leung, Kit-Nam Francis, 2010. "Some comments on "A simple method to compute economic order quantities"," European Journal of Operational Research, Elsevier, vol. 201(3), pages 960-961, March.
- Leung, Kit-Nam Francis, 2008. "Using the complete squares method to analyze a lot size model when the quantity backordered and the quantity received are both uncertain," European Journal of Operational Research, Elsevier, vol. 187(1), pages 19-30, May.
- Chiu, Singa Wang, 2008. "Production lot size problem with failure in repair and backlogging derived without derivatives," European Journal of Operational Research, Elsevier, vol. 188(2), pages 610-615, July.
- Luo, Xu-Ren & Chou, Chih-sheng, 2018. "Technical note: Solving inventory models by algebraic method," International Journal of Production Economics, Elsevier, vol. 200(C), pages 130-133.
- Sphicas, Georghios P., 2014. "Generalized EOQ formula using a new parameter: Coefficient of backorder attractiveness," International Journal of Production Economics, Elsevier, vol. 155(C), pages 143-147.
- Teunter, Ruud & Dekker, Rommert, 2008. "An easy derivation of the order level optimality condition for inventory systems with backordering," International Journal of Production Economics, Elsevier, vol. 114(1), pages 201-204, July.
- Ronald, Robert & Yang, Gino K. & Chu, Peter, 2004. "Technical note: The EOQ and EPQ models with shortages derived without derivatives," International Journal of Production Economics, Elsevier, vol. 92(2), pages 197-200, November.
- Chung, Chun Jen & Wee, Hui Ming, 2007. "Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives," European Journal of Operational Research, Elsevier, vol. 183(2), pages 933-943, December.
- Sarker, Bhaba R. & Rochanaluk, Ratkrit & Yi, Huizhi & Egbelu, Pius J., 2014. "An operational policy for a three-stage distributive supply chain system with retailers’ backorders," International Journal of Production Economics, Elsevier, vol. 156(C), pages 332-345.
- Jason Chang, S.K. & Chuang, Jones P.C. & Chen, Hsiao-Jung, 2005. "Short comments on technical note--The EOQ and EPQ models with shortages derived without derivatives," International Journal of Production Economics, Elsevier, vol. 97(2), pages 241-243, August.
- Minner, Stefan, 2007. "A note on how to compute economic order quantities without derivatives by cost comparisons," International Journal of Production Economics, Elsevier, vol. 105(1), pages 293-296, January.
- Teng, Jinn-Tsair, 2009. "A simple method to compute economic order quantities," European Journal of Operational Research, Elsevier, vol. 198(1), pages 351-353, October.
- Chung, Kun-Jen, 2009. ""A note on the economic lot size of the integrated vendor-buyer inventory system derived without derivatives": A comment," European Journal of Operational Research, Elsevier, vol. 198(3), pages 979-982, November.
- Egri, Péter & Váncza, József, 2012. "Channel coordination with the newsvendor model using asymmetric information," International Journal of Production Economics, Elsevier, vol. 135(1), pages 491-499.
- Francis Leung, Kit-Nam, 2008. "Technical note: A use of the complete squares method to solve and analyze a quadratic objective function with two decision variables exemplified via a deterministic inventory model with a mixture of b," International Journal of Production Economics, Elsevier, vol. 113(1), pages 275-281, May.
- Chang, Hung-Chi & Ho, Chia-Huei, 2010. "Exact closed-form solutions for "optimal inventory model for items with imperfect quality and shortage backordering"," Omega, Elsevier, vol. 38(3-4), pages 233-237, June.
- Wee, Hui Ming & Chung, Chun Jen, 2007. "A note on the economic lot size of the integrated vendor-buyer inventory system derived without derivatives," European Journal of Operational Research, Elsevier, vol. 177(2), pages 1289-1293, March.
- Wee, Hui-Ming & Wang, Wan-Tsu & Chung, Chun-Jen, 2009. "A modified method to compute economic order quantities without derivatives by cost-difference comparisons," European Journal of Operational Research, Elsevier, vol. 194(1), pages 336-338, April.
- Tseng, Chao-Tang & Wu, Mei-Fang & Lin, Hong-Dar & Chiu, Yuan-Shyi Peter, 2014. "Solving a vendor–buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach," Economic Modelling, Elsevier, vol. 36(C), pages 30-36.
- Sarkar, Biswajit & Sarkar, Sumon, 2013. "An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand," Economic Modelling, Elsevier, vol. 30(C), pages 924-932.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:100:y:2006:i:1:p:59-64. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.