Production lot sizing with a secondary outsourcing facility
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2012.09.008
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Axsäter, Sven, 2011. "Batch quantities when forecasts are improving," International Journal of Production Economics, Elsevier, vol. 133(1), pages 212-215, September.
- Pentico, David W. & Drake, Matthew J. & Toews, Carl, 2009. "The deterministic EPQ with partial backordering: A new approach," Omega, Elsevier, vol. 37(3), pages 624-636, June.
- Vargas, Vicente & Metters, Richard, 2011. "A master production scheduling procedure for stochastic demand and rolling planning horizons," International Journal of Production Economics, Elsevier, vol. 132(2), pages 296-302, August.
- Goyal, S. K. & Giri, B. C., 2003. "The production-inventory problem of a product with time varying demand, production and deterioration rates," European Journal of Operational Research, Elsevier, vol. 147(3), pages 549-557, June.
- Harvey M. Wagner & Thomson M. Whitin, 1958. "Dynamic Version of the Economic Lot Size Model," Management Science, INFORMS, vol. 5(1), pages 89-96, October.
- Rempala, Ryszarda, 2005. "A continuous production-inventory problem with regeneration cycles," International Journal of Production Economics, Elsevier, vol. 93(1), pages 447-454, January.
- Ronald, Robert & Yang, Gino K. & Chu, Peter, 2004. "Technical note: The EOQ and EPQ models with shortages derived without derivatives," International Journal of Production Economics, Elsevier, vol. 92(2), pages 197-200, November.
- Cardenas-Barron, Leopoldo Eduardo, 2001. "The economic production quantity (EPQ) with shortage derived algebraically," International Journal of Production Economics, Elsevier, vol. 70(3), pages 289-292, April.
- B. T. Doshi & F. A. van der Duyn Schouten & J. J. Talman, 1978.
"A Production-Inventory Control Model with a Mixture of Back-Orders and Lost-Sales,"
Management Science, INFORMS, vol. 24(10), pages 1078-1087, June.
- Talman, A.J.J. & van der Duyn Schouten, F.A. & Doshi, B.T., 1978. "A production-inventory control model with a mixture of back-orders and lost sales," Other publications TiSEM acd9ed12-6192-4d9b-88da-b, Tilburg University, School of Economics and Management.
- Sphicas, Georghios P., 2006. "EOQ and EPQ with linear and fixed backorder costs: Two cases identified and models analyzed without calculus," International Journal of Production Economics, Elsevier, vol. 100(1), pages 59-64, March.
- Hariga, Moncer A. & Benkherouf, Lakdere, 1994. "Optimal and heuristic inventory replenishment models for deteriorating items with exponential time-varying demand," European Journal of Operational Research, Elsevier, vol. 79(1), pages 123-137, November.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Shine-Der Lee & Chin-Ming Yang & Shu-Chuan Lan, 2016. "Economic lot sizing in a production system with random demand," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(5), pages 1142-1154, April.
- Martin Albrecht, 2017. "Coordination of dynamic lot-sizing in supply chains," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(3), pages 322-330, March.
- Li, Yantong & Chu, Feng & Chu, Chengbin & Zhu, Zhanguo, 2019. "An efficient three-level heuristic for the large-scaled multi-product production routing problem with outsourcing," European Journal of Operational Research, Elsevier, vol. 272(3), pages 914-927.
- Raj Kumar Bachar & Shaktipada Bhuniya & Santanu Kumar Ghosh & Biswajit Sarkar, 2022. "Controllable Energy Consumption in a Sustainable Smart Manufacturing Model Considering Superior Service, Flexible Demand, and Partial Outsourcing," Mathematics, MDPI, vol. 10(23), pages 1-29, November.
- Mohammed Haoues & Mohammed Dahane & Nadia Kenza Mouss, 2019. "Outsourcing optimization in two-echelon supply chain network under integrated production-maintenance constraints," Journal of Intelligent Manufacturing, Springer, vol. 30(2), pages 701-725, February.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Leung, Kit-Nam Francis, 2010. "Some comments on "A simple method to compute economic order quantities"," European Journal of Operational Research, Elsevier, vol. 201(3), pages 960-961, March.
- Leung, Kit-Nam Francis, 2008. "Using the complete squares method to analyze a lot size model when the quantity backordered and the quantity received are both uncertain," European Journal of Operational Research, Elsevier, vol. 187(1), pages 19-30, May.
- San-José, Luis A. & Sicilia, Joaquín & García-Laguna, Juan, 2014. "Optimal lot size for a production–inventory system with partial backlogging and mixture of dispatching policies," International Journal of Production Economics, Elsevier, vol. 155(C), pages 194-203.
- Teng, Jinn-Tsair, 2009. "A simple method to compute economic order quantities," European Journal of Operational Research, Elsevier, vol. 198(1), pages 351-353, October.
- Chung, Kun-Jen, 2009. ""A note on the economic lot size of the integrated vendor-buyer inventory system derived without derivatives": A comment," European Journal of Operational Research, Elsevier, vol. 198(3), pages 979-982, November.
- Shine-Der Lee & Chin-Ming Yang & Shu-Chuan Lan, 2016. "Economic lot sizing in a production system with random demand," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(5), pages 1142-1154, April.
- Wee, Hui-Ming & Wang, Wan-Tsu & Chung, Chun-Jen, 2009. "A modified method to compute economic order quantities without derivatives by cost-difference comparisons," European Journal of Operational Research, Elsevier, vol. 194(1), pages 336-338, April.
- Wee, Hui-Ming & Huang, Yen-Deng & Wang, Wan-Tsu & Cheng, Yung-Lung, 2014. "An EPQ model with partial backorders considering two backordering costs," Applied Mathematics and Computation, Elsevier, vol. 232(C), pages 898-907.
- Sana, Shib Sankar & Chaudhuri, K.S., 2008. "A deterministic EOQ model with delays in payments and price-discount offers," European Journal of Operational Research, Elsevier, vol. 184(2), pages 509-533, January.
- Luo, Xu-Ren & Chou, Chih-sheng, 2018. "Technical note: Solving inventory models by algebraic method," International Journal of Production Economics, Elsevier, vol. 200(C), pages 130-133.
- Sphicas, Georghios P., 2014. "Generalized EOQ formula using a new parameter: Coefficient of backorder attractiveness," International Journal of Production Economics, Elsevier, vol. 155(C), pages 143-147.
- Teunter, Ruud & Dekker, Rommert, 2008. "An easy derivation of the order level optimality condition for inventory systems with backordering," International Journal of Production Economics, Elsevier, vol. 114(1), pages 201-204, July.
- Sana, Shib Sankar, 2010. "A production-inventory model in an imperfect production process," European Journal of Operational Research, Elsevier, vol. 200(2), pages 451-464, January.
- Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
- Jason Chang, S.K. & Chuang, Jones P.C. & Chen, Hsiao-Jung, 2005. "Short comments on technical note--The EOQ and EPQ models with shortages derived without derivatives," International Journal of Production Economics, Elsevier, vol. 97(2), pages 241-243, August.
- Massonnet, G. & Gayon, J.-P. & Rapine, C., 2014. "Approximation algorithms for deterministic continuous-review inventory lot-sizing problems with time-varying demand," European Journal of Operational Research, Elsevier, vol. 234(3), pages 641-649.
- Minner, Stefan, 2007. "A note on how to compute economic order quantities without derivatives by cost comparisons," International Journal of Production Economics, Elsevier, vol. 105(1), pages 293-296, January.
- Wu, Kan & Yuan, Xue-Ming, 2016. "Optimal production-inventory policy for an integrated multi-stage supply chain with time-varying demandAuthor-Name: Zhao, Shi Tao," European Journal of Operational Research, Elsevier, vol. 255(2), pages 364-379.
- Li, Jian & Wang, Shouyang & Cheng, T.C. Edwin, 2008. "Analysis of postponement strategy by EPQ-based models with planned backorders," Omega, Elsevier, vol. 36(5), pages 777-788, October.
- Pentico, David W. & Drake, Matthew J., 2011. "A survey of deterministic models for the EOQ and EPQ with partial backordering," European Journal of Operational Research, Elsevier, vol. 214(2), pages 179-198, October.
More about this item
Keywords
Production lot sizing; Inventory model; Random demand; Outsourcing;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:141:y:2013:i:1:p:414-424. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.