IDEAS home Printed from https://ideas.repec.org/r/eee/ejores/v66y1993i3p259-271.html
   My bibliography  Save this item

Minimizing variation of production rates in just-in-time systems: A survey

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Boysen, Nils & Bock, Stefan, 2011. "Scheduling just-in-time part supply for mixed-model assembly lines," European Journal of Operational Research, Elsevier, vol. 211(1), pages 15-25, May.
  2. Tamura, Takayoshi & Long, Hong & Ohno, Katsuhisa, 1999. "A sequencing problem to level part usage rates and work loads for a mixed-model assembly line with a bypass subline," International Journal of Production Economics, Elsevier, vol. 60(1), pages 557-564, April.
  3. Nils Boysen & Christian Ringle, 2008. "Über die Wirkung der Optionsbündelung auf die Ablaufplanung einer Variantenfließfertigung," Metrika: International Journal for Theoretical and Applied Statistics, Springer, vol. 18(3), pages 301-321, February.
  4. X. Cai & F. S. Tu, 1996. "Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early‐tardy penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(8), pages 1127-1146, December.
  5. Zhu, Jin & Ding, Fong-Yuen, 2000. "A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines," European Journal of Operational Research, Elsevier, vol. 127(1), pages 203-216, November.
  6. Xiaobo, Zhao & Ohno, Katsuhisa, 2000. "Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages," European Journal of Operational Research, Elsevier, vol. 124(3), pages 560-570, August.
  7. Albert Corominas & Alberto García-Villoria & Rafael Pastor, 2013. "Metaheuristic algorithms hybridised with variable neighbourhood search for solving the response time variability problem," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 21(2), pages 296-312, July.
  8. Boysen, Nils & Emde, Simon, 2014. "Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets," European Journal of Operational Research, Elsevier, vol. 239(3), pages 820-829.
  9. Jin, Mingzhou & Luo, Yi & Eksioglu, Sandra D., 2008. "Integration of production sequencing and outbound logistics in the automotive industry," International Journal of Production Economics, Elsevier, vol. 113(2), pages 766-774, June.
  10. Lebacque, Vassilissa & Jost, Vincent & Brauner, Nadia, 2007. "Simultaneous optimization of classical objectives in JIT scheduling," European Journal of Operational Research, Elsevier, vol. 182(1), pages 29-39, October.
  11. Bautista, J. & Companys, R. & Corominas, A., 1996. "Heuristics and exact algorithms for solving the Monden problem," European Journal of Operational Research, Elsevier, vol. 88(1), pages 101-113, January.
  12. Steiner, George & Yeomans, Julian Scott, 1996. "Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging," European Journal of Operational Research, Elsevier, vol. 95(1), pages 38-52, November.
  13. Johannes Vass & Marie-Louise Lackner & Christoph Mrkvicka & Nysret Musliu & Felix Winter, 2022. "Exact and meta-heuristic approaches for the production leveling problem," Journal of Scheduling, Springer, vol. 25(3), pages 339-370, June.
  14. Corominas, Albert & Kubiak, Wieslaw & Pastor, Rafael, 2010. "Mathematical programming modeling of the Response Time Variability Problem," European Journal of Operational Research, Elsevier, vol. 200(2), pages 347-357, January.
  15. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009. "The product rate variation problem and its relevance in real world mixed-model assembly lines," European Journal of Operational Research, Elsevier, vol. 197(2), pages 818-824, September.
  16. Drexl, Andreas & Kimms, Alf, 1999. "Belastungsorientierte Just-in-Time Variantenfließfertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 502, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  17. Joaquín Bautista & Ramon Companys & Albert Corominas, 1997. "Modelling and solving the production rate variation problem (PRVP)," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 5(2), pages 221-239, December.
  18. Andreas Drexl & Alf Kimms, 2001. "Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints," Management Science, INFORMS, vol. 47(3), pages 480-491, March.
  19. García-Villoria, Alberto & Pastor, Rafael, 2010. "Solving the response time variability problem by means of a genetic algorithm," European Journal of Operational Research, Elsevier, vol. 202(2), pages 320-327, April.
  20. Boysen, Nils & Scholl, Armin & Wopperer, Nico, 2012. "Resequencing of mixed-model assembly lines: Survey and research agenda," European Journal of Operational Research, Elsevier, vol. 216(3), pages 594-604.
  21. Caridi, Maria & Sianesi, Andrea, 2000. "Multi-agent systems in production planning and control: An application to the scheduling of mixed-model assembly lines," International Journal of Production Economics, Elsevier, vol. 68(1), pages 29-42, October.
  22. Takahashi, Katsuhiko & Nakamura, Nobuto, 2002. "Decentralized reactive Kanban system," European Journal of Operational Research, Elsevier, vol. 139(2), pages 262-276, June.
  23. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009. "Sequencing mixed-model assembly lines: Survey, classification and model critique," European Journal of Operational Research, Elsevier, vol. 192(2), pages 349-373, January.
  24. Ioanna Makarouni & John Psarras & Eleftherios Siskos, 2015. "Interactive bicriterion decision support for a large scale industrial scheduling system," Annals of Operations Research, Springer, vol. 227(1), pages 45-61, April.
  25. Matthießen, Lars & Drexl, Andreas & Kimms, Alf, 2000. "Constraint propagation algorithms for the car sequencing problem," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 531, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  26. Balinski, Michel & Ramirez, Victoriano, 1999. "Parametric methods of apportionment, rounding and production," Mathematical Social Sciences, Elsevier, vol. 37(2), pages 107-122, March.
  27. Korkmazel, Tugrul & Meral, Sedef, 2001. "Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems," European Journal of Operational Research, Elsevier, vol. 131(1), pages 188-207, May.
  28. Ding, Fong-Yuen & Zhu, Jin & Sun, Hui, 2006. "Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives," International Journal of Production Economics, Elsevier, vol. 102(1), pages 108-131, July.
  29. García-Villoria, Alberto & Salhi, Said & Corominas, Albert & Pastor, Rafael, 2011. "Hyper-heuristic approaches for the response time variability problem," European Journal of Operational Research, Elsevier, vol. 211(1), pages 160-169, May.
  30. Fliedner, Malte & Boysen, Nils, 2008. "Solving the car sequencing problem via Branch & Bound," European Journal of Operational Research, Elsevier, vol. 191(3), pages 1023-1042, December.
  31. Simon Emde & Lukas Polten, 2019. "Sequencing assembly lines to facilitate synchronized just-in-time part supply," Journal of Scheduling, Springer, vol. 22(6), pages 607-621, December.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.