IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v113y2008i2p766-774.html
   My bibliography  Save this article

Integration of production sequencing and outbound logistics in the automotive industry

Author

Listed:
  • Jin, Mingzhou
  • Luo, Yi
  • Eksioglu, Sandra D.

Abstract

This paper addresses the mixed model assembly line sequencing and outbound logistics planning problems in the automotive industry at the operational level. The decision-making procedures in practice consider these two problems sequentially. This study proposes an integrated scheme coordinating both decisions. We provide mixed integer programming models for production sequencing, logistics planning, and the integrated scheme. The integrated model is simplified based on an understanding of the properties of an optimal solution for the sequencing problem and based on the assumption that there is one closed bottleneck workstation. The numerical experiments demonstrate the benefit of the integration by comparing it with two sequential schemes, the Production-First-Scheme and the Logistics-First-Scheme.

Suggested Citation

  • Jin, Mingzhou & Luo, Yi & Eksioglu, Sandra D., 2008. "Integration of production sequencing and outbound logistics in the automotive industry," International Journal of Production Economics, Elsevier, vol. 113(2), pages 766-774, June.
  • Handle: RePEc:eee:proeco:v:113:y:2008:i:2:p:766-774
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(07)00332-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Candace Arai Yano & Ram Rachamadugu, 1991. "Sequencing to Minimize Work Overload in Assembly Lines with Product Options," Management Science, INFORMS, vol. 37(5), pages 572-586, May.
    2. Eskigun, Erdem & Uzsoy, Reha & Preckel, Paul V. & Beaujon, George & Krishnan, Subramanian & Tew, Jeffrey D., 2005. "Outbound supply chain network design with mode selection, lead times and capacitated vehicle distribution centers," European Journal of Operational Research, Elsevier, vol. 165(1), pages 182-206, August.
    3. Scholl, Armin, 1995. "Balancing and sequencing of assembly lines," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 9690, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    4. Ahmet Bolat, 1997. "Efficient methods for sequencing minimum job sets on mixed model assembly lines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(5), pages 419-437, August.
    5. Nicholas G. Hall & Chris N. Potts, 2003. "Supply chain scheduling: Batching and delivery," Operations Research, INFORMS, vol. 51(4), pages 566-584, August.
    6. F. Fumero & C. Vercellis, 1999. "Synchronized Development of Production, Inventory, and Distribution Schedules," Transportation Science, INFORMS, vol. 33(3), pages 330-340, August.
    7. Morris A. Cohen & Hau L. Lee, 1988. "Strategic Analysis of Integrated Production-Distribution Systems: Models and Methods," Operations Research, INFORMS, vol. 36(2), pages 216-228, April.
    8. Kubiak, Wieslaw, 1993. "Minimizing variation of production rates in just-in-time systems: A survey," European Journal of Operational Research, Elsevier, vol. 66(3), pages 259-271, May.
    9. Chandra, Pankaj & Fisher, Marshall L., 1994. "Coordination of production and distribution planning," European Journal of Operational Research, Elsevier, vol. 72(3), pages 503-517, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Lavoie, P. & Gharbi, A. & Kenné, J.-P., 2010. "A comparative study of pull control mechanisms for unreliable homogenous transfer lines," International Journal of Production Economics, Elsevier, vol. 124(1), pages 241-251, March.
    2. Wang, Yu & Chen, Feng & Chen, Zhi-Long, 2018. "Pickup and delivery of automobiles from warehouses to dealers," Transportation Research Part B: Methodological, Elsevier, vol. 117(PA), pages 412-430.
    3. Ramírez Palencia, Alberto E. & Mejía Delgadillo, Gonzalo E., 2012. "A computer application for a bus body assembly line using Genetic Algorithms," International Journal of Production Economics, Elsevier, vol. 140(1), pages 431-438.
    4. Saurabh Chandra & Debabrata Ghosh & Samir K. Srivastava, 2016. "Outbound logistics management practices in the automotive industry: an emerging economy perspective," DECISION: Official Journal of the Indian Institute of Management Calcutta, Springer;Indian Institute of Management Calcutta, vol. 43(2), pages 145-165, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Guruprasad Pundoor & Zhi‐Long Chen, 2005. "Scheduling a production–distribution system to optimize the tradeoff between delivery tardiness and distribution cost," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 571-589, September.
    2. Zhi-Long Chen & Guruprasad Pundoor, 2006. "Order Assignment and Scheduling in a Supply Chain," Operations Research, INFORMS, vol. 54(3), pages 555-572, June.
    3. Zhi-Long Chen & George L. Vairaktarakis, 2005. "Integrated Scheduling of Production and Distribution Operations," Management Science, INFORMS, vol. 51(4), pages 614-628, April.
    4. Matthießen, Lars & Drexl, Andreas & Kimms, Alf, 2000. "Constraint propagation algorithms for the car sequencing problem," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 531, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    5. Kathryn E. Stecke & Xuying Zhao, 2007. "Production and Transportation Integration for a Make-to-Order Manufacturing Company with a Commit-to-Delivery Business Mode," Manufacturing & Service Operations Management, INFORMS, vol. 9(2), pages 206-224, September.
    6. Anton J. Kleywegt & Vijay S. Nori & Martin W. P. Savelsbergh, 2002. "The Stochastic Inventory Routing Problem with Direct Deliveries," Transportation Science, INFORMS, vol. 36(1), pages 94-118, February.
    7. Drexl, Andreas & Kimms, Alf, 1999. "Belastungsorientierte Just-in-Time Variantenfließfertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 502, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    8. Li, Kunpeng & Sivakumar, Appa Iyer & Ganesan, Viswanath Kumar, 2008. "Analysis and algorithms for coordinated scheduling of parallel machine manufacturing and 3PL transportation," International Journal of Production Economics, Elsevier, vol. 115(2), pages 482-491, October.
    9. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009. "Sequencing mixed-model assembly lines: Survey, classification and model critique," European Journal of Operational Research, Elsevier, vol. 192(2), pages 349-373, January.
    10. J R Montoya-Torres & A Aponte & P Rosas, 2011. "Applying GRASP to solve the multi-item three-echelon uncapacitated facility location problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(2), pages 397-406, February.
    11. Bautista, Joaquin & Cano, Jaime, 2008. "Minimizing work overload in mixed-model assembly lines," International Journal of Production Economics, Elsevier, vol. 112(1), pages 177-191, March.
    12. Lei Lei & Hua Zhong & W. Art Chaovalitwongse, 2009. "On the Integrated Production and Distribution Problem with Bidirectional Flows," INFORMS Journal on Computing, INFORMS, vol. 21(4), pages 585-598, November.
    13. Xiaobo Zhao & Jianyong Liu & Katsuhisa Ohno & Shigenori Kotani, 2007. "Modeling and analysis of a mixed‐model assembly line with stochastic operation times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(6), pages 681-691, September.
    14. Kai-Leung Yung & Jiafu Tang & Andrew W. H. Ip & Dingwei Wang, 2006. "Heuristics for Joint Decisions in Production, Transportation, and Order Quantity," Transportation Science, INFORMS, vol. 40(1), pages 99-116, February.
    15. Schmid, Verena & Doerner, Karl F. & Laporte, Gilbert, 2013. "Rich routing problems arising in supply chain management," European Journal of Operational Research, Elsevier, vol. 224(3), pages 435-448.
    16. Hrabec, Dušan & Hvattum, Lars Magnus & Hoff, Arild, 2022. "The value of integrated planning for production, inventory, and routing decisions: A systematic review and meta-analysis," International Journal of Production Economics, Elsevier, vol. 248(C).
    17. Alvarez, Aldair & Miranda, Pedro & Rohmer, S.U.K., 2022. "Production routing for perishable products," Omega, Elsevier, vol. 111(C).
    18. Hein, Fanny & Almeder, Christian, 2016. "Quantitative insights into the integrated supply vehicle routing and production planning problem," International Journal of Production Economics, Elsevier, vol. 177(C), pages 66-76.
    19. STRACK, Géraldine & FORTZ, Bernard & RIANE, Fouad & VAN VYVE, Mathieu, 2011. "Comparison of heuristic procedures for an integrated model for production and distribution planning in an environment of shared resources," LIDAM Discussion Papers CORE 2011016, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    20. Zakaria Chekoubi & Wajdi Trabelsi & Nathalie Sauer & Ilias Majdouline, 2022. "The Integrated Production-Inventory-Routing Problem with Reverse Logistics and Remanufacturing: A Two-Phase Decomposition Heuristic," Sustainability, MDPI, vol. 14(20), pages 1-30, October.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:113:y:2008:i:2:p:766-774. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.