IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v88y1996i1p101-113.html
   My bibliography  Save this article

Heuristics and exact algorithms for solving the Monden problem

Author

Listed:
  • Bautista, J.
  • Companys, R.
  • Corominas, A.

Abstract

No abstract is available for this item.

Suggested Citation

  • Bautista, J. & Companys, R. & Corominas, A., 1996. "Heuristics and exact algorithms for solving the Monden problem," European Journal of Operational Research, Elsevier, vol. 88(1), pages 101-113, January.
  • Handle: RePEc:eee:ejores:v:88:y:1996:i:1:p:101-113
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0377-2217(94)00165-0
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Thomas L. Morin & Roy E. Marsten, 1976. "Branch-and-Bound Strategies for Dynamic Programming," Operations Research, INFORMS, vol. 24(4), pages 611-627, August.
    2. Robert L. Carraway & Robert L. Schmidt, 1991. "Note---An Improved Discrete Dynamic Programming Algorithm for Allocating Resources Among Interdependent Projects," Management Science, INFORMS, vol. 37(9), pages 1195-1200, September.
    3. Candace Arai Yano & Ram Rachamadugu, 1991. "Sequencing to Minimize Work Overload in Assembly Lines with Product Options," Management Science, INFORMS, vol. 37(5), pages 572-586, May.
    4. John Miltenburg, 1989. "Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems," Management Science, INFORMS, vol. 35(2), pages 192-207, February.
    5. Wieslaw Kubiak & Suresh Sethi, 1991. "A Note on "Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems"," Management Science, INFORMS, vol. 37(1), pages 121-122, January.
    6. Robert R. Inman & Robert L. Bulfin, 1991. "Note---Sequencing JIT Mixed-Model Assembly Lines," Management Science, INFORMS, vol. 37(7), pages 901-904, July.
    7. Kubiak, Wieslaw, 1993. "Minimizing variation of production rates in just-in-time systems: A survey," European Journal of Operational Research, Elsevier, vol. 66(3), pages 259-271, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Tamura, Takayoshi & Long, Hong & Ohno, Katsuhisa, 1999. "A sequencing problem to level part usage rates and work loads for a mixed-model assembly line with a bypass subline," International Journal of Production Economics, Elsevier, vol. 60(1), pages 557-564, April.
    2. Nils Boysen & Christian Ringle, 2008. "Über die Wirkung der Optionsbündelung auf die Ablaufplanung einer Variantenfließfertigung," Metrika: International Journal for Theoretical and Applied Statistics, Springer, vol. 18(3), pages 301-321, February.
    3. Bautista, Joaquín & Pereira, Jordi, 2009. "A dynamic programming based heuristic for the assembly line balancing problem," European Journal of Operational Research, Elsevier, vol. 194(3), pages 787-794, May.
    4. Bautista, Joaquin & Companys, Ramon & Corominas, Albert, 2000. "Note on cyclic sequences in the product rate variation problem," European Journal of Operational Research, Elsevier, vol. 124(3), pages 468-477, August.
    5. Zhu, Jin & Ding, Fong-Yuen, 2000. "A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines," European Journal of Operational Research, Elsevier, vol. 127(1), pages 203-216, November.
    6. Xiaobo, Zhao & Ohno, Katsuhisa, 2000. "Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages," European Journal of Operational Research, Elsevier, vol. 124(3), pages 560-570, August.
    7. Boysen, Nils & Emde, Simon, 2014. "Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets," European Journal of Operational Research, Elsevier, vol. 239(3), pages 820-829.
    8. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009. "The product rate variation problem and its relevance in real world mixed-model assembly lines," European Journal of Operational Research, Elsevier, vol. 197(2), pages 818-824, September.
    9. Bautista, Joaquin & Cano, Jaime, 2008. "Minimizing work overload in mixed-model assembly lines," International Journal of Production Economics, Elsevier, vol. 112(1), pages 177-191, March.
    10. Joaquín Bautista & Jordi Pereira & Belarmino Adenso-Díaz, 2008. "A Beam Search approach for the optimization version of the Car Sequencing Problem," Annals of Operations Research, Springer, vol. 159(1), pages 233-244, March.
    11. Sabuncuoglu, Ihsan & Gocgun, Yasin & Erel, Erdal, 2008. "Backtracking and exchange of information: Methods to enhance a beam search algorithm for assembly line scheduling," European Journal of Operational Research, Elsevier, vol. 186(3), pages 915-930, May.
    12. Caridi, Maria & Sianesi, Andrea, 2000. "Multi-agent systems in production planning and control: An application to the scheduling of mixed-model assembly lines," International Journal of Production Economics, Elsevier, vol. 68(1), pages 29-42, October.
    13. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009. "Sequencing mixed-model assembly lines: Survey, classification and model critique," European Journal of Operational Research, Elsevier, vol. 192(2), pages 349-373, January.
    14. Ioanna Makarouni & John Psarras & Eleftherios Siskos, 2015. "Interactive bicriterion decision support for a large scale industrial scheduling system," Annals of Operations Research, Springer, vol. 227(1), pages 45-61, April.
    15. F. Tanhaie & M. Rabbani & N. Manavizadeh, 2020. "Applying available-to-promise (ATP) concept in mixed-model assembly line sequencing problems in a Make-To-Order (MTO) environment: problem extension, model formulation and Lagrangian relaxation algori," OPSEARCH, Springer;Operational Research Society of India, vol. 57(2), pages 320-346, June.
    16. Aigbedo, Henry, 2007. "An assessment of the effect of mass customization on suppliers' inventory levels in a JIT supply chain," European Journal of Operational Research, Elsevier, vol. 181(2), pages 704-715, September.
    17. Ding, Fong-Yuen & Zhu, Jin & Sun, Hui, 2006. "Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives," International Journal of Production Economics, Elsevier, vol. 102(1), pages 108-131, July.
    18. Bautista, Joaquín & Pereira, Jordi, 2011. "Procedures for the Time and Space constrained Assembly Line Balancing Problem," European Journal of Operational Research, Elsevier, vol. 212(3), pages 473-481, August.
    19. Bautista, Joaquín & Cano, Alberto & Alfaro, Rocío, 2012. "Models for MMSP-W considering workstation dependencies: A case study of Nissan’s Barcelona plant," European Journal of Operational Research, Elsevier, vol. 223(3), pages 669-679.
    20. Simon Emde & Lukas Polten, 2019. "Sequencing assembly lines to facilitate synchronized just-in-time part supply," Journal of Scheduling, Springer, vol. 22(6), pages 607-621, December.
    21. Bautista, Joaquín & Cano, Alberto, 2011. "Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules," European Journal of Operational Research, Elsevier, vol. 210(3), pages 495-513, May.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Drexl, Andreas & Kimms, Alf, 1999. "Belastungsorientierte Just-in-Time Variantenfließfertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 502, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    2. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009. "Sequencing mixed-model assembly lines: Survey, classification and model critique," European Journal of Operational Research, Elsevier, vol. 192(2), pages 349-373, January.
    3. Ding, Fong-Yuen & Zhu, Jin & Sun, Hui, 2006. "Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives," International Journal of Production Economics, Elsevier, vol. 102(1), pages 108-131, July.
    4. Drexl, Andreas & Jordan, Carsten, 1994. "Materialflußorientierte Produktionssteuerung bei Variantenfließfertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 362, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    5. Andreas Drexl & Alf Kimms, 2001. "Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints," Management Science, INFORMS, vol. 47(3), pages 480-491, March.
    6. Korkmazel, Tugrul & Meral, Sedef, 2001. "Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems," European Journal of Operational Research, Elsevier, vol. 131(1), pages 188-207, May.
    7. Matthießen, Lars & Drexl, Andreas & Kimms, Alf, 2000. "Constraint propagation algorithms for the car sequencing problem," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 531, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    8. Ioanna Makarouni & John Psarras & Eleftherios Siskos, 2015. "Interactive bicriterion decision support for a large scale industrial scheduling system," Annals of Operations Research, Springer, vol. 227(1), pages 45-61, April.
    9. Wieslaw Kubiak & Mesut Yavuz, 2008. "Just-in-Time Smoothing Through Batching," Manufacturing & Service Operations Management, INFORMS, vol. 10(3), pages 506-518, June.
    10. Corominas, Albert & Kubiak, Wieslaw & Pastor, Rafael, 2010. "Mathematical programming modeling of the Response Time Variability Problem," European Journal of Operational Research, Elsevier, vol. 200(2), pages 347-357, January.
    11. Steiner, George & Yeomans, Julian Scott, 1996. "Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging," European Journal of Operational Research, Elsevier, vol. 95(1), pages 38-52, November.
    12. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009. "The product rate variation problem and its relevance in real world mixed-model assembly lines," European Journal of Operational Research, Elsevier, vol. 197(2), pages 818-824, September.
    13. Zhu, Jin & Ding, Fong-Yuen, 2000. "A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines," European Journal of Operational Research, Elsevier, vol. 127(1), pages 203-216, November.
    14. Yavuz, Mesut & Tufekci, Suleyman, 2006. "A bounded dynamic programming solution to the batching problem in mixed-model just-in-time manufacturing systems," International Journal of Production Economics, Elsevier, vol. 103(2), pages 841-862, October.
    15. Boysen, Nils & Bock, Stefan, 2011. "Scheduling just-in-time part supply for mixed-model assembly lines," European Journal of Operational Research, Elsevier, vol. 211(1), pages 15-25, May.
    16. Nils Boysen & Christian Ringle, 2008. "Über die Wirkung der Optionsbündelung auf die Ablaufplanung einer Variantenfließfertigung," Metrika: International Journal for Theoretical and Applied Statistics, Springer, vol. 18(3), pages 301-321, February.
    17. Bautista, Joaquin & Companys, Ramon & Corominas, Albert, 2000. "Note on cyclic sequences in the product rate variation problem," European Journal of Operational Research, Elsevier, vol. 124(3), pages 468-477, August.
    18. Fliedner, Malte & Boysen, Nils, 2008. "Solving the car sequencing problem via Branch & Bound," European Journal of Operational Research, Elsevier, vol. 191(3), pages 1023-1042, December.
    19. Xiaobo, Zhao & Ohno, Katsuhisa, 2000. "Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages," European Journal of Operational Research, Elsevier, vol. 124(3), pages 560-570, August.
    20. Aigbedo, Henry, 2007. "An assessment of the effect of mass customization on suppliers' inventory levels in a JIT supply chain," European Journal of Operational Research, Elsevier, vol. 181(2), pages 704-715, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:88:y:1996:i:1:p:101-113. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.